Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Enclosure 4: Affidavit". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML13323A186  + (Enclosure 4-1 - Risk-Informed Closure of GSI-191, Volume 1)
  • ML13175A212  + (Enclosure 4-1 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 1 Project Summary)
  • ML23101A037  + (Enclosure 4-1, Comparison Table of Safety Analysis Reports for the JMS-87Y-18.5T Dated March 2004 and March 2023, Revision 1 (J/2044/B(U)F))
  • ML23115A082  + (Enclosure 4-1, Comparison Table of the 2019 Safety Evaluation Report (SAR) (J/61/B(U)F-96) and the 2023 SAR (J/2045/B(U)F) for the Model No. JRC-80Y-20T (Non-Proprietary))
  • ML23333A100  + (Enclosure 4-2 (Redacted), Affidavit, Trade Secrets or Commercial Information, NFS Follow Up Questions on NRCs Response to NFS Position Paper on the Applicability of 10 CFR 71.15 to Shipments)
  • ML13323A189  + (Enclosure 4-2 - Risk-Informed Closure of GSI-191, Volume 2 Probabilistic Risk Analysis)
  • ML13175A236  + (Enclosure 4-2 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 2 Probabilistic Risk Analysis, Page 136 of 256 Through Page 256 of 256)
  • ML13175A235  + (Enclosure 4-2 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 2 Probabilistic Risk Analysis, Page 1 of 256 Through Page 135 of 256)
  • ML13323A190  + (Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Cover - Page 211 of 248)
  • ML13323A191  + (Enclosure 4-3 Risk-Informed Closure of GSI-191, Volume 3, Engineering (Casa Grande) Analysis, Page 212 of 1-122)
  • NOC-AE-13002986, Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End  + (Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End)
  • ML13175A241  + (Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 161 of 260 Through End)
  • ML13175A240  + (Enclosure 4-3 to NOC-AE-13002986, Risk-Informed Closure of GSI-191 Volume 3 Engineering Casa Grande Analysis, Page 1 of 260 Through Page 160 of 260)
  • ML12271A479  + (Enclosure 40 to ULNRC-05893 - Mdnr (Missouri Department of Natural Resources) 2009b. Callaway 2 Water District Pwss Report 3024085)
  • ML12271A480  + (Enclosure 41 to ULNRC-05893 - Rizzo (Rizzo Associates, Inc) 2008. Final Groundwater Model Report (Rev 1, Callaway Nuclear Power Plant, October))
  • ML12271A486  + (Enclosure 42 to ULNRC-05893 - Terracon 2010. Groundwater Monitoring, Fuel Groundwater Wells. February)
  • ML12271A487  + (Enclosure 43 to ULNRC-05893 - Tetra Tech 2010. Map Showing Location of Callaway 2 Water District and Fulton Water District Public Supply Wells. January)
  • ML12271A488  + (Enclosure 44 to ULNRC-05893 - Ameren Missouri. 2011. 2010 Annual Radiological Environmental Operating Report for the Callaway Plant. USNRC-05785. April 29, 2011)
  • ML12271A489  + (Enclosure 45 to ULNRC-05893 - Usace (United States Army Corps of Engineers) 2003. Final Environmental Impact Statement for the Missouri River Fish and Wildlife Mitigation Project. Usace. Kansas City District and Omaha District)
  • ULNRC-05893, Enclosure 46 to ULNRC-05893 - Management Agreement for the Public Use of Lands  + (Enclosure 46 to ULNRC-05893 - Management Agreement for the Public Use of Lands)
  • ML040020046  + (Enclosure 4: 12/16/2003, Risk Managed Technical Specifications Guidelines)
