Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20245E884 + (Discusses L Joseth 890417 Telcon on 890301 Memo Re Lightning Rods Containing Source Matl.Contact W/Named Attorneys Suggested for Voicing & Discussion of Objections Concerning Subj Matl)
- ML19221A600 + (Discusses L Kovachs Recommendations Re Carbon Adsorbers in Auxiliary Bldg.Trays Should Be Removed from Sys and Cleaned of Carbon)
- ML20043B559 + (Discusses L Ruby Ltr to NRC Requesting Investigation of Facility,Per Employee Dismissal on 900416.Affirms Confidence in M Pollock,Serving as Acting Director)
- ML20236H509 + (Discusses L Trosten Ltr to C Smiley Re Epa/Commonwealth of Ky Contract.Any Formal Response from AEC Acceptable.Related Info Encl Re Nuclear Engineering Co Task Group Investigation)
- RBG-41486, Discusses LAR 94-04,extending Action Times of Leakage Control Sys + (Discusses LAR 94-04,extending Action Times of Leakage Control Sys)
- ML20091B257 + (Discusses LBB Analysis of Plant Unit 1 Pressurizer Surge Line Piping Which Allows Shims to Be Removed from Surge Line Pipe Whip Restraints.Lbb Analysis Was Approved,Therefore Surge Line Whip Restraint Shims Will Be Removed)
- ML18066A790 + (Discusses LBLOCA Evaluation Model & Problems Identified Concerning Changes in Model Used by SPC for Pressurized Water Reactors.In Accordance w/10CFR50.46(a)(3)(ii) Impact of Model Errors & Changes Should Be Assessed)
- ML18085A193 + (Discusses LBP-80-27 in Spent Fuel Pool Mod Proceeding, Authorizing Ofc of Nuclear Reactor Regulation to Make Appropriate Findings & Issue Requested Amend.Decision Should Not Be Appealed)
- ML20238F788 + (Discusses LER 369/85-29 Re Nonconservative Analysis Error in Containment Pressure & Util Commitment to Reevaluate Emergency Procedure for Transfer to Cold Leg Recirculation. Commitment Rescinded for Stated Reasons)
- ML19209C917 + (Discusses LER 78-013 Re Failure of Feedwater Flow Straightener at Plant.Consideration Should Be Given to Possible Consequences of Internal Appurtenance Dislodged by Blowdown Flow & Possible Steam Generator Damage)
- ML19273C117 + (Discusses LER 79-012/01T-0 Re Steam Generator Tube Deterioration from Caustic Corrision in Tubesheet Crevice. Matter Is of Low Safety Importance.Investigation Continues Re Deep Crevice Corrosion Phenomena)
- 05000278/LER-1979-017, Discusses LER 79-017/03L-0.While Reactor Subcritical & Less than 212 F,Main Steam Line D Radiation Monitor Hi-Hi Trip Failed.Caused by Dirty Trip Relay or Dirty Test Switch Contacts.Repeated Testing Corrected Condition + (Discusses LER 79-017/03L-0.While Reactor Subcritical & Less than 212 F,Main Steam Line D Radiation Monitor Hi-Hi Trip Failed.Caused by Dirty Trip Relay or Dirty Test Switch Contacts.Repeated Testing Corrected Condition)
- 05000334/LER-1979-028, Discusses LER 79-028/01P-0 on 790820:reactor Was Manually Tripped Following Trip of Main Feed Pump 1B Due to Low Net Positive Suction Head.Manual Trip Caused 1A & 1B 4kV Buses to Trip on All Reactor Coolant Pumps on Underfreque + (Discusses LER 79-028/01P-0 on 790820:reactor Was Manually Tripped Following Trip of Main Feed Pump 1B Due to Low Net Positive Suction Head.Manual Trip Caused 1A & 1B 4kV Buses to Trip on All Reactor Coolant Pumps on Underfrequency)
- 05000334/LER-1980-073, Discusses LER 80-073/01P on 801003.Potential Exists for Blowing More than One Steam Generator in Event of Single Line Break in RHR Valve or in Steam Supply to turbine-driven Auxiliary Feedwater Pump.Engineering Study Is in Prog + (Discusses LER 80-073/01P on 801003.Potential Exists for Blowing More than One Steam Generator in Event of Single Line Break in RHR Valve or in Steam Supply to turbine-driven Auxiliary Feedwater Pump.Engineering Study Is in Progress)
