Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Decision Affirming 721214 Initial Decision Authorizing Issuance of CP". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20024F290  + (Decision ALAB-739,affirming ASLB 830204 Initial Decision LBP-83-4,authorizing Issuance of OL Amend to Allow Repair of Degraded Steam Generator Tubes by Sleeving.Wisconsin Environ Decade Failed to Link Sleeving to Tube Failures)
  • ML20126L018  + (Decision ALAB-809 Vacating ASLB 850509 & 24 Orders Granting Util Exemption from Certain Requirements of 10CFR50-47 & Remanding Further Action in Accordance W/ Opinion.Served on 850618)
  • ML20127L604  + (Decision ALAB-811 Finding That Unit 2 Verification Program Sufficient to Establish That Licensing Criteria Met.License Authorization Granted by ASLB Initial Decision Remains Effective.Served on 850627)
  • ML20209F192  + (Decision ALAB-812 Denying Joint Intervenors 841108 Motion to Reopen Record on Const QA & Mgt Character & Competence, Except Insofar as Issues Re Matters Under Investigation by Ofc of Investigation Are Raised.Served on 850711)
  • ML20129C235  + (Decision ALAB-813 Affirming Aslab Authorization of Issuance of Full Power Ol,Except Insofar as Receipt & Storage Onsite of Spent Fuel Generated at Other Facilities.Served on 850729)
  • ML20134P937  + (Decision ALAB-816,affirming Denial of Jf Doherty Request for Hearing & Petition for Leave to Intervene.Served on 850905)
  • ML20133J693  + (Decision ALAB-818 Affirming ASLB Conclusions in LBP-85-12 Re Util Legal Authority to Implement Features of Emergency Plan.Served on 851018)
  • ML20138D372  + (Decision ALAB-819 Affirming ASLB Second Partial Initial Decision LBP-84-31,except Insofar as ASLB Decision Approves Util Onsite Emergency Plan Medical Arrangements.Issue Reversed & Remanded.Served on 851023)
  • ML20136H787  + (Decision ALAB-824,affirming Alab 850614 Partial Initial Decision That Tdi Emergency Diesel Generators Installed at Facility Satisfy GDC 17 Requirements for First Fuel Cycle. Served on 851121)
  • ML20136H723  + (Decision ALAB-825,affirming Remaining Part of ASLB OL Authorization,Permitting Applicant to Receive & Store Spent Fuel Generated at Duke Power Co Oconee & McGuire Nuclear Power Facilities.Served on 851121)
  • ML20138M531  + (Decision ALAB-826 Affirming ASLB Final Two Partial Initial Decisions Resolving Issues Affecting Mgt Competence & Integrity in Licensee Favor.Served on 851219)
  • ML20140E543  + (Decision ALAB-832,affirming & Remanding ASLB 850417 & 0826 Partial Initial Decisions for Further Proceedings.Open Issues Await Commission Decision on ALAB-818.Served on 860326)
  • ML20197B026  + (Decision ALAB-836,reversing ASLB Third Partial Initial Decision LBP-85-14 Re Reasonable Assurance of Adequate Number of Bus Drivers to Evacuate Students.Served on 860508)
  • ML20198J776  + (Decision ALAB-837 Affirming That Fes for Plant Satisfies NRC Regulations Rejecting Conservation Council of North Carolina & Eddleman Listed Contentions & Denying Eddleman Petition for Waiver of Commission Rules.Served on 860530)
  • ML20207J704  + (Decision ALAB-841 Affirming LBP-85-35.NRC Shall Ensure That Final Analysis of Hydrogen Control Sys Includes More Detailed Review of Containment Heat Removal Capability & Effects of Combustible Gas Release.Served on 860725)
  • ML20206M781  + (Decision ALAB-843 Affirming Board Third Partial Initial Decision LBP-85-49 Resolving,In Applicants Favor,Several Emergency Planning & Safety Issues.Served on 860818)
  • ML20203L944  + (Decision ALAB-845 Affirming Licensing Board 850612 Order & Fourth Partial Initial Decision LBP-85-25,in Part,To Extent of Excluding Inmates Manpower Mobilization Contention. Intervenor 850726 Appeal Dismissed.Served on 860829)
  • ML20214P966  + (Decision ALAB-847 Reversing Lilco Appeal of Three Issues Re Emergency Planning & Remanding Proceeding to ASLB to Reconsider Decision on Monitoring of Evacuees & Lack of State of Ny Emergency Response Plan.Served on 860919)
  • ML20215D824  + (Decision ALAB-850 Affirming ASLB 860819 Order Terminating Proceeding Involving E Wallace in Response to Commonwealth of Pa.Served on 861010)
  • ML20215N284  + (Decision ALAB-852,affirming ASLB Resolution of Contentions WB-3 & 57-C-3 Re Drug Use at Facility Const Site & Efficacy of Emergency Notification Procedures.Served on 861103)
  • ML20207B387  + (Decision ALAB-853 Denying Atty General of Commonwealth of Ma Appeal from ASLB 861007 Memorandum & Order Authorizing Issuance of OL to Permit Fuel Loading & Precriticality Testing.Served on 861121)
  • ML20214W032  + (Decision ALAB-854 Reversing ASLB 861007 Memorandum & Order Authorizing Issuance of License Allowing Fuel Loading & Precriticality Testing at Facility.Served on 861209)
  • ML20211L582  + (Decision ALAB-855 to Proceed to Consider Pending Lilco Motion to Reopen Record for Purpose of Substituting Other Facilities for Nassau Coliseum.Served on 861215)
  • ML20235Y949  + (Decision ALAB-869.* ASLB Decision LBP-87-17 Admitting Contention 1 Affirmed,Subj to Substitution of Phrase Design Limits of 150 F & Dismissing Commonwealth of Ma Due to Failure to Submit Admissible Contention.Served on 870722)
  • ML18017A813  + (Decision Affirming & Modifying ASLB Jul 1979 Supplemental decision,LBP-79-19.Condition Imposed on CP in Paragraph 201 Deleted & NRC Directed to Ensure That Notices of Hearing Will Not Be Entertained Unless & Until Evaluation Conducted)
  • ML19331A188  + (Decision Affirming 721214 Initial Decision Authorizing Issuance of CP)