Text
_
c0000o00o00000cc000ccc00c0 Report Period April [J85 UNIT SHUTDOWNS / REDUCTIONS 0
Byron 1 0
eeeeeeeeeeee****eeeeeeeeen No.
Date h Hours Reason Method LER Number System en=panent Cause & Corrective Action to Prevent Recurrence 10 4/2/85 F
32.1 G
3 85-039 Feedwater Pump Flow was lost due to procedural error while performing initial controller transfer to AUTO. Procedure was revised to Correct.
11 4/10/85 F
62.1 A
3 85-042 Reactor Trip due to dropped control rods.
Faulty Rod Control Logic Cabinet card replaced.
12 4/15/85 S
24.4 B
2 Startup Test Sequence (Plant Trip from 25%
Power) i 13 4/21/85 F
25.2 A
3 85-046 Reactor Trip on Low-Low Steam Generator Level due to a sticking relay following ESFAS surveillance. The faulty relay was replaced.
1 I.
cocooceeeeeeeee o
Summary Byron 1 completed its 30% Startup Test Sequence and is in its 50% test sequence.
ocococeaneseee.
TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H
( S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for j
C-Refueling H-Other 3-Auto Scram Preparation of j
D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-0161)
I B506070704 850528 POR ADOCK 05000454 R
) (0625M)