- ML20064L009 + (Discusses LER 81-66 Re Facility Diesel Generator Jacket Water Temp Control Valve & Manual Bypass Valve.No Further Action Recommended)
- ML20135B105 + (Discusses LER 84-021 Re Silt Accumulation on Svc Water Strainers on 841011 & 30.Util Solution to Change Strainer Mesh from 10 Mils to 20 Mils Acceptable.Issue Closed)
- 05000369/LER-1984-022, Discusses LER 84-22 Describing Design Deficiency in Area of Seismic Qualification of Certain Fire Protection & Drain Piping Serving Control Room.Design Mod to Rectify Situation Will Be Completed by 851101 + (Discusses LER 84-22 Describing Design Deficiency in Area of Seismic Qualification of Certain Fire Protection & Drain Piping Serving Control Room.Design Mod to Rectify Situation Will Be Completed by 851101)
- ML20136H583 + (Discusses LER 85-018 Re Emergency Svc Water Pipe Coating Failure.Immediate Corrective Action for Delamination Problem Acceptable for near-term.Long-term Corrective Actions for Unprotected Piping Requested)
- ML20205A654 + (Discusses LER 86-040-00 & Supplemental LER 86-040-01 & Forwards Notice of Violation.Since LERs Provide Description, Cause,Analysis of Event & Corrective Actions,Per 10CFR50.49, No Civil Penalty Will Be Proposed)
- ML18065A064 + (Discusses LER 95-009 & Contains Two New Commitments & No Revs to Existing Commitments)
- ML20134M081 + (Discusses LER 96-017 Re Failure of Multiple SRVs to Open within Required TS Allowable Tolerance.Commitments Re LER Provided)
- ML19347E088 + (Discusses LER Re 800902 Failure of Safety Injection Sys Sequencer to Load Diesels on Loss of Offsite Power.Design Deficiencies Represent Common Mode Failure Since Both Trains of Sys Are Affected Simultaneously)
- ML20126A774 + (Discusses LER Review Re Problem of Residual Heat Removal. Recommends That Steps Be Taken to Outline Dedicated Heat Removal Sys for Lwrs.Supporting Papers Encl)
- ML19241C098 + (Discusses LER Trends.Study of High Failure Rates Shown by LERs Is Under Way.Methods Exist for Automatic Detection & Alarming of Incorrect Valve Positions.Requirements for Safety Sys Status Monitoring Sys Is Being Reconsidered)
- 05000320/LER-1980-035, Discusses LER-80-035/03L-0 Re Failure of Fire Detectors for White Balance of Plant Diesel Generators.Plans to Submit Tech Spec Change Request as Part of Pkg of Multiple Changes + (Discusses LER-80-035/03L-0 Re Failure of Fire Detectors for White Balance of Plant Diesel Generators.Plans to Submit Tech Spec Change Request as Part of Pkg of Multiple Changes)
- ML19325D152 + (Discusses LEU Conversion Timetable)
- ML20198F909 + (Discusses LL Bush Retirement from Nrc,After 42 Years in Govt Svc & Expresses Good Luck & Good Health in Retirement)
- ML20149F736 + (Discusses LLRW Licensing Actions & to Supplement Info Sent in Ltr from Chairman Selin of 940714 Re Possible Use of Plant Site to Store LLRW)
- ML20137M218 + (Discusses LLW Most Recent Forum Held in July 1993 Re Development of Uniform Manifest Rulemaking,Project That Forum Advocated & Actively Promoted Since Forum Inception in 1986)
- ML19282C789 + (Discusses LOCA Evaluation Model.Leibnitz Rule Approximation Justification Is Appropriate & Effect of High Heat Transfer on Calculated Peak Clad Temp Will Result in Reduction by Several Hundred Degrees)
- ML20085B104 + (Discusses LOCA-type Accidents)
- ML19305B254 + (Discusses LWR Fuel Pellet Fission Gas Release Rate.No Immediate Licensing Action Required)
