Browse wiki

Jump to navigation Jump to search
The inspectors identified that on two occaThe inspectors identified that on two occasions Ginna personnel failed to notify the NRC that offsite power to the plant was inoperable. Specifically, on July 17 and August 1, 2006, Ginna did not report to the NRC that offsite power to the plant was inoperable. The finding was determined to be a non-cited violation of 10 CFR 50.72, Immediate Notification Requirements for Operating Nuclear Power Reactors. This deficiency was evaluated using the traditional enforcement process since the failure to make a required report could adversely impact the NRCs ability to carry out its regulatory mission. Because this finding was of very low safety significance and has been entered into the corrective action program it is being treated as an NCV.ion program it is being treated as an NCV.  +
23:59:59, 30 September 2006  +
05000244  +
23:59:59, 30 September 2006  +
Has query"Has query" is a predefined property that represents meta information (in form of a <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Subobject">subobject</a>) about individual queries and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
Modification date"Modification date" is a predefined property that corresponds to the date of the last modification of a subject and is provided by <a rel="nofollow" class="external text" href="https://www.semantic-mediawiki.org/wiki/Help:Special_properties">Semantic MediaWiki</a>.
17:21:05, 1 October 2017  +
23:59:59, 30 September 2006  +
FAILURE TO MAKE A 10CFR50.72(b)(3)(v)(A) NOTIFICATION  +