MONTHYEARML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217F1261999-10-12012 October 1999 Forwards Update to Previously Submitted RELAP5 Analytical Assumptions for App R,Re RAI of 961104 BVY-99-130, Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station1999-10-0808 October 1999 Provides Clarification of Method for Determining MSIV Maximum & Minimum Pathway at Vermont Yankee Nuclear Power Station ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant BVY-99-128, Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl1999-10-0606 October 1999 Submits Listed Addl Info in Support of 990414 Request for Clarification to SER Confirming Adequacy of Space Cooling for HPCI & RCIC Sys,Re Item II.K.3.24 of NUREG-0737.Copy of NEDE-24955,encl ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20216J3531999-09-29029 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-271/99-12 on 990628-0811.Corrective Actions:Based on RFO 20 Maint Rule Outage Performance Review,Task Was Generated to Clarify & Enhance SD Monitoring Process BVY-99-122, Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-171999-09-28028 September 1999 Notifies of Intention to Reinstate Original Version of App F in FSAR & Correct Docket Re Assumption That Electrical Power Sys Are Designed IAW Requirements of GDC-17 BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 11999-09-21021 September 1999 Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 BVY-99-113, Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing1999-09-21021 September 1999 Requests Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maint of Nuclear Power Plants. Attachment 1 Provides Justification for Alternative Testing BVY-99-116, Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested1999-09-21021 September 1999 Informs of Determination That Wh Schulze,License SOP-10528-1,will No Longer Maintain License at Facility. Termination of License Requested BVY-99-121, Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal1999-09-20020 September 1999 Requests Extension Until 990929 to Respond to Violations Noted in Insp Rept 50-271/99-12,dtd 990819.Licensee Did Not Receive Rept Until 990830 & Addl Time Is Needed to Prepare & Allow for Adequate Review of Violation Response Submittal ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System BVY-99-118, Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions1999-09-16016 September 1999 Responds to RAI Concerning GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions BVY-99-115, Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld1999-09-16016 September 1999 Forwards non-proprietary & Proprietary Responses to 990714 RAI Re Civil & Mechanical Engineering Considerations for Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355.Proprietary Encls Withheld ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation BVY-99-110, Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp1999-08-31031 August 1999 Informs of Util Intent to Replace Commitments Made in Licensee & Subsequently Ack in NRC with Containment Insp Criteria Defined in 10CFR50.55a(b)(2)(vi),per Drywell Coating Insp BVY-99-111, Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution1999-08-31031 August 1999 Informs That Encl TS Bases Page 91 Has Been Revised to Allow Reactivity Anomaly BOC Steady State Core Reactivity to Be Normalized Between off-line Uncorrected Solution & on-line 3D-Monicore Exposure Corrected Solution ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core BVY-99-107, Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies1999-08-26026 August 1999 Submits Response to NRC RAI Re Proposed Change to TS to Increase Spent Fuel Storage Capacity from 2,870 to 3,355 Fuel Assemblies ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness BVY-99-108, Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered1999-08-19019 August 1999 Requests That Gv Bogue,Bj Croke,Vs Ferrizzi,Me French, Bk Mcnutt,Jf Meyer & DM Navarro Take BWR Gfes of OL Exam Administered on 991006.DA Daigler & ST Brown Will Have Access to Exams Before Tests Administered BVY-99-103, Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-021999-08-18018 August 1999 Informs That Util Expects to Submit Approx Twenty Licensing Actions in FY00 & FY01,in Response to Administrative Ltr 99-02 BVY-99-100, Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings1999-08-0202 August 1999 Forwards Revised Floor Response Spectra Diagrams,Originally Sent as Attachment 1 to Licensee to Nrc.Revised Diagrams Have More Legible Scale Markings ML20210M5791999-07-30030 July 1999 Responds to NRC 990726 Telcon Re Status of Resolution for USI A-46 Outliers.Written Summary,By Equipment Category, Listed ML20211E1701999-07-28028 July 1999 Forwards Copy of Final Exercise Rept for 990427-29,full- Participation Plume Exposure & Ingestion Pathway Exercise of Offsite Radiological Emergency Response Plans site-specific to VYNPS ML20210G5041999-07-27027 July 1999 Responds to NRC 990301 RAI Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design- Basis Accident Conditions. Licensee Will Submit Info Re Proposed Sys Mod by 990916 ML20210J3031999-07-27027 July 1999 Submits Proposed Changes to Eals.Attachment 1 Provides Listing of Changes to EALs Along with Ref to Bases Documents Supporting Change ML20210G4271999-07-27027 July 1999 Forwards Testing Data & Associated Results for Fitness for Duty Program at Plant for 990101-0630 ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20209J0601999-07-14014 July 1999 Forwards Rev 11 to Vols 1-10 of State of Nh Radiological Emergency Response Plan & Vols 11-50 to Town Radiological Emergency Response Plans,In Support of Vermont Yankee & Seabrook Station.Vols 17-19 of Were Not Included ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20209G1531999-07-12012 July 1999 Discusses Util Setpoint Control Program Implementation Schedule,As Committed to in Licensee 990514 Response to Notice of Violation,Insp Rept 50-271/97-10 ML20196J2321999-06-30030 June 1999 Submits Input from Util Technical Staff Re Soil Disposal on-site Under 10CFR20.2002 & Expresses Interest in Pursuing Approval to Use Same Methodology (Implemented Through Util ODCM & Reported as Noted) If Possible ML20196J7421999-06-29029 June 1999 Informs NRC That Vygs Has Implemented Severe Accident Management,As Committed to in Licensee to NRC ML20209B6111999-06-29029 June 1999 Resubmits Summary of Vynp Commitments Page to Replace Original Page Submitted with Responding to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20196J2431999-06-29029 June 1999 Informs That Author Received Call from NRR on Dirt Spreading Ltr & Questions Re Cover Ltr Statement Where Util Asks to Be Allowed to Dispose of Future Soil in Same Manner Provided Same Acceptance Criteria Met ML20209C3751999-06-28028 June 1999 Forwards non-proprietary Rev 16 to EPIP OP 3524, Emergency Actions to Ensure Initial Accountability & Security Response & Proprietary Rev 12 to EPIP OP 3531, Emergency Call-In Method. Proprietary Encl Withheld ML20209B5861999-06-28028 June 1999 Provides Alternative Y2K Readiness Status Described in Supplement 1 to GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure Rept Encl ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 BVY-99-084, Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.7901999-06-18018 June 1999 Forwards Proprietary Application & Medical Certificate for Mod of Listed SRO License,For Gj Leclair.Gj Leclair Will Be Trained & Evaluated in Accordance with Util Lsro Training Description.Proprietary Info Withheld,Per 10CFR2.790 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195H1741999-06-15015 June 1999 Forwards Original & Copy of Request for Approval of Certain Indirect & Direct Transfer of License & Ownership Interests of Montaup Electric Co (Montaup) with Respect to Nuclear Facilities Described as Listed 1999-09-30