- ML19350B389 + (Discusses LWR Primary Coolant Sys Pressure Isolation Valves. Event 5 Interfacing Sys LOCA Caused by in-series Check Valve Failure.Loca Unlikely w/motor-operated Valve in Closed Position.Requests Relief from Certain Monthly Testing)
- ML20128F812 + (Discusses La Energy Services Elimination of Hold Up Basin from Jan 1993 Update to Claiborne Enrichment Ctr (CEC) Er as Sampling Site for CEC Effluent Monitoring Program,W/ Respect to Outfall 002.Marked-up Pages from Er Encl)
- ML20211N297 + (Discusses LaSalle County Restart Meeting Held on 971001.Addl Info Provided Re Comed Organization Change That Realigned Quality Oversight Functions within Comed Nuclear Operations Div)
- ML20197B634 + (Discusses Lab Analysis of Pulled Tubes from TMI-1 once-through Steam Generator to Be Conducted During Next Refueling Outage.Historical Data & Evaluation of Nine Candidate Tubes Encl)
- ML20140G326 + (Discusses Labeling of in Vitro Diagnostic Test Kits Per 10CFR32.71(c))
- ML20127M085 + (Discusses Lack of Date for Goal in 920612 Memo for Panel to Render Recommendation on Differing Professional Opinion of Author on Regulatory & TS Requirements for Electrical Power Sources)
- ML20246L398 + (Discusses Lack of Generic Emergency Operating Procedure Guidelines.Nrc Suggests Scheduling of Meeting in Near Future to Resolve Concerns Re Continued Reliance Upon Abnormal Transient Operating Guideline Part II as Licensing Basis)
- ML19345D414 + (Discusses Lack of NRC Action Re Comments Submitted in Concerning Consolidation of Reporting Requirements. Clarification & Consolidation of All Licensee Reporting Requirements Urged)
- ML20210A987 + (Discusses Lack of Notice of Scheduled Meetings W/Nrc & Util Re Licensing Proceeding.Listed Arrangements for Providing Adequate Notice for Future Meetings Requested.Related Documentation Encl.Served on 870205)
- ML19294B445 + (Discusses Lack of Notification of 800109 Meeting W/Sensible Me Power in Boothbay Harbor,Me in Response to . Meeting Was to Be Small Informal Gathering & No Press Coverage or Interest Was Anticipated)
- ML20024C471 + (Discusses Lack of Prompt Notification to TMI Re Substantial Safety Hazard.Proper Customer Notification Will Be Provided by Licensing)
- ML19209D083 + (Discusses Lack of Regulatory or Industry Guidance on safety-related Process Instrumentation Tubing Mounting & Code Applicability.Submits Util Approach to Ensure Integrity of Instrumentation Tubing)
- ML20213C992 + (Discusses Lack of Response from Licensee Re Q1 Questions & Need to Revise Review Schedule)
- ML20213C990 + (Discusses Lack of Util Response to FSAR Q1 Questions. Recommends Delay in Second Round Questions.Forwards Addl First Round Inquiry)
- ML20127K495 + (Discusses Lake County 250-acre Baler Landfill Described in Appearance Before Aslb.W/Compressed Refuse Stacked 20-40 Ft High & Prevailing Winds from West,Site Will Be Problem. Precedent Event Caused by Horizontal Transport of Gas Cited)
- ML20202J182 + (Discusses Lakeview Rock Graduation Testing & Results & Monitoring Plans.Addl Saturated Hydraulic Conductivity Testing of Cell Cover Planned for Spring of 1998 to Gain Greater Spatial Coverage.Conference Call Requested)
- ML20210L859 + (Discusses Land Annotation for Vitro Processing Site & Submits Corrections to Proposed Annotation Document Given in Telcon to Arp)
- ML19326E239 + (Discusses Landslide Stability Investigation.Field Exploration Phase Complete.Summary Rept Encl to Verify That Field Work Performed Will Provide Satisfactory Samples to Determine Adjacent Hill Stability Under Present Conditions)
- ML20154E470 + (Discusses Language Appearing on Statement of Managers Accompanying Hj Res 395 Re Continuing Resolution for FY88)