Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210K973 + (Corrected Transcript of ACRS Subcommittee on Advanced Reactor Designs 870204 Meeting in Washington,Dc.Pp 1-120. Supporting Documentation Encl)
- ML073030157 + (Corrected Transcript of Evidentiary Hearing Held in Toms River, Nj; Pp. 610 - 878)
- ML073030160 + (Corrected Transcript of Evidentiary Hearing Held in Toms River, Nj; Pp. 276 - 609)
- ML19031C835 + (Corrected Transcript of Pilgrim Post-Shutdown Decommissioning Activities Report)
- ML043090521 + (Corrected Transcript of Proceedings Regarding Joseph M. Farley Nuclear Power Plant, License Renewal: Public Meeting Evening Session)
- ML032270600 + (Corrected Transcript of Proceedings, U.S. Nuclear Regulatory Commission: H.B. Robinson Steam Electric Plant, Draft EIS Public Meeting - Afternoon, Hartsville, Sc)
- ML032270601 + (Corrected Transcript of Proceedings: U.S. Nuclear Regulatory Commission: H.B. Robinson Steam Electric Plant Draft EIS Public Meeting - Evening Session, Hartsville, Sc, Enclosure 3)
- ML043280680 + (Corrected Transcript of Public Meeting to Discuss the Supplemental Environmental Impact Statement for the License Renewal of Arkansas Nuclear One, Unit 2)
- ML20248F186 + (Corrected Transcript of Seventh Advisory Committee on Nuclear Waste Meeting on 890222 in Bethesda,Md.Pp 145-440. Supporting Documentation Encl)
- ML023450323 + (Corrected Transcript of Telephone Conference Held on 11/25/02; Pp. 1 - 30)
- ML21215A125 + (Corrected Transcript of the NRC Public Meeting with Stakeholders to Discuss and Receive Input on the Development of NRCs Strategic Plan for Fys 2022 Through 2026 - June 2021)
- ML17209A432 + (Corrected Transmittal Ltr for IE Insp Rept 50-389/80-12)
- 05000346/LER-1950-346, Corrected Transmittal Ltr for Revised LER 50-346/80-091.LER Originally Ref as 80-090 + (Corrected Transmittal Ltr for Revised LER 50-346/80-091.LER Originally Ref as 80-090)
- ML20128B170 + (Corrected Transmittal Ltr to Rept of Operating Statistics & Shutdown for Apr 1985.Date of Ltr Changed from 850410 to 850510.W/o Repts)
- ML20080D618 + (Corrected Trip Rept of Caseload Forecast Panel 791119 Site Visit Re Const Status & Schedule & Startup Test Program)
- ML19086A211 + (Corrected Underlying Decision (DC Cir.)(Case No. 18-1340) - 3/21/19)
- ML20095C097 + (Corrected Unit 2,Cycle 5 Core Operating Limits Rept Figure 2.2-1 Re Power Distribution Limits)
- ML20043E018 + (Corrected Unit Shutdown & Power Reductions Page of Monthly Operating Rept for Apr 1990)
- ML20245G084 + (Corrected Unit Shutdown Data for June 1989 for Cooper Nuclear Station)
- ML20129H960 + (Corrected Unit Shutdown/Reductions Section of Monthly Performance Rept for Month of Mar 1985)
- ML20129H973 + (Corrected Unit Shutdown/Reductions Section of Monthly Performance Rept for Month of Apr 1985)
- ML20043A605 + (Corrected Unit Shutdowns & Power Reductions Rept for Feb 1990 for Arkansas Nuclear One,Unit 1)
- ML20081J246 + (Corrected Unit Shutdowns & Power Reductions Page for Month of Apr 1991 for Unit 1)
- ML20043A607 + (Corrected Unit Shutdowns & Power Reductions Rept for Mar 1990 for Arkansas Nuclear One,Unit 1)
- ML20066D423 + (Corrected Unit Shutdowns & Power Reduction Sheet for Nov 1990 Monthly Operating Rept for Prairie Island Nuclear Generating Station Unit 1)
- ML20153C992 + (Corrected Unit Shutdowns & Power Reductions for Aug 1985)
- ML20237J068 + (Corrected Unit Shutdowns & Power Reductions for June 1987)
- ML20205C610 + (Corrected Unit Shutdowns/Reductions Section to Monthly Operating Rept for Jul 1985)