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217N3901999-10-25025 October 1999 Advises That Info Provided in & Affidavit Re Holtec Position Paper WS-115,rev 1,repts HI-87113, Rev 0,HI-87114,rev 0,HI-87102 Rev 0 & HI-87112,rev 0,marked Proprietary,Will Be Withheld from Public Disclosure ML20217L8591999-10-21021 October 1999 Discusses 990921 Request for Approval to Perform Alternative Testing as Part of Vermont Yankee Nuclear Power Station IST Program.Informs That Submittal Reviewed Against ASME Code Section XI Requirements & Forwards Safety Evaluation ML20217M1181999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20217D9711999-10-13013 October 1999 Responds to Request That Information Titled Addl Info Re Cycle Specific SLMCPR for Vermont Yankee Cycle 21 Be Withheld from Public Disclosure.Determined Info to Be Proprietary & Will Be Withheld from Public Disclosure ML20217C1501999-10-0707 October 1999 Forwards Insp Rept 50-271/99-11 on 990809-27.No Violations Noted.Insp Focused on Effectiveness of Engineering Functions in Providing for Safe Operation of Plant ML20212J7891999-10-0404 October 1999 Informs That Licensee 980804,0628,29 & 990921 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Consider Subj GL to Be Closed for Plant ML20212J6501999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of VYNPS on 990913. No New Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues & Insp Plan Through Mar 2000 Encl ML20212C1621999-09-17017 September 1999 Forwards Amend 175 to License DPR-28 & Safety Evaluation. Amend Revises TSs to Enhance Limiting Conditions for Operation & Surveillance Requirements Relating to Standby Liquid Control System ML20216F3171999-09-13013 September 1999 Forwards Insp Rept 50-271/99-06 on 990621-0801.One Violation Identified & Being Treated as Noncited Violation ML20211G4791999-08-27027 August 1999 Forwards Notice of Withdrawal of 990420 Amend Request Re TS on Reloading & Unloading Sequence of Fuel in Reactor Core When All Fuel Removed from Core ML20211E8841999-08-25025 August 1999 Requests That Licensee Provide bldg-specific Justification for Use of Method A.1 at Locations Where Amplification Significantly Exceeds 1.5 Limit Above 8 Hz ML20211E1371999-08-20020 August 1999 Forwards from J Bean to H Miller & FEMA Final Exercise Rept for 990427-29 Plume Exposure & Ingestion Pathway Exercise for Vermont Yankee Nuclear Power Station.No Deficiencies Noted.Areas Requiring C/A Identified ML20211H0851999-08-19019 August 1999 Forwards Insp Rept 50-271/99-12 on 990628-0711 & Nov. Violation Re Failure to Monitor Unavailability of Specific Sys,Structures & Components During Refueling Outage Did Not Allow Adequate Assessment of Maint Effectiveness ML20216D7321999-07-26026 July 1999 Forwards Insp Rept 50-271/99-05 on 990510-0620.Two Viiolations Being Treated as Noncited Violations ML20209G6931999-07-14014 July 1999 Forwards Request for Addl Info Re Spent Fuel Storage Capacity Expansion ML20209G2721999-07-14014 July 1999 Discusses Licensee Response to RAI Re GL 92-01,Rev 1,Suppl Suppl 1, Rv Structural Integrity, for Vermont Yankee Nuclear Power Station ML20196G5241999-06-22022 June 1999 Responds to Re Changes to Vermont Yankee Guard Training & Qualification Plan,Rev 8,Errata A.No NRC Approval Is Required.Encl Will Be Withheld from Public Disclosure Per 10CFR73.21 ML20212J0541999-06-17017 June 1999 Responds to Requesting That NRC Staff ...Allow BWR Plants Identified to Defer Weld Overlay Exams Until March 2001 or Until Completion of NRC Staff Review & Approval of Proposed Generic Rept,Whichever Comes First ML20195J7221999-06-14014 June 1999 Forwards Insp Rept 50-271/99-03 on 990329-0509.Two Severity Level IV Violations Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20195E1441999-06-10010 June 1999 Ack Receipt of Correspondence to NRC Commissioners Re Vermont Yankee Nuclear Power Station.Correspondence Forwarded to Staff for Appropriate Action ML20207G0921999-06-0404 June 1999 Forwards Insp Rept 50-271/99-04 on 990426-28.No Violations Noted.Insp Evaluated Performance of Emergency Response Organization During 990427,Vermont Yankee Nuclear Power Station full-participation Exercise ML20196J3001999-06-0404 June 1999 Informs That NRR Reorganized,Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Was Created. Reorganization Chart Encl ML20207E6001999-05-28028 May 1999 Forwards Operator Licensing Exam Rept 50-271/99-302 on 990510-11.Exam Addressed Areas Important to Public Health & Safety.Exam Developed & Administered Using Guidelines of NUREG-1021,Interim Rev 8.Both Applicants Passed Exam ML20207B8201999-05-25025 May 1999 Informs Licensee of Individual Exam Results for Applicants on Initial & Retake Exams Conducted on 990510-11 at Licensee Facility.Without Encls ML20206K1481999-05-0606 May 1999 Forwards Insp Rept 50-271/99-02 on 990215-0328.Three Severity Level