Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML030650384 + (Detailed Comments to Design Basis Threat)
- ML20117D341 + (Detailed Control Room Design Review Final Summary Rept)
- ML20114D445 + (Detailed Control Room Design Review Findings)
- ML20115H153 + (Detailed Control Room Design Review In-Progress Audit Rept for Peach Bottom Atomic Power Station,Units 2 & 3)
- ML20085N630 + (Detailed Control Room Design Review Program Plan for Peach Bottom Atomic Power Station, in Connection W/Suppl 1 to NUREG-0737, Requirements for Emergency Response Capability (Generic Ltr 82-33) & Generic Ltr 83-18)
- ML20092N844 + (Detailed Control Room Design Review Program Plan for Vermont Yankee Nuclear Power Plant)
- ML20090H304 + (Detailed Control Room Design Review Program Plan for Ja Fitzpatrick Nuclear Power Plant)
- ML20078P165 + (Detailed Control Room Design Review Program Plan for Crystal River Unit 3 Generating Station)
- ML20077M381 + (Detailed Control Room Design Review Program Plan for Limerick & Peach Bottom Plants)
- ML20082G104 + (Detailed Control Room Design Review Program Plan)
- ML20098G329 + (Detailed Control Room Design Review Program Plan)
- ML20107H570 + (Detailed Control Room Design Review Program Plan)
- AECM-84-0537, Detailed Control Room Design Review Program Plan + (Detailed Control Room Design Review Program Plan)
- ML17254B011 + (Detailed Control Room Design Review Program Plan)
- ML20077H991 + (Detailed Control Room Design Review Program Plan Rept)
- ML20077E072 + (Detailed Control Room Design Review Program Plan for Shoreham Station)
- ML20072K404 + (Detailed Control Room Design Review Program Plan for Snupps)
- ML20086L021 + (Detailed Control Room Design Review Summary Rept for Snupps, in Response to Generic Ltr 82-33,NUREG-0737, Suppl 1)
- ML20107D523 + (Detailed Control Room Design Review Summary Rept)
- ML20114D425 + (Detailed Control Room Design Review Summary Rept)
- ML20102C213 + (Detailed Control Room Design Review Supplementary Summary Rept)
- ML20092P239 + (Detailed Control Room Design Review for Davis-Besse Nuclear Power Plant, Summary Rept.Rept Prepared in Response to NUREG-0737,Item 1.D.1.Review Conducted Using Suppl 1 to NUREG-0737)
- ML17214A484 + (Detailed Control Room Design Review of Plant,St Lucie Unit 2 Nuclear Power Station, Summary Rept)
- ML17214A549 + (Detailed Control Room Design Review, Summary Rept)
- ML20099H376 + (Detailed Control Room Design Review,Methodology & Approach, Human Engineering Discrepancy Results, Summary Rept)
- ML17301A039 + (Detailed Control Room Design Reviews Program Plan)
- ML052230398 + (Detailed Description of an Occurrence from July 27, 2005)
- ML19274D913 + (Detailed Explanation of Disagreement with Insp Rept 50-333/78-17 Stating That Items A,E & F Should Not Be Included in Notice of Violation App a)
- ML18230A933 + (Detailed Geologic Plan, West Dike 3S at Fault, Plate 16, Sht. 1 of 2)
- ML18230A934 + (Detailed Geologic Plan, West Dike 3S at Fault, Plate 16, Sht. 2 of 2)
- ML19261B983 + (Detailed Info Re Containers of High Enriched U for Export to Romania Which Were Found Upon Insp at Kennedy Airport,Ny,To Have Broken Wire Seals)
- ML20309A526 + (Detailed Meeting Discussion Summary of the Public Meeting NRC-conducted FOF Inspection Activities in 2021 During the Covid-19 Public Health)
- ML25168A016 + (Detailed NEI 24-05 Questions and Observations for June Public Meeting)
- ML19330C642 + (Detailed Procedure for Test Program to Evaluate Welds of Anchor Rods & Studs to Embedded Plates)
- ML19339C043 + (Detailed Procedures for, Test Program to Evaluation Welds of Anchor Rods & Studs to Embedded Plates, Revision 2)
- ML121160333 + (Detailed Questions for Seabrook ASR Public Meeting on April 23, 2012)
- ML20083C781 + (Detailed Rept on Evacuation of 821211)
- ML13311B053 + (Detailed Responses to Marine Review Committee Rept)
- ML20211F690 + (Detailed Review of Selected Aspects of Total Sys Performance Assessment - 1995)
- ML040580613 + (Detailed SID Log Entry - Ft. Calhoun)
- ML19323A177 + (Detailed Schedule & Outline for Discussion Re 239th ACRS Meeting on 800306-08 in Washington,Dc)
- ML20259A777 + (Detailed Schematic Diagram Auctioneered Average Power. Subassembly B)
- ML20259B229 + (Detailed Schematic Diagrams (10of 50). Subassembly a)
- ML20259A967 + (Detailed Schematic Diagrams (11 of 50),Power Range Channel (1 of 2), Subassembly B)
- ML20259B391 + (Detailed Schematic Diagrams (32 of 50). Subassembly C)
- ML20259B746 + (Detailed Schematic Diagrams (8 of 50):Bistable Trip String (2 of 2). Subassembly a)
- ML20259A848 + (Detailed Schematic Diagrams Reactor Coolant Pump Monitor/Reactor Coolant Flow. Subassembly a)
- ML20259A865 + (Detailed Schematic Diagrams Reactor Coolant Pump Monitor/Reactor Coolant Flow. Subassembly B)
- ML20259A727 + (Detailed Schematic,Selection Panel Outputs. Subassembly a)
- ML18059B019 + (Detailed Site Study,Berrien County,Mi, Final Rept)
- ML20053C897 + (Detailed Soil Decontamination Plan)