Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20084P676 + (Chapter 5 of RESAR-SP/90 Westinghouse Advanced PWR Module 2, Regulatory Conformance, Generic Safety Issues)
- ML19329D987 + (Chapter 5 of Rancho Seco PSAR, Containment Sys. Includes Revisions 1-4)
- ML19312A209 + (Chapter 5 of S&W SWESSAR-P1, RCS & Connected Sys)
- ML19309A558 + (Chapter 5 of VA Polytechnic Inst & State Univ Research & Training Reactor PSAR, Radiation Safety)
- ML19319D682 + (Chapter 5 to Crystal River 3 & 4 PSAR, Containment Sys. Includes Revisions 1-10)
- ML17138B574 + (Chapter 5 to Environ Qualification Rept for Class IE Equipment)
- ML20030A341 + (Chapter 5 to Final Hazards Summary Rept for Big Rock Poing, Reactor Sys Equipment)
- ML20049H278 + (Chapter 5 to Gessar, RCS & Connected Sys)
- ML20008D767 + (Chapter 5 to Midland 1 & 2 PSAR, Reactor Bldg & Structures. Includes Revisions 1-36)
- ML20008D768 + (Chapter 5 to Midland 1 & 2 PSAR, Reactor Bldg & Structures. Includes Revisions 1-36)
- ML20008D769 + (Chapter 5 to Midland 1 & 2 PSAR, Use of Coarse Aggregate W/Varied Percentage of Matl Passing Sieve 200. Prepared for Util)
- ML20030A446 + (Chapter 5 to Preliminary Hazards Summary Rept for Big Rock Point, Site & Environ)
- ML19347A386 + (Chapter 5 to State Univ of Ny at Buffalo Final Hazards Summary Rept,Revision 2, Reactivity Requirements)
- ML19309C543 + (Chapter 5 to TMI-1 PSAR, Containment Sys. Includes Revisions 1-11)
- ML19341C526 + (Chapter 5 to Univ of Tx Triga Mark I RSAR, Reactor Room)
- ML20008E434 + (Chapter 5 to Yankee Rowe Final Hazards Summary Rept, Plant Operation)
- ML20008E428 + (Chapter 5 to Yankee Rowe Preliminary Hazards Summary Rept, Accidents & Hazards. Includes Revisions Through 581201)
- ML18075A058 + (Chapter 5, Confinement - NUHOMS Eos System Updated Final Safety Analysis Report)
- ML20011D739 + (Chapter 5, RCS & Connected Sys to Updated Final Hazards Summary Rept for Big Rock Point Plant)
- ML20247G913 + (Chapter 5, RCS & Connected Sys, to CESSAR Sys 80+ Std Design.W/Two Oversize Encls)
- ML20207S278 + (Chapter 5, RCS & Connected Sys, to Nonproprietary RESAR-SP/90 Westinghouse Advanced Pwr,Module 10, Containment Sys)
- ML030090207 + (Chapter 5. Review by the Advisory Committee on Reactor Safe Guards - Safety Evaluation Report Related to the License Renewal of McGuire Nuclear Station, Units 1 and 2, Catawba Nuclear Station, Units 1 and 2)
- ML19308C113 + (Chapter 5103:NRC Review of Contractor Invoices)
- ML20321A100 + (Chapter 6 - Shielding Evaluation)
- ML25303A305 + (Chapter 6 - Us NRC Draft Safety Evaluation Related to the U.S. Sfr Owner, LLC Construction Permit Application for the Kemmerer Power Station Unit 1)
- ML20343A196 + (Chapter 6 Criticality Evaluation)
- ML022270688 + (Chapter 6 Draft SER with Open Items, Conclusions)
- ML19329E139 + (Chapter 6 of AR Nuclear 1 PSAR, Engineered Safeguards. Includes Revisions 1-18)
- ML19319C277 + (Chapter 6 of Davis-Besse PSAR, Engineered Safety Features. Includes Revisions 1-8)
- ML19322A788 + (Chapter 6 of Oconee 1,2 & 3 PSAR, Engineered Safeguards. Includes Revisions 1-6)
- ML20090J866 + (Chapter 6 of RESAR-SP/90 Westinghouse Advanced PWR Module 3, Introduction & Site, Esf)
- ML20099J008 + (Chapter 6 of RESAR-SP/90 Westinghouse Advanced PWR Module 9, Instrumentation & Controls & Electric Power, Esf)
- ML20084P681 + (Chapter 6 of RESAR-SP/90 Westinghouse Advanced PWR Module 2, Regulatory Conformance, Regulations & Regulatory Guidance)
- ML20128P742 + (Chapter 6 of RESAR-SP/90 Westinghouse Advanced PWR Module 11, Radiation Protection, Esf)
- ML20106E681 + (Chapter 6 of RESAR-SP/90 Westinghouse Advanced PWR Module 7, Structural/Equipment Design, Esf)
- ML19329D988 + (Chapter 6 of Rancho Seco PSAR, Engineered Safeguards. Includes Revisions 1-4)
- ML19312A210 + (Chapter 6 of S&W SWESSAR-P1, Engineered Safety Features)
- ML19309A564 + (Chapter 6 of VA Polytechnic Inst & State Univ Research & Training Reactor PSAR, DBA)
- ML19319D683 + (Chapter 6 to Crystal River 3 & 4 PSAR, Engineered Safeguards. Includes Revisions 1-10)
- ML20030A343 + (Chapter 6 to Final Hazards Summary Rept for Big Rock Point, Power Sys Equipment)
- ML20049H279 + (Chapter 6 to Gessar, Esfs)
- ML20008D779 + (Chapter 6 to Midland 1 & 2 PSAR, Engineered Safeguards. Includes Revisions 1-36)
- ML20030A448 + (Chapter 6 to Preliminary Hazards Summary Rept for Big Rock Point, Waste Disposal)
- ML19347A387 + (Chapter 6 to State Univ of Ny at Buffalo Final Hazards Summary Rept,Revision 2, Personnel & Organization)
- ML19341C529 + (Chapter 6 to Univ of Tx Triga Mark 1 RSAR, Instrumentation & Control)
- ML20207S294 + (Chapter 6, ESF, to Nonproprietary RESAR-SP/90 Westinghouse Advanced Pwr,Module 10, Containment Sys)
- ML20011D754 + (Chapter 6, ESFs to Updated Final Hazards Summary Rept for Big Rock Point Plant)
- ML20247H033 + (Chapter 6, Esfs, to CESSAR Sys 80+ Std Design.W/One Oversize Encl)
- ML20132D986 + (Chapter 6, Radon Barrier, of Umtrap Design Procedures)
- ML25127A219 + (Chapter 6, Section 6.12, Materials Security Enforcement Policy Revision for Public Comment)
- ML030090213 + (Chapter 6. Conclusions - Safety Evaluation Report Related to the License Renewal of McGuire Nuclear Station, Units 1 and 2, Catawba Nuclear Station, Units 1 and 2)