IV Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20206J9951999-05-0505 May 1999 Informs That Util Authorized to Administer Initial Written Exams to Applicants Listed on 990510.Region I Operator Licensing Staff Will Administer Operating Test ML20206G6391999-05-0404 May 1999 Informs That Version of Holtec Intl Rept HI-981932 Marked as Proprietary Submitted by Util Will Be Withheld from Pubic Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20206E8641999-04-29029 April 1999 Forwards SER Concluding That Flaw Evaluation Meets Rules of ASME Code Concerning Util 990329 Request to Extend Reinspection Period for Jet Pump Riser Circumferential Weld Flaws Discovered During 1998 Refueling Outage ML20206A6871999-04-22022 April 1999 Informs of Completion of Review of Re Nepco in Capacity as Minority Shareholder in Vermont Yankee Nuclear Power Corp,Yaec,Myap & Connecticut Yankee Atomic Power Co ML20205P1551999-04-0909 April 1999 Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Insp Program Subject to Rev ML20205K7461999-04-0808 April 1999 Advises That Info Contained in Holtec Intl Affidavit, Will Be Withheld from Public Disclosure,Per 10CFR2.790 ML20205K7531999-04-0707 April 1999 Discusses Alternative Proposal for Reexamination of Circumferential Welds in Plant Rpv.Nrc Has Determined That Alternative Proposal Meets Conditions in BWRVIP-05 Rept. Forwards Safety Evaluation ML20205J0331999-03-31031 March 1999 Informs That on 980423 NRC Oi,Region I Field Ofc,Initiated an Investigation to Determine Whether Williams Power Corp Employee,Working at Vynp,Had Been Threatened & Eventually Fired in April 1998 ML20204J4321999-03-19019 March 1999 Forwards from Ve Quinn to Cl Miller Forwarding IEAL-R/85-11, Vermont Yankee Nuclear Power Station Site- Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification, for Info ML20204D7481999-03-16016 March 1999 Forwards Insp Rept 50-271/99-01 on 990104-0214.No Violations Noted.Security Program Insp Found That Licensee Implementing Security Program That Effectively Protects Against Acts of Radiological Sabotage DD-99-04, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-04) Has Expired.Commission Declined Review.Decision Became Final Action on 990308.With Certificate of Svc.Served on 9903121999-03-11011 March 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-04) Has Expired.Commission Declined Review.Decision Became Final Action on 990308.With Certificate of Svc.Served on 990312 ML20207L5591999-03-0101 March 1999 Requests Addl Info in Response to Questions 6,7 & 11 of RAI Re GL 96-06 Program at Vermont Yankee Nuclear Power Station IR 05000271/19980141999-03-0101 March 1999 Forwards Request for Addl Info Based on Review of Util 961115 & 970313 Responses to GL 96-05 & Insp Rept 50-271/98-14 of GL 96-05 Program at Vermont Yankee Nuclear Power Station ML20207L5471999-02-26026 February 1999 Forwards Request for Addl Info for Ongoing Review of Vermont Yankee IPEEE Submittal Dtd 980630.RAI Related to Fire, Seismic,Internal Flooding & High Wind,Flood & Other External Event Areas ML20203H9791999-02-18018 February 1999 Forwards SER Accepting Licensee 970123 Info Supporting Util Determination That Exam Coverage Achieved During Reactor Pressure Vessel Shell Weld Insp Constitutes Alternative Which Provides Acceptable Level of Quality & Safety ML20203H7631999-02-12012 February 1999 Responds to 981120 Request for NRC Authorization to Perform Alternative Testing to That Specified by ASME BPV Code & Asme/Ansi, Code for Operation & Maint of Npps. Reviewed & Agreed That 990114 SER Needs Revision ML20203H8431999-02-11011 February 1999 Refers to 990201 Request for Withdrawal of 980501 Amend Request.Amend Request Superceded with Another Proposed Change to Ts.Informs That Commission Filed Encl Notice of Withdrawal of Application for Amend to FOL with Ofc of Fr ML20203D1691999-02-0505 February 1999 Acknowledges Inputs,Comments & Requests for Action Re Vermont Yankee Nuclear Power Plant,Provided by Electronic Mail Messages Dtd 990110-13 ML20202G2611999-01-28028 January 1999 Forwards Insp Rept 50-271/98-14 on 981122-990104.No Violations Noted.Nrc Initial Review of Scram Discharge Vol Drain Valve Failures Indicates That Licensee Design Change Process Was Not