Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20084H709 + (Eighth Interim Deficiency Rept Re Potential Design Deficiency in Valve Yoke to Motor Mount Weld.Initially Reported on 740514.Alternate Solution,Using Downstream Orifice Plate Installed Inside Torus,Implemented)
- ML20064M538 + (Eighth Interim Deficiency Rept Re Seismic Qualification of B&W Equipment in TVA Panels.Initially Reported on 801124. Affected Equipment Being Requalified by Bailey Meter Co Through B&W.Next Rept Due by 830909)
- ML20041A736 + (Eighth Interim Deficiency Rept Re Welding of Structural Steel Annulus Floor Framing,Initially Reported 800415.All 566 Welds Reinspected & Data Currently Under Evaluation.Next Rept Will Be Submitted by 820504)
- ML20082S792 + (Eighth Interim Rept Re Significant Const Deficiency 37 Concerning Temp Detector Failures.Corrective Action & Supporting Documentation Review Scheduled for Completion by End of Dec 1983.Final Rept Will Be Submitted by 840120)
- ML20077J438 + (Eighth Interim Rept Re Significant Const Deficiency 33, Chilled Water Piping Supports. Supporting Documentation Currently Under Review.Final Rept Will Be Submitted by 830916)
- ML20083N650 + (Eighth Interim Significant Const Deficiency Rept 57 Re Inadequate Instrumentation & Control Installations Turnover Documentation.Corrective Actions Will Be Reviewed in Late May 1984.Final Rept by 840615)
- ML20084H723 + (Eighth Interim Significant Const Deficiency Rept 60 Re Turnover Documentation & Inadequate Hanger Weld Problems T&B.Documentation Reviews & Field Verification Scheduled to Be Completed in mid-May 1984.Final Rept Expected by 840525)
- ML20083P841 + (Eighth Interim Significant Const Deficiency Rept 78 Re American Bridge Structural Steel Defects.Review of Supporting Documentation Scheduled for Completion in Late 1984.Final Rept Will Be Submitted by 840430)
- ML20071A120 + (Eighth Motion for Summary Disposition of Contention Necnp I.A.2.No Genuine Issue of Matl Fact Exists & Applicant Entitled to Favorable Decision.Related Correspondence)
- ML20198B154 + (Eighth Partial Response to FOIA Request for Records Underlying Enforcement Action EA-84-93.App DD Documents Available in Pdr.App Ee Documents Withheld (Ref FOIA Exemption 5))
- ML20134M890 + (Eighth Partial Response to FOIA Request for Documents. Records in App O Encl & Already Available in Pdr.App P Records Being Made Available in PDR)
- ML20134M893 + (Eighth Partial Response to FOIA Request for Documents. Records in App O Encl & Already Available in Pdr.App P Records Being Made Available in PDR)
- ML20150D808 + (Eighth Partial Response to FOIA Request for Documents.App H Documents Available in Pdr.No Record Available on K Combs)
- ML20216B877 + (Eighth Partial Response to FOIA Request for Documents. Records in App I Being Withheld in Entirety (Ref FOIA Exemption 5))
- ML20236U031 + (Eighth Partial Response to FOIA Request for Documents Re Suppl 2 to NUREG-0675 Concerning Operation of Facility. Forwards Documents Listed in App Q.Documents Also Available in PDR)
- ML20147B836 + (Eighth Partial Response to FOIA Request for Documents. Forwards Records in App S.Records Available in Pdr.App T Records Being Withheld in Entirety (Ref FOIA Exemption 5))
- ML20106C803 + (Eighth Partial Response to FOIA Request for Six Categories of Info Re Application of Sholly Amend to Consideration of Amend to DPR-50.Forwards Documents Listed in App. Documents Also Available in PDR)
- ML20134M969 + (Eighth Partial Response to FOIA Request for Documents. Documents Listed in App O Partially Withheld (Ref FOIA Exemption 7))
- ML20134M972 + (Eighth Partial Response to FOIA Request for Documents. Documents Listed in App O Partially Withheld (Ref FOIA Exemption 7))
- ML20248L140 + (Eighth Partial Response to FOIA Request for Records.Records in App J Encl & Being Made Available in Pdr.Records in App K Partially Withheld (Ref Exemption 7C))
- ML20205M043 + (Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR)
- ML20235H335 + (Eighth Partial Response to FOIA Request.App F Documents Re Pullman Power Products,Available in Pdr.App G Documents Encl & Available in PDR & Lpdr)
