Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20090J848 + (Chapter 2 of RESAR-SP/90 Westinghouse Advanced PWR Module 3, Introduction & Site, Site Characteristics)
- ML19329D984 + (Chapter 2 of Rancho Seco PSAR, Site & Environ. Includes Revisions 1-4)
- ML19312A206 + (Chapter 2 of S&W SWESSAR-P1, Site Characteristics)
- ML19309A546 + (Chapter 2 of VA Polytechnic Inst & State Univ Research & Training Reactor PSAR, Sys Mods)
- ML20128L847 + (Chapter 2 of Westinghouse RSAR, Accident Sequence Modeling)
- ML19319D679 + (Chapter 2 to Crystal River 3 & 4 PSAR, Site & Environ. Includes Revisions 1-10)
- ML20030A335 + (Chapter 2 to Final Hazards Summary Rept for Big Rock Point, Plant Site & Environ)
- ML20049H265 + (Chapter 2 to Gessar, Site Characteristics)
- ML20008D761 + (Chapter 2 to Midland 1 & 2 PSAR, Site & Environ. Includes Revisions 1-36)
- ML20030A436 + (Chapter 2 to Preliminary Hazares Summary Rept for Big Rock Point, Summary)
- ML19347A383 + (Chapter 2 to State Univ of Ny at Buffalo Final Hazards Summary Rept,Revision 2, Location)
- ML19309C539 + (Chapter 2 to TMI-1 PSAR, Site & Environ. Includes Revisions 1-11)
- ML19341C518 + (Chapter 2 to Univ of Tx Triga Mark I RSAR Site Description)
- ML20008E431 + (Chapter 2 to Yankee Rowe Final Hazards Summary Rept, Plant Design)
- ML20215J375 + (Chapter 2, Power Generation Sys, to Advanced LWR Util Requirements Document)
- ML20011D736 + (Chapter 2, Site Characteristics, to Final Hazards Summary Rept for Big Rock Point Plant)
- ML20207S262 + (Chapter 2, Site Characteristics, to Nonproprietary RESAR-SP/90 Westinghouse Advanced Pwr,Module 10, Containment Sys)
- ML20247G678 + (Chapter 2, Site Envelope Characteristics, to CESSAR Sys 80+ Std Design)
- ML030090169 + (Chapter 2. Scoping and Screening - Safety Evaluation Report Related to the License Renewal of McGuire Nuclear Station, Units 1 and 2, Catawba Nuclear Station, Units 1 and 2)
- ML20321A097 + (Chapter 3 - Principal Design Criteria Evaluation)
- ML24290A009 + (Chapter 3 - Radiation Protection Standards)
- ML030420548 + (Chapter 3 - Safety Evaluation Report with Open Items Related to the License Renewal of St. Lucie Nuclear Plant, Units 1 & 2)
- ML25303A299 + (Chapter 3 - Us NRC Draft Safety Evaluation Related to the U.S. Sfr Owner, LLC Construction Permit Application for the Kemmerer Power Station Unit 1)
- ML022270652 + (Chapter 3 Draft SER with Open Items, Aging Management Review Results)
- ML18052B316 + (Chapter 3 Phase 4 SER)
- ML20343A193 + (Chapter 3 Thermal Evaluation)
- ML19329E136 + (Chapter 3 of AR Nuclear 1 PSAR, Reactor. Includes Revisions 1-18)
- ML19322A782 + (Chapter 3 of Oconee 1,2 & 3 PSAR, Reactor. Includes Revisions 1-6)
- ML20090J854 + (Chapter 3 of RESAR-SP/90 Westinghouse Advanced PWR Module 3, Introduction & Site, Design of Structures,Components, Equipment & Sys)
- ML20128P690 + (Chapter 3 of RESAR-SP/90 Westinghouse Advanced PWR Module 11, Radiation Protection, Design of Structures, Components,Equipment & Sys)
- ML20099H988 + (Chapter 3 of RESAR-SP/90 Westinghouse Advanced PWR Module 9, Instrumentation & Controls & Electric Power, Design of Structures,Components,Equipment & Sys)
- ML20084P671 + (Chapter 3 of RESAR-SP/90 Westinghouse Advanced PWR Module 2, Regulatory Conformance, Post-TMI Requirements & Recommendations)
- ML20106E669 + (Chapter 3 of RESAR-SP/90 Westinghouse Advanced PWR Module 7, Structural/Equipment Design, Design of Structures, Components,Equipment & Sys)
- ML19329D985 + (Chapter 3 of Rancho Seco PSAR, Reactor. Includes Revisions 1-4)
- ML19312A207 + (Chapter 3 of S&W SWESSAR-P1, Design of Structures, Components,Equipment & Sys)
- ML19309A550 + (Chapter 3 of VA Polytechnic Inst & State Univ Research & Training Reactor PSAR, Thermal-Hydraulics Analysis)
- ML20128L858 + (Chapter 3 of Westinghouse RSAR, Plant Sys Analysis)
- ML19319D680 + (Chapter 3 to Crystal River 3 & 4 PSAR, Reactor. Includes Revisions 1-10)
- ML19319C289 + (Chapter 3 to Davis-Besse PSAR, Reactor. Includes Revisions 1-8)
- ML20030A338 + (Chapter 3 to Final Hazards Summary Rept for Big Rock Point, Containment)
- ML20008D764 + (Chapter 3 to Midland 1 & 2 PSAR, Reactor. Includes Revisions 1-36)
- ML20030A443 + (Chapter 3 to Preliminary Hazards Summary Rept for Big Rock Point, Description of Plant)
- ML19347A384 + (Chapter 3 to State Univ of Ny at Buffalo Final Hazards Summary Rept,Revision 2, Reactor Bldg)
- ML19309C541 + (Chapter 3 to TMI-1 PSAR, Reactor. Includes Revisions 1-11)
- ML19341C519 + (Chapter 3 to Univ of Tx Triga Mark I RSAR, Reactor)
- ML20008E432 + (Chapter 3 to Yankee Rowe Final Hazards Summary Rept, Site)
- ML20008E426 + (Chapter 3 to Yankee Rowe Preliminary Hazards Summary Rept, Site. Includes Revisions Through 581201)
- ML20207S268 + (Chapter 3, Design of Structures,Components,Equipment & Sys, to Nonproprietary RESAR-SP/90 Westinghouse Advanced Pwr,Module 10, Containment Sys)
- ML20247G714 + (Chapter 3, Design of Structures,Components,Equipment & Sys, to CESSAR Sys 80+ Std Design)
- ML20011D737 + (Chapter 3, Design of Structures,Components,Equipment & Sys to Updated Final Hazards Summary Rept for Big Rock Point Plant)
- ML18029A130 + (Chapter 3, Seismic Subsystem Analysis, Section 3.7.3, GEH Advanced Boiling Water Reactor DC Renewal)