Effective ML20199K7081999-01-21021 January 1999 Forwards Corrected SE for Amend 163 Issued to FOL DPR-28 on 981228.Determined That Pages 2 & 3 of SE Required Clarification ML20199K6891999-01-20020 January 1999 Informs of Completion of Review of YAEC-1339 Re Allowing Use of FIBWR2 to Validate Reload Analyses Which Include New Fuel Rods & Varied Water Tube Designs.Forwards SE Concluding That Use of YAEC-1339 at Vermont Yankee NPP Acceptable ML20202C9551999-01-20020 January 1999 Informs That Licensee Has Been Authorized to Administer Initial Written Exam to Applicants as Listed on 990122. Operator Licensing Staff Will Administer Operating Test to Applicants ML20199L5901999-01-14014 January 1999 Forwards SER Accepting Util 981120 Request for Approval to Perform Alternative Testing to That Specified by ASME Boiler & Pressure Vessel Code,Section XI & Asme/Ansi OM, Operation & Maintenance of Nuclear Power Plants IR 05000271/19970131998-12-23023 December 1998 Forwards Insp Rept 50-271/97-13 on 981011-1121.No Violations Noted.Radioactive Liquid & Gaseous Effluent Control Programs Were Considered to Be Well Implemented ML20198S1661998-12-17017 December 1998 Final Response to FOIA Request for Documents.Records Encl & Identified in App C & D.App E Records Withheld in Part & App F Records Withheld in Entirety (Ref FOIA Exemption 5) & App G Records Withheld in Entirety (Ref FOIA Exemptions 4 & 5) 1999-09-30
[Table view] |
Text
_ - _ __- . - _ - . ___ _ _ _ _ _ - _ - - . -
[ t.
l NF.' rgmus 464 Part i U.S. NUCLEAR REGULATORY COMMISSION KESPoNsE NuMIER
[u du(
RESPONSE TO FREEDOM OF 8
i I INFORMATION ACT (FOIA) / PRIVACY RESPONSE k~ . . .
- ACT (PA) REQUEST TYPE b- >
i REQUESTER DALE J. Patrick Hickey N I 1198 PART 1. -INFORMATNkLEASED (See checked boxes)
] No additional agency records subject to the requent lieve been located. !
] Requested records are available through anoth6gub'ic distribution program. See Comments section.
' APPENDICES ~
l.
l
{ Agency records subject to the request that are identified in the listed appendices are already available for public inspection and copying at the NRC Public Document Room.
' APPENDICES ~
Agency records subject to the request that are identified in the listed appendices are being made available for J,k puolic inspection and copying at the NRC Public Document Room.
] ' Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public I
Document Room,2120 L Street, NW, Wasisington, DC.
e APPENDICES r fj _ Agency records subject to the request are enclosed.
N y,g Records subject to the request that contain information originated by or of interest to another Federal agency have been referred to that agency (see comments section) for a disclosure determination and direct response to you.
]
Q We are continuing to process your request.
] This completes NRC's action on your request.
.p PART 1.A - FEES AMOUNT '
{] You will be billed by NRC for the amount listed. ] None. Minimum fee threshold not met, f
] You will receive a refund for the amount listed.] Fees waived.
for details PARIl.B -lNFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE
] No agency records subject to the request have been located.
Q- the reasons stated in Part II.Certain information in the requested records is being withheld from disclosure pursuant to Q This determination may be appealed within 30 days by writing to the FOIA/PA Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Clearly state on the envelope and in the letter that it is a "FOIA/PA Appeal."
PART 1.C COMMENTS (Use attached Comments continuation page if required) f b
D \
g $1GNA >
0 D PHIVACY ACI OFHCE.R r*useill A. Powell '
53 99052 g ) oN RECYCLED PAPER This form was designed using informs
y NRC FORM 464 Part il U.S. NUCLEAR REGULATORY COMMISSION DATE RESPONSE TO FREEDOM OF INFORMATION FOIA/PA 97-365 ggy g ACT (FOIA) / PRIVACY ACT (PA) REQUEST PART ll,A - APPLICABLE EXEMPTIONS APPENDigEO ' Records subject to the request that are desenbed in the enclosed Appendices are being withheld in their entirety or in part under
__k__ the Exemption Nc.(s) of the PA and/or the FOIA as indicated below (5 U S C. 552a and/or 5 U S C. 552(b)).
] Exemption 1: The withheld information is properly classified pursuant to Executive Order 12958.
