Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Eighteenth Inservice Inspection Summary Report". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • NL-07-1962, Eighteenth Maintenance/Refueling Outage Steam Generator Tube Inspection Report  + (Eighteenth Maintenance/Refueling Outage Steam Generator Tube Inspection Report)
  • ML20127G685  + (Eighteenth Monthly Progress Rept for May 1985 Under Fin B-7389)
  • ML20070W154  + (Eighteenth Motion for Summary Disposition of Contentions Necnp II.B.1,3,4 & 5.No Genuine Issue of Matl Fact Exists & Applicant Entitled to Favorable Decision.Related Correspondence)
  • ML20058C351  + (Eighteenth Progress Rept of Tx A&M Univ Nuclear Science Ctr,1981)
  • ML20090A331  + (Eighteenth Quarterly Rept,Cleveland Electric Illuminating Seismic Monitoring Network,Apr-Sept 1991)
  • ML080250060  + (Eighteenth Refueling Outage Inservice Inspection Report)
  • L-16-019, Eighteenth Refueling Outage Inservice Inspection Summary Report  + (Eighteenth Refueling Outage Inservice Inspection Summary Report)
  • ML20087G453  + (Eighteenth Set of Interrogatories & Requests to Produce to Applicants Re Issue of Intimidation,Harassment & Threatening of QC Inspectors & Other Employees.Certificate of Svc Encl. Related Correspondence)
  • ML20054B785  + (Eighteenth Set of Interrogatories & Request to Produce)
  • ND-22-0628, Eighteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049)  + (Eighteenth Six-Month Status Report of the Implementation of the Requirements of the Commission Order with Regard to Mitigation Strategies for Beyond-Design-Basis External Events (EA-12-049))
  • ML20126F116  + (Eighth Annual Occupational Radiation Exposure Report 1975)
  • SBK-L-18075, Eighth Annual Update to License Renewal Application  + (Eighth Annual Update to License Renewal Application)
  • ML20070H309  + (Eighth Discovery Progress Rept.Certificate of Svc Encl. Related Correspondence)
  • ML20207D568  + (Eighth Draft Suppl Rept, Comanche Peak Steam Electric Station:Alleged Climate of Intimidation)
  • ML20154Q296  + (Eighth Final Response to FOIA Request for Documents. Documents Listed in App L Being Withheld in Part & Documents Listed in App M Being Withheld in Their Entirety (Ref FOIA Exemption 5))
  • ML040280424  + (Eighth Interim Application of FTI Consulting Inc. for Allowance and Payment of Compensation and Reimbursement of Expenses (August 1, 2003 Through November .30, 2003); Declaration of Thomas E. Lumsden in Support Thereof)
  • ML20112A534  + (Eighth Interim Deficiency & Part 21 Rept,Item 41 Re Failure of Westinghouse Reactor Protection Sys Following Secondary High Energy Line Break.Initially Reported on 800707.Design Changes Issued.Next Rept by 850430)
  • ML20082E223  + (Eighth Interim Deficiency Rept Re Attached Piping.Initially Reported on 801121.B&W Refining Stress Analysis to Eliminate Excessive Conservatism.Evaluation Will Be Completed by 831118.Also Reportable Per Part 21)
  • ML20071M386  + (Eighth Interim Deficiency Rept Re B&W Nonconservative Analysis of Neutron Flux.Initially Reported on 801105.Also Reportable Per Part 21.Util Awaiting Results of B&W Analysis.Next Rept Will Be Submitted by 831024)
  • ML20028B632  + (Eighth Interim Deficiency Rept Re Breakdown in Quality program-procurement Cycle of Purchased Matls.Initially Reported on 800613.Bechtel Assessment Continuing.Next Rept Will Be Submitted by 830603)
  • ML20066K440  + (Eighth Interim Deficiency Rept Re Failure of Main Steam Lines Due to Main Feedwater Overfill.Initially Reported on 800319.Steam Lines Can Withstand Overfill Event.Next Rept Will Be Submitted by 830328.Also Reportable Per Part 21)
  • ML20077A104  + (Eighth Interim Deficiency Rept Re Failure of Chattanooga Bolt & Screw Nuts & Challenge Enterprises Bolts to Meet ASTM Specs.Initially Reported on 810924.Results of Bolting Matl Analysis Under Review.Also Reportable Per Part 21)
  • ML20070S217  + (Eighth Interim Deficiency Rept Re High Energy Line Break Analysis Pipe Whip Restraint Designs.Initially Reported on 800919.Analysis Complete on 92% of Restraints.Design Drawings Under Rev.Next Rept Due by 830506)
  • ML20028D156  + (Eighth Interim Deficiency Rept Re Inadequacy of Original Criteria for Use of Carbon Steel Piping in Raw Water Sys. Initially Reported on 801230.Criteria in Design Guide DG-M3.5.1 Changed.Next Rept by 831028)
  • ML20069C529  + (Eighth Interim Deficiency Rept Re Itt Grinnel Welded Supports W/Discrepancies in Weld Designation.Initially Reported on 800905.Util & Manufacturer Revising All Hanger Detail Sheets.Also Reported Per Part 21.Next Rept by 831208)