Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094Q577 + (Cycle 10 Colr)
- ML20094Q567 + (Cycle 10 Colr)
- ML20217R203 + (Cycle 10 Colr)
- ML18038B973 + (Cycle 10 Colr)
- ML033430498 + (Cycle 10 Core Operating Limits Report)
- ML033290452 + (Cycle 10 Core Operating Limits Report)
- NOC-AE-02001433, Cycle 10 Core Operating Limits Report + (Cycle 10 Core Operating Limits Report)
- ML023020285 + (Cycle 10 Core Operating Limits Report)
- CPSES-200203517, Cycle 10 Core Operating Limits Report + (Cycle 10 Core Operating Limits Report)
- ML023400535 + (Cycle 10 Core Operating Limits Report)
- ML030990531 + (Cycle 10 Core Operating Limits Report (COLR))
- ML041280069 + (Cycle 10 Core Operating Limits Report, Rev. 0)
- ML20207P536 + (Cycle 10 Core Performance Analysis)
- ML20078P961 + (Cycle 10 Core Performance Rept)
- NOC-AE-04001698, Cycle 10 End of Life Moderator Temperature Coefficient Limit Report + (Cycle 10 End of Life Moderator Temperature Coefficient Limit Report)
- ML040890328 + (Cycle 10 End of Life Moderator Temperature Coefficient Limit Report)
- ML20100J894 + (Cycle 10 Fuel Performance Startup Test Rept)
- ML20153G326 + (Cycle 10 Plant Transient Analysis)
- ML020630350 + (Cycle 10 Reload & Core Operating Limits Report)
- ML20153G305 + (Cycle 10 Reload Analysis,Design & Safety Analyses for ENC XN-3 9x9 Reload Fuel)
- ML20028G782 + (Cycle 10 Reload Rept)
- ML020600456 + (Cycle 10 Reload and Core Operating Limits Report)
- ML17249A374 + (Cycle 10 SAR W/Mixed Oxide Assemblies)
- ML20155J471 + (Cycle 10 Sar)
- ML20059K324 + (Cycle 10 Startup Physics Test Rept)
- L-90-298, Cycle 10 Startup Physics Testing Rept. W/ + (Cycle 10 Startup Physics Testing Rept. W/)
- ML18151A689 + (Cycle 10 Startup Physics Tests Rept)
- ML033640573 + (Cycle 10 Startup Report)
- CPSES-200300290, Cycle 10 Startup Report + (Cycle 10 Startup Report)
- ML20063J919 + (Cycle 10 Startup Rept)
- ML20035E272 + (Cycle 10 Startup Rept)
- ML20092K419 + (Cycle 10 Startup Rept,June 1984)
- ML031410541 + (Cycle 10 Startup Test Report Summary)
- ML20205H107 + (Cycle 10 Startup Test Results)
- JAFP-90-0697, Cycle 10 Startup Testing Rept + (Cycle 10 Startup Testing Rept)
- ML20046D408 + (Cycle 10 Summary of Startup Testing)
- ML20198S730 + (Cycle 10 Voltage-Based Repair Criteria 90-Day Rept)
- ML20057D071 + (Cycle 10,COLSS & Cpcs Addressable Constants for Reduction of Operable Incore Detectors)
- ML20083R792 + (Cycle 10,Core Operating Limits Rept, May 1995)
- ML18057B351 + (Cycle 10:Disposition & Analysis of SRP Chapter 15 Events)
- ML031950077 + (Cycle 10A Core Operating Limits Report (COLR))
- ML023380631 + (Cycle 10A Core Operating Limits Report (COLR))
- ML020590136 + (Cycle 11 (U1C11) 90-Day Inservice Inspection (ISI) Summary Report)
- ML031330767 + (Cycle 11 (U2C11) 12-Month Steam Generator (SG) Inspection Report and Metallurgical Examination Report on Tube Removed from Steam Generator)
- ML023010683 + (Cycle 11 12-Month Steam Generator Inspection Report)
- ML040630112 + (Cycle 11 90-Day Steam Generator Report for Voltage Based Alternate Repair Criteria)
- ML20080R786 + (Cycle 11 Colr)
- ML20101F382 + (Cycle 11 Colr)
- ML20107G594 + (Cycle 11 Colr)
- SBK-L-05122, Cycle 11 Core Operating Limits Report + (Cycle 11 Core Operating Limits Report)
- NL-04-0623, Cycle 11 Core Operating Limits Report + (Cycle 11 Core Operating Limits Report)