] Exemption 2. The withheld information relates solely to the internal personnel rules and procedures of NRC.
] Exemption 3: The withheld information is specifically exempted from public disclosure by statute indicated.
[ l Sections 141-145 of the Atomic Energy Act, which prohibits the disclosure of Restncted Data er Formerly Restncted Data (42 U S C.
tJ 2161-2165).
] Section 147 of the Atomic Energy Act, which prohibits the disclosure of Unclassified Safeguards Information (42 U S C. 2167).
[7 41 U.S.C ,Section I executive agency 253(b), subsection to any person under (m)(1), section prohibits 552 of Title the disclosure 5, U.S C. (the of contractor proposals FOIA), except wheninincorporated the possession into and control of the contract an between the agency and the submitter of the proposal.
~l Exemption 4: The withheio information is a trade secret or commercial or financialinformation that is being withheld for the reason (s) l indicated.
] The information is considered to be coat dential business (propnetary) information.
F-l The information is considered to be propnetary because it concerns a licensee's or applicant's physical protection or material control and LJ accounting program for special nuclear matenal pursuant to 10 CFR 2.790(d)(1).
] The information was submitted by a foreign source and received in confidence pursuant to 10 CFR 2.790(d)(2).
~l Exemption 5: The withheld information consists of interagency or intraagency records that are not available through discovery during
-J litigation. Applicable privileges:
f1 Deliberstrve process: Disclosure of predecisional information would tend to inhibit the open and frank exchange of ideas essential to the El deliberative process. Where records are withheld in their entirety, the facts are inextncably intertwined with the predeCisional information. There also are no reasonably segregable factual portions because the release of the facts would permit an indirect inquiry into the predecisicnal process of the agency.
] Attomey work-product pnvilege. (Documents prepared by an attomey in contemplation of litigation)
[] Attomey-client pnvilege. (Confidential communications between an attomey and his/her client)
I~l Exemption 6: The withheld information is exempted from public disclosure because its disclosure would result in a clearly LI unwarranted invasion of personal pnvacy.
J Exemption 7: The withheld information consists of records compiled for law enforcement purposes and is being withheld for the reason (s)
WI indicated.
[ ] (A) Disclosure could reasonably focus of enforcement efforts,beand expected thus could to interfere possib!ywith allow anrecipients enforcement proceeding to take (e g., itpotential action to shield would reveal the scope, wrongdoing direction,ofand or a violation NRC requirements from investigators)
Q (C) Disclosure would constitute an unwarranted invasion of personal pnvacy.
[ l (D) The information consists of names of individuals and other information the disclosure of which could reasonably be expected to reveal 1J identities of confidential sources.
!'I-. ' l (E) Disclosure would revea! techniques and procedures for law enforcement investigations or prosecutions, or guidelines that could reasonably be expected to nsk circumvention of the law.
] (F) Disclosure could reasonably be expected to endanger the life or physical safety of an individual
] {OTHER (Specify)
PART ll.B - DENYING OFFICIALS Pursuant to 10 CFR 9.25(g),9.25(h), and/or 9 65(b) of the U S. Nuclear Regulatory Commission regulations, it has been determined that the information withheld is exempt from production or disclosure, and that Its production er disclosure is contrary to the public interest. The person responsible for the denial are those officials identified below as denying officials and the FOINFA Officer for any denials that may be appealed to the Executive Director for Operations (EDO).
P[ IE FFICIAL DENYING ' OFFICIAL TITLE / OFFICE f RECORDS DENIED ; [go g ll;bert J. Miller ; Regional Administrator, RI Appendis K
{x { !
f f f f l ;
[
I l . .
i t l I
~
Appeal must be made in wnting w, thin 30 days of receipt of this response. Appeals should !.a mailed to the FOIA/ Privacy Act C fficer, U S. Nuclear Regulatory Commission, Washington, DC 20555-0001, for action by the appropriate appellate official (s). You should clearly state on the envelope and letter that it is a "FOIA/PA Appeal."
