Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "EA-19-077". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML18213A181  + (EA-18-073 - Kakivik Asset Management, LLC - NRC Inspection Report 03035371/2018001 and Notice of Violation)
  • ML18205A147  + (EA-18-077_Eglin Air Force Base; Exercise of Enforcement Discretion; Department of the Air Force)
  • IR 015000017/2018003  + (EA-18-078 Bayou Inspection Services, Inc.; Notice of Violation; NRC Inspection Report 15000017/2018-003)
  • ML18198A420  + (EA-18-087; Nqs Inspection, Ltd. - Notice of Violation and NRC Inspection Report 15000042/2018001)
  • ML18205A546  + (EA-18-093; Nondestructive and Visual Inspection, LL; NRC Inspection Report 03038376/2018001 and Closure of Unresolved Item from NRC Inspection 03038376/2017001)
  • ML18206A359  + (EA-18-094; National Inspection Services, LLC; NRC Inspection Report 03039062/2018001)
  • IR 05000035/2018001  + (EA-18-102 - Midwest Engineering and Testing Corporation, NRC Inspection Report 150-00035/2018-001 and Notice of Violation)
  • ML18278A229  + (EA-18-102 - Midwest Engineering and Testing Corporation, NRC Inspection Report 150-00035/2018-001 and Notice of Violation)
  • IR 015000042/2018001  + (EA-18-103 - Alliance Engineering Group, Inc.; NRC Inspection Report 15000042/2018001 and Notice of Violation)
  • ML19023A556  + (EA-18-104)
  • IR 05000461/2018092  + (EA-18-104 Clinton Power Station - Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; NRC Inspection Report No. 05000461/2018092)
  • ML18260A187  + (EA-18-106 - Terracon Consultants, Inc., NRC Inspection Report 03032176/2018-002)
  • IR 05000277/2018013  + (EA-18-107, Peach Bottom Atomic Power Station-Final Significance Determination for a White Finding W/Assessment follow-up and Notice of Violation-Inspection Report 05000277/2018013 and 05000278/2018013)
  • OI 2-2017-024, EA-18-119, Framatome - Notice of Violation (Office of Investigations Report No. 2-2017-024)  + (EA-18-119, Framatome - Notice of Violation (Office of Investigations Report No. 2-2017-024))
  • EPID:L-2018-LRO-0032  + (EA-18-137)
  • ML18332A357  + (EA-18-155, Southern California Edison Company; San Onofre Nuclear Generating Station - NRC Special Inspection Report 050-00206/2018-005, 050-00361/2018-005, 050-00362/2018-005, 072-00041/2018-001 and Notice of Violation)
  • IR 05000206/2018006  + (EA-18-155; Southern California Edison Company; San Onofre Nuclear Generating Station; NRC Supplemental Inspection Report 050-00206/2018-006, 050-00361/2018-006, 050-00362/2018-006, 072-00041/2018-002)
  • ML18337A411  + (EA-18-163 - Letter to Michael Fuller - Notice of Violation QSA Global, Inc. Related to Failure to Properly Notify the Us NRC in Advance of Import Shipment)
  • ML18301A002  + (EA-18-163 - QSA Email Regarding Root Cause and Corrective Actions Taken for October 9, 2018 Shipping Violation)
  • ML18301A000  + (EA-18-163 QSA October 9, 2018 Violation - Failed to Submit Import Advanced Shipping Notification)
  • ML19156A416  + (EA-19-020; Jan X-Ray Services, Inc. - Notice of Violation; NRC Routine Inspection Report No. 03011772/2019001(DNMS))
  • ML19234A148  + (EA-19-040 - Letter to J. Peters of Manufacturing Sciences Corporation Export of Nuclear Material Under NRCs Licensing Authority - Notice of Violation)
  • ML25028A195  + (EA-19-046: Thomas Summers - Return to Nuclear Related Work - 01/28/25)
  • IR 05000498/2020091  + (EA-19-054, South Texas Project Electric Generating Station, Units 1 and 2, Notice of Violation, NRC Inspection Report 05000498/2020091; 05000499/2020091 and NRC Investigation Report 4-2017-034)
  • EPID:L-2018-LLM-0002  + (EA-19-070)
  • ML19260G181  + (EA-19-111 Industrial Nuclear Co. Email and Corrective Actions Taken)
  • ML19259A259  + (EA-19-111 Industrial Nuclear Co. Violation - Import from Mexico)
  • ML19274D163  + (EA-19-111 Notice of Violation - Industrial Nuclear Company, Inc. Failure to Properly Notify U.S. Nuclear Regulatory Commission in Advance of Import Shipment)
  • ML19277F620  + (EA-19-111 Notice of Violation - Industrial Nuclear Company, Inc. Email Exchanges)
  • ML20062B657  + (EA-19-114 Limerick Generating Station Units 1 and 2 - NRC Investigation Report No. 1-2019-011 and Notice of Violation (Cover Letter Only))
  • ML19287A018  + (EA-19-121 Industrial Nuclear Co. Violation - Import from Russia)
  • ML19287A019  + (EA-19-121 Industrial Nuclear Co. Violation - Import from Russia)
  • ML19308B404  + (EA-19-121 Notice of Violation - Industrial Nuclear Company, Inc - Failure to Properly Notify the U.S. Nuclear Regulatory Commission in Advance of Import Shipments - Non-Cited Violation)
  • EPID:L-2018-LLA-0217  + (EA-19-125)
  • ML20069E378  + (EA-19-128; National Aeronautics and Space Administration; Notice of Violation and Exercise of Enforcement Discretion, NRC Inspection Report 999-90004/2019-001)
  • ML20100J319  + (EA-19-129, Waterford Steam Electric Station, Unit 3 - Notice of Violation; NRC Inspection Report 05000382/2019412)
  • ML20063L664  + (EA-19-141 - Enforcement Action Worksheet)
  • ML20045E397  + (EA-19-141 Letter to John Sanders - Export of Nuclear Material Under Us NRCs Licensing Authority - Notice of Violation)
  • ML21056A024  + (EA-20-004 Clinton Final Action with NOV (Public))
  • IR 05000461/2020404  + (EA-20-004 Clinton Power Station - Final Significance Determination for a Security-Related Preliminary Greater than Green Finding with Assessment Follow-Up; NRC Security Inspection Report 05000461/2020404)
  • EPID:L-2019-LLA-0135  + (EA-20-045)
  • IR 015000017/2020002  + (EA-20-046, Bayou Inspection Services, Notice of Violation, NRC Inspection Report 150-00017/2020-002)
  • ML20139A208  + (EA-20-046; Bayou Inspection Services, Inc.; Bayou Inspection Services, Inc. - NRC Inspection Report 15000017/2020002)
  • IR 015000004/2020002  + (EA-20-047; Christian Wheeler Engineering; Christian Wheeler Engineering - NRC Inspection Report 150-00004/2020-002)
  • ML20211L896  + (EA-20-054, Agreement to Mediate NRC)
  • ML20211L897  + (EA-20-054, Agreement to Mediate Palo Verde)
  • ML20171A636  + (EA-20-064 Acknowledgement Letter to IMS Systems, Inc)
  • ML20169A360  + (EA-20-064 IMS Systems, Inc. Reply to Notice of Violation)
  • ML20129J868  + (EA-20-064 Notice of Violation - IMS Systems, Inc. Failure to Properly Notify the U.S. Nuclear Regulatory Commission in Advance of Import Shipments)
  • ML20275A048  + (EA-20-068 Davis Besse Licensee Closure Letter)