- ML25363A110 + (Corrected Updated Final Safety Analysis Report, Amendment No. 33)
- ML25363A157 + (Corrected Updated Final Safety Analysis Report, Amendment No. 33)
- ML22313A038 + (Corrected User Need for Rulemaking for Amendment No. 17 to HI-STORM 100 System)
- ML18256A022 + (Corrected V.C. Summer Unit 1 and Independent Spent Fuel Storage Installation Order Approving Indirect License Transfer)
- ML18255A245 + (Corrected V.C. Summer Unit 2 and 3 Order Approving Indirect License Transfer)
- ML15314A069 + (Corrected Values in Final Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events and Spent Fuel Pool Level Indication Status Report)
- ML23167A086 + (Corrected Version NEDO-33910-A, Revision 2, BWRX-300 Reactor Pressure Vessel Isolation and Overpressure Protection)
- ML19211C806 + (Corrected Version of 800104 Request for Reconsideration or, in Alternative,For Certification of ASLB 791218 Order.Urges Admission of Contentions 17,18 & 20.If Not Granted,Issue of Admissibility Should Be Certified to Commission)
- ML20083F592 + (Corrected Version of 831214 Motion for Curtailment of Activities Re Sabotage Protection Plan)
- ML17213A576 + (Corrected Version of Amend 53 to License DPR-67 Deleting Requirement to Test Insulation of Certain Class IE Electrical Undeground Cables for Environ Damage.Tech Specs Omittted from Earlier Version)
- ML20069J712 + (Corrected Version of Answer in Opposition to Applicant & NRC Motions for Summary Disposition of Contention NECNP-I.B.1 Re RHR Sys Failure to Meet GDC 4 & 34.Statement of Matl Facts as to Which There Is Dispute & Certificate of Svc Encl)
- ML20069G793 + (Corrected Version of Final Deficiency Rept Re Robertshaw Controls Thermostatic Valves.Initially Reported on 820820. Corrective Actions Described by Vendor Will Preclude Potential Problems)
- ML20069G790 + (Corrected Version of Final Deficiency Rept Re Misapplication of Torquing Equipment by Beloit Power Sys.Initially Reported on 820820.Corrective Procedure Provided by Vendor Will Preclude Potential Problems)
- IR 05000454/1981006 + (Corrected Version of IE Insp Rept 50-454/81-06 on 810602-03, Previously Identified as 50-454/81-05)
- ML20055A762 + (Corrected Version of IE Insp Rept 70-0984/82-01 on 820426-29.No Noncompliance Noted.Major Areas Inspected: Organization,Facility Changes & Mods,Internal Audits, Criticality Safety & Training)
- ML18095A557 + (Corrected Version of Ltr Forwarding Insp Repts 50-272/90-10, 50-311/90-10 & 50-354/90-07 on 900312-15.One Noncited Violation & Three Unresolved Items Were Identified)
- ML20080C767 + (Corrected Version of Memorandum on HPI Actuation Mystery Man Issue)
- ML19330C042 + (Corrected Version of NRC Response to Sc Sholly Interrogatory 10 Re Safety Evaluation)
- ML20010J583 + (Corrected Version of Objections to ASLB 810805 Memorandum & Order)
- ML19318A119 + (Corrected Version of Re Rescheduled Fuel Load Date for Unit 1.Correct Date Is 810831.Requests Most up-to- Date & Complete Schedule for NRC Safety Review)
- ML20069N420 + (Corrected Version of Response to Public & Party Comments at Commission 821109 Meeting in Harrisburg,Pa.Public Is 100% Against Decision to Restart Plant at Present Time.Svc List Encl)
- ML20127M954 + (Corrected Version of Transcript of 930111 ASLB Gpc,Et Al, Vogtle Electric Generating Plant,Units 1 & 2.Pp 1-4.Related Documentation Encl)
- ML081280294 + (Corrected Version, Review of Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. Analyses of the Effects of Reactor Water Environment on Fatigue Life of Risk-Significant Components During the Period of Extended Operatio)