PRINTED ON RECYCLED PAPER Ints form was designed using inf orms NRC FORM 464 Part 11 (3-1998)
.e
'a i FOIA-97-365 APPENDIX J RECORDS BEING RELEASED IN THEIR ENTIRETY NCL DATE DESCRIPTION /(PAGE COUNT)
- 1. 12/28/95 Facsimile Sheet to R Conte, with attachment (4 pages)
- 2. 12/29/95 Facsimile Sheet to R Conte from P Harris, with attachments (15 pages)
- 3. Undated Allegation Information Sheet (1 page)
- 4. Undated Allegation Follow-Up Sheet (1 page)
- 5. 2/9/96 Letter to D Reid from R Cooper with attachment (4 pages)
- 6. 2/9/96 E-Mail from D Chawaga to B Letts,
Subject:
VT Interest in NRC's Handling of H&l Aspect of VY OA-3 Allegation (1 page)
- 7. '3/18/96 To K Smith from J Galvert,
Subject:
Attempts to interview l VY Engineer Connected with inspection (1 page) l 8. - 3/19/96 To K Smith from J Calvert,
Subject:
VY Engineer Availability for inspection Interview (1 page)
- 9. 3/27/96 E-Mail from D Chawaga to D Vito,
Subject:
Contacted Bill Sherman re: VY H&l Allegation (2 pages) l 10. 3/29/96 E-Mail from R Conte to W Cook et al.,
Subject:
ALG 95-0222, VY AOG lssue (1 page)
- 11. Undated Concurrence page with handwritten notes (1 page)
- 12. Undated Letter to Gibson (1 page)
- 13. Undated Distribution of Allegations (1 page)
- 14. Undated Distribution List with attachment (9 pages)
- 15. Undated Vermont Yankee AOG Scenario (2 pages)
' 16. 5/3/96 Ltr to D Reid from R Conte with attachments (34 pages) j
e 3
2
- 17. 5/3/96 Ltr to D Reid from R Conte with attachments (35 pages)
- 18. 5/21/96 Allegation Disposition Record (2 pages)
- 19. 5/21/96 Allegation Receipt Report (6 pages)
- 20. 8/8/96 Ltr to D Reid from R Conte with attachment (31 pages)
- 21. Undated Allegation Disposition Record (1 page)
- 22. Undated Copy of package sent to H Eichenholz with handwritten notes (42 pages)
- 23. 2/26/97 Handwritten letter to D Vito from J Massey (10 pages)
- 24. 5/16/97 E-Mail from H Eichenholz to D Vito,
Subject:
Alleg 96-128/97-0066 (1 page)
- 25. 5/19/97 E-Mail from D Vito to H Eichenholz,
Subject:
Alleg 96-128/987-0066 (1 page) l l
e I
i FOlA-97-365 APPENDIX K RECORDS BEING WITHHELD IN PART DATE DESCRIPTIONRPAGE COUNTl/ EXEMPTIONS l RCL
- 1. Undated Draft ltr to E Massey from D Vito (6 pages) EX. 7C !
- 2. 3/12/97 Allegation Receipt Report (1 page) EX. 7C i
)
l l
l 1
I l
i i
b l
l l
SHAW, PITTMAN, PoTTs & TROWBRIDGE A PARTNEnsNip GNCLUD4NG PmOrtsssONAL CompomateONS 2300 N STREET. N. W.
WASHINGTON. D. c. 20037 (202)663 8000 h% hQ* ' .
gAgNg,, Date Rec'd: . 7 - # & 9 '7 AcBonOli: l'o e /
RelatedOxx .
J. PATRICK H KEY. P.C.
S temW 19,1997 Mr. Russell A. Powell, Chief Freedom of Information Act/1.ocal Public Document Room Branch U.S. Nuclear Regulatory Commission Mail Stop T-6 D8 Washington, D.C. 20555-0001 Re: Freedom of Information Act (FOlA) Request
Dear Mr. Powell,
Pursuant to 5 U.S.C. @ 552 (a)(3) and 10 C.F.R. $ 9.23, I am requesting all documents relating to the investigation by the NRC Region i Office of Investigations of Case No.1-96-005 (allegations related to Vermont Yankee).
I agree in advance to pay any reasonable fees associated with this request.
Thank you for your prompt attention to this request. I look forward to your response within ten (10) days, as required by NRC and FOIA regulations.