  • 1CAN112401, Enclosure 4: ANO-1 TS Table of Contents and TS Bases  + (Enclosure 4: ANO-1 TS Table of Contents and TS Bases)
  • ML18228A679  + (Enclosure 4: APR1400 DCD Renumbering Matrix Table (Non-Proprietary))
  • ML18178A020  + (Enclosure 4: Additional Changes Not Associated with the Rsis and Observations)
  • ML19058A283  + (Enclosure 4: Additional Changes Not Associated with the RAIs)
  • ML19156A042  + (Enclosure 4: Additional Changes Not Associated with the RAIs (Public))
  • ML23146A197  + (Enclosure 4: Affidavit Dated May 2023)
  • ML24030A980  + (Enclosure 4: Affidavit Pursuant to 10 CFR 2.390 to Withhold Information from Public Disclosure)
  • ML25265A150  + (Enclosure 4: Affidavit Pursuant to 10 CFR 2.390)
  • ML24204A097  + (Enclosure 4: Affidavit Supporting Request for Withholding from Public Disclosure)
  • ML24157A050  + (Enclosure 4: Affidavit for Proprietary Slides)
  • ML17207A173  + (Enclosure 4: Affidavit of Electric Power Research Institute, Inc and Areva)
  • ML21326A210  + (Enclosure 4: Affidavit of James Costedio)
  • ML22271A967  + (Enclosure 4: Affidavit of James Costedio)
  • ML23194A061  + (Enclosure 4: Affidavit of Justin R. Hawkins)
  • ULNRC-06948, Enclosure 4: Affidavits for Proprietary Documents  + (Enclosure 4: Affidavits for Proprietary Documents)
  • ULNRC-06956, Enclosure 4: Affidavits for Proprietary Documents  + (Enclosure 4: Affidavits for Proprietary Documents)
  • ML19309F162  + (Enclosure 4: Amendment 22 - Special Nuclear Materials License 1151 (Public))
  • ML17362A059  + (Enclosure 4: Ameren Corp - 2016 Annual Report (Filed 02/28/2017 Includes 2016 Form 10-K))
  • ULNRC-06400, Enclosure 4: Ameren Corp - 2016 Annual Report (Filed 02/28/2017 Includes 2016 Form 10-K)  + (Enclosure 4: Ameren Corp - 2016 Annual Report (Filed 02/28/2017 Includes 2016 Form 10-K))
  • ML18145A133  + (Enclosure 4: Appendix C of the Fssr, RESRAD-BUILD Evaluations)
  • ML19127A207  + (Enclosure 4: Assessment Plan for Generic Issue on High Energy Arc Faults Involving Aluminum Changes Made as a Result of Addressing Public Interaction Are Identified in Red)
  • ML20246G706  + (Enclosure 4: Attachment 1 - PWROG-18005-NP, Revision 2, Determination of Unirradiated RT and Upper-Shelf Values of the North Anna Units 1 and 2 Reactor Vessel Materials)
  • ML20246G709  + (Enclosure 4: Attachment 2 - WCAP-18353-NP, Rev. 0, Reactor Internals Fluence Evaluation for a Westinghouse 3-Loop Plant with Two Units - Subsequent License Renewal)
  • ML20246G701  + (Enclosure 4: Attachment 3 - WCAP-18364-NP, Rev. 1, North Anna Units 1 and 2 Time-Limited Aging Analysis on Reactor Vessel Integrity for Subsequent License Renewal (SLR))
  • ML20246G707  + (Enclosure 4: Attachment 4 - WCAP-11164-NP, Rev. 2, Technical Justification for Eliminating Large Primary Loop Pipe Rupture as the Structural Design Basis for North Anna Units 1 and 2 Nuclear Power Plants for the Subsequent License Renewal)
  • ML23198A298  + (Enclosure 4: Biennial Report of 10 CFR 72.48 Evaluations Performed for CoC 1042 for the Period 02/01/2022 to 07/17/2023)
  • ML061030309  + (Enclosure 4: Big Rock Point Restoration Project, Draft Final Status Survey Report)
  • ML25085A006  + (Enclosure 4: Book and Market Summary - 31 December 2024)
  • ML061730164  + (Enclosure 4: CPSES Comments on and Input to NRC Draft Trip Report)