- ML20135F266 + (Eighth Partial Response to Rorem 850702 First Set of QA Interrogatories & Request to Produce.Qa Audit Program Comprehensive.Certificate of Svc & Audit Repts Encl.Related Correspondence)
- CNL-15-066, Eighth Progress Update on Improved Flood Mitigation System Project + (Eighth Progress Update on Improved Flood Mitigation System Project)
- ML15098A199 + (Eighth Progress Update on Improved Flood Mitigation System Project)
- CPSES-200600269, Eighth Refueling Outage (2RF08) Steam Generator Twelve Month Report + (Eighth Refueling Outage (2RF08) Steam Generator Twelve Month Report)
- ML20046B535 + (Eighth Refueling Outage Inservice Insp Summary Rept)
- CPSES-200200376, Eighth Refueling Outage Steam Generator Twelve Month Special Report 1-SR-02-001-00 + (Eighth Refueling Outage Steam Generator Twelve Month Special Report 1-SR-02-001-00)
- ML20083G391 + (Eighth Request for Interrogatories on Contention VI-1 Re Audit Repts)
- ML20151Y179 + (Eighth Semiannual Staff Evaluation of Status of Nprds)
- ML20088A159 + (Eighth Set of Interrogatories & Requests for Production of Documents.Certificate of Svc Encl.Related Correspondence)
- ML20041E070 + (Eighth Set of Interrogatories & Requests to Produce. Certificate of Svc Encl.Related Correspondence)
- ML20137P630 + (Eighth Set of Interrogatories & Requests for Production of Documents Re Adequacy of Existing QA Program Described in FSAR Through 851115 Amend 52 & Util Ltrs Through 860110. Certificate of Svc Encl.Related Correspondence)
- ML19312D055 + (Eighth Set of Interrogatories Directed to Applicant.Includes Questions on Control Room Displays for Valves & Other Remotely Controlled Instruments,On Control Room Design & on steel-liner Bulge.Power Interchange Table Encl for Updating)
- ML20072R739 + (Eighth Set of Interrogatories on Contentions Re ALARA & Emergency Planning.Certificate of Svc Encl.Related Correspondence)
- ML20028A318 + (Eighth Set of Interrogatories.Certificate of Svc Encl. Related Correspondence)
- RS-18-059, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident + (Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident)
- RS-18-058, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under . + (Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under .)
- RS-18-060, Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable . + (Eighth Six-Month Status Report for Phases 1 and 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable .)
- JAFP-17-0018, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051))
- ML17045A608 + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049), PLA-7570)
- CNL-18-084, Eighth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions + (Eighth Six-Month Status Report in Response to the June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions)
- ML17059D129 + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events)
- RS-17-021, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events)
- CNL-17-016, Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) + (Eighth Six-Month Status Report in Response to the March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049))
- JAFP-17-0017, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events)
- RS-17-022, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- RS-17-019, Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (Eighth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- NL-18-0870, Eighth Six-Month Status Report of the Implementation of the Commission Order with Regard to Requirements for Reliable Hardened Containment Vents (EA-13-109) + (Eighth Six-Month Status Report of the Implementation of the Commission Order with Regard to Requirements for Reliable Hardened Containment Vents (EA-13-109))
- ML19296B656 + (Eighth Status Rept Per Aslab 790607 Grant of Indefinite Extension of Time to Respond to Suffolk County Motion to File Supplement Brief.Special Inquiry Group Rept Issued.Task Action Plan Being Prepared.Certificate of Svc Encl)
- ML022540577 + (Eighth Supplemental Declaration of Thomas E. Lumsden in Support of Revised Application of Official Committee of Unsecured Creditors for Order Under 11 U.S.C. 1103 and 328 and F.R.B.P. 2014 and 2016 Authorizing Retention and Employment of)