Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16273A547 + (FA Instrument 2016 Enclosure)
- ML021750575 + (FAA Letter Regarding Proposed Airport Near Comanche Peak Steam Electric Statiion)
- ML070570237 + (FAC Program, EN-DC-315, Rev. 0, 05000271-07-006)
- L-PI-04-065, FAI/01-86, Rev 1 Gap - User Documentation + (FAI/01-86, Rev 1 Gap - User Documentation)
- ML110480452 + (FAI/09-130-NP, Rev. 0, Technical Basis for Gas Transport to the Pump Suction)
- ML13198A463 + (FAI/13-0392 - Request for Additional Information by the Office of Nuclear Reactor Regulation Joseph M. Farley Nuclear Plants, Units 1 and 2 Southern Nuclear Operating Company, Project No.: SNC-WRAI-CST-Vortex)
- 05000387/FIN-2012005-01 + (FAILURE TO DEMONSTRATE EFFECTIVE PREVENTIVE MAINTENANCE UNDER 50.65(a)(2))
- 05000266/FIN-2012004-08 + (FAILURE TO INCORPORATE WOG ERG, REVISION 2, INTO THE EOPs)
- 05000285/FIN-2007007-06 + (FAILURE TO INSTALL TEMPERATURE MONITORING (Section 1R21.b.6))
- 05000244/FIN-2006004-02 + (FAILURE TO MAKE A 10CFR50.72(b)(3)(v)(A) NOTIFICATION)
- 05000263/FIN-2012002-01 + (FAILURE TO MONITOR CONDENSATE FEEDWATER SYSTEM UNDER 50.65(a)(1) DUE TO INADEQUATE MAINTENANCE RULE FAILURE TRACKING)
- 05000263/FIN-2012003-01 + (FAILURE TO MONITOR RESIDUAL HEAT REMOVAL SYSTEM UNDER 10 CFR 50.56(a)(1) DUE TO INAPPROPRIATE A(2) TRANSITION)
- 05000263/FIN-2012002-02 + (FAILURE TO MONITOR RESIDUAL HEAT REMOVAL SYSTEM UNDER 50.65(a)(1) DUE TO INADEQUATE MAINTENANCE RULE EVALUATIONS)
- 05000263/FIN-2012003-02 + (FAILURE TO MONITOR SSF PLANT LEVEL PERFORMANCE CRITERION EQUIPMENT UNDER 10 CFR 50.56(a)(1) DUE TO INADEQUATE SSF DATA TRACKING)
- 05000266/FIN-2012004-09 + (FAILURE TO PERFORM ADEQUATE EVALUATIONS TO ENSURE COMPLIANCE WITH 10 CFR 72.212(b)(6) AND 10 CFR 72.122(b)(2)(i))
- 05000272/LER-2002-009 + (FAILURE TO PERFORM REQUIRED ACTION OF TECHNICAL SPECIFICATION 3.1.3.2.1.)
- 05000266/FIN-2006004-04 + (FAILURE TO UPDATE AND MAINTAIN THE FSAR AS REQUIRED BY 10 CFR 50.71(e))
- ML120260440 + (FAQ - NFPA 805 Monitoring)
- ML16118A086 + (FAQ 10-0059 - NFPA 805 Monitoring Program, Screening Criteria, Action Levels, and Definitions of Compartments)
- ML120260370 + (FAQ 10-0059 Rev. 3 for NRC Review)
- ML18040B174 + (FAQ 14-0007: Transient Fire Frequency Likelihood - Draft)
- ML16118A085 + (FAQ 14-0071 - Acceptable Uses for Non IEEE 383 Cables)
- ML17258A686 + (FAQ 16-0010 Alt Method Ign Freq Weighting-Final Rev B 08302017)
- ML18074A021 + (FAQ 16-0011 Cable Tray Ignition r3 011718)
- ML17129A042 + (FAQ 16-02, Watts Bar 2 Baseline Planned UA and CCF (Final))
- ML17125A070 + (FAQ 16-04)
- ML18075A071 + (FAQ 17-0013 Close Out Memorandum)
- ML17207A096 + (FAQ 17-01: Grand Gulf June 2016 Power Change (Final NRC Response))
- ML17207A100 + (FAQ 17-02: Palo Verde Unit 3 Scram (Final NRC Response))
- ML18045A038 + (FAQ 17-04 Final Response, Watts Bar Unit 2 MSPI Effectiveness Date)
- ML18017A125 + (FAQ 17-04: Watts Bar Unit 2 MSPI Effectiveness Date -- Draft NRC Response)
- ML17345A052 + (FAQ 17-04: Watts Bar Unit 2 MSPI Effectiveness Date)
- ML18045A041 + (FAQ 17-05 Withdrawn and Final Response, Watts Bar 2 MSPI MS09 Effectiveness Date)
- ML17345A055 + (FAQ 17-05: Watts Bar 2 MSPI MS09 Effectiveness Date)
- ML18073A355 + (FAQ 18-0014 - Time to Detection Is Zero for Manual Non-Suppression Probability)
- ML18263A104 + (FAQ 18-0014 Summary Position to NEI 9/19/2018)
- ML18040B173 + (FAQ 18-0015 - More Realistic Contained Fire Duration Limits - Draft)
- ML18073A352 + (FAQ 18-0017 Conditional Trip Probability for Modeling Operator Discretion)
- ML18144A961 + (FAQ 18-01 Definition of Initial Transient Final Approved)
- ML18044A035 + (FAQ 18-01, Definition of Initial Transient)
- ML18088A821 + (FAQ 18-02 Proposed NRC Response - Watts Bar Critical Hours)
- ML18136A858 + (FAQ 18-02 Rev 1 - Watts Bar Critical Hours)
- ML18136A868 + (FAQ 18-02 Rev 2 Proposed NRC Response Rev 2)
- ML18144A967 + (FAQ 18-02 Rev 2 Tentatively Approved)
- ML18136A865 + (FAQ 18-02 Rev. 2 Watts Bar Critical Hours)
- ML18144A977 + (FAQ 18-03 Columbia Scram Exemption Request Final Approved)
- ML18116A107 + (FAQ 18-03 Columbia Scram Exemption Request Proposed Response)
- ML18232A233 + (FAQ 18-04 ANO-1 Uswc Rev 1 Wapproved Final NRC Response, August 20, 2018)
- ML18229A022 + (FAQ 18-04: ANO 1 Scram One Time Exemption Request)
- ML19024A500 + (FAQ 18-05 Turkey Point U3 Scram Rev 1 - Final Approved)
- ML19014A032 + (FAQ 18-05 Turkey Point U3 Scram Rev 1 - Proposed NRC Response)