Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18136A498 + (COL Docs - Vogtle 3 and 4 Audit Summary VEGP LAR 17-021)
- ML21228A005 + (COL Docs - Vogtle 3 and 4 August 19 Public Meeting Material)
- ML23135A789 + (COL Docs - Vogtle 3&4 LAR 23-003 Relocation of TS 3.7.9 Spent Fuel Pool Makeup Water Sources to TRM)
- ML23128A077 + (COL Docs - Vogtle 3&4 LAR 23-006 More Restrictive Action for Technical Specification 3.1.9 Supplement)
- ML19364A078 + (COL Docs - Vogtle 3&4 LAR-19-020 Cyber Security Plan Changes Acceptance Letter)
- ML20087M465 + (COL Docs - Vogtle 3&4 LAR-19-020 Cyber Security Plan Changes Acceptance Letter)
- ML19347A394 + (COL Docs - Vogtle 3&4: Request for Tech Exchange Regarding Cmt Boron Concentration Surveillance)
- ML18010A915 + (COL Docs - Vogtle COLs - Technical Meeting on Shake-Space LAR January 11, 2018)
- ML19231A345 + (COL Docs - Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4, Draft Completion Plan for Uncompleted ITAAC 2.2.03.10 (Index Number 206))
- ML20042A966 + (COL Docs - Vogtle Electric Generating Plant Units 3 and 4 - Draft for the February 20, 2020 Public Meeting)
- ML19276A212 + (COL Docs - Vogtle Electric Generating Plant Units 3 and 4, Request for Additional Information Regarding License Amendment Request (LAR) 19-013, Pressurizer Surge Line Stratification)
- ML19164A186 + (COL Docs - Vogtle June 13 Meeting Presentation - Functional Arrangement ITAAC LAR)
- ML19151A883 + (COL Docs - Vogtle June 13 Meeting Presentation - Nonsafety ITAAC Optimization)
- ML19151A881 + (COL Docs - Vogtle June 13 Meeting Presentation - Time Between ITAAC Complete and 103g (003).pdf)
- ML19151A885 + (COL Docs - Vogtle June 13 Meeting Presentation - FLEX Staff and Comms)
- ML19164A187 + (COL Docs - Vogtle June 13 Technical Exchange Presentation - Nonsafety-Related ITAAC Optimization)
- ML19172A119 + (COL Docs - Vogtle June 27 Pre-Submittal Meeting - Pressurizer Surge Line Draft LAR)
- ML19176A527 + (COL Docs - Vogtle June 27 Pre-Submittal Meeting - Presentation for the Pressurizer Surge Line LAR)
- ML18016A093 + (COL Docs - Vogtle LAR 17-023 Final RAI Questions - Paul.Docx)
- ML19337B673 + (COL Docs - Vogtle LAR 19-018 Discussion)
- ML18018B155 + (COL Docs - Vogtle LAR-16-030R1 Final RAI 1-18-2018)
- ML18095A202 + (COL Docs - Vogtle LAR-16-030R1S1 Clarifications Questions Edited.Docx)
- ML18149A372 + (COL Docs - Vogtle LAR-17-024 Draft RAI No3 3Q 5-29-2018)
- ML18151B056 + (COL Docs - Vogtle LAR-17-024 Draft RAI No3 3Q Version 5-31-2018)
- ML18059A841 + (COL Docs - Vogtle LAR-17-039 Draft Audit Plan Dated 2-28-18)
- ML18232A173 + (COL Docs - Vogtle LAR-17-043 Draft RAI No2)
- ML18115A124 + (COL Docs - Vogtle LAR-17-043 Final Audit Plan)
- EPID:L-2018-LLA-0005 + (COL Docs - Vogtle LAR-17-043 Final Audit Plan)
- ML18138A143 + (COL Docs - Vogtle LAR-18-015 Fire Protection System Non-Safety Cable Spray Removal 1 Acceptance Letter.Pdf)
- ML18313A005 + (COL Docs - Vogtle LAR-18-021 Final Audit Plan on Power Operated Relief Valve Noise Mitigation)
- ML18243A033 + (COL Docs - Vogtle LAR-18-021 PORV Noise Mitigation - Acceptance Letter)
- EPID:L-2018-LLA-0225 + (COL Docs - Vogtle LAR-18-021 PORV Noise Mitigation - Acceptance Letter)
- ML18261A246 + (COL Docs - Vogtle LAR-18-024 Admin Changes to Align Initial Test Program with RG 1.68 - Acceptance Letter)
- ML19214A043 + (COL Docs - Vogtle LAR-19-005 Draft RAI 9696)
- ML19221B449 + (COL Docs - Vogtle LAR-19-005 Draft RAI 9696)
- ML19190A077 + (COL Docs - Vogtle LAR-19-005 Draft RAI 9696 7-9-19)
- ML23137A216 + (COL Docs - Vogtle LAR-22-002 Final RAI TS 3.8.3 Has Been Issued)
- ML23032A291 + (COL Docs - Vogtle Unit 3 Exigent LAR 23-004, Acceptance Review)
- ML22263A021 + (COL Docs - Vogtle Unit 4 - Acceptance of Requested Licensing Action LAR 22-003)
- ML19233A197 + (COL Docs - Vogtle Units 3 and 4 - LAR 19-XXX, PRHR Natural Circulation Fpot Pre-Submittal Presentation - Public)
- ML19072A060 + (COL Docs - Vogtle Units 3 and 4 - March 21 Presubmittal Meeting Request for 2 LARs)
- ML20029F008 + (COL Docs - Vogtle Units 3 and 4 - NRC Staff Questions on LAR 19-019 Audit (Public-Redacted))
- ML18225A016 + (COL Docs - Vogtle Units 3 and 4 Draft LAR ITP-3 for 8/16 Pre-Submittal Meeting)
- ML20090E104 + (COL Docs - Vogtle Units 3 and 4 Technical Exchange - LAR-20-003 (LAR 232): Technical Specifications ESFAS-VES and Vacuum Relief)
- ML20009E663 + (COL Docs - Vogtle Units 3 and 4, LAR 19-019, Reconciliation of Environmental Conditions Inputs to Civil Structural Design Licensing, NRC Staff Acceptance)
- ML20036F159 + (COL Docs - Vogtle Units 3 and 4, LAR 19-017, Removal of the Preoperational PRHR Natural Circulation Test, NRC Staff Acceptance)
- ML19249D651 + (COL Docs - Vogtle Units 3 and 4, SNC Presentation for 9/10 Public Meeting 52.103(g) Process)
- ML19240A051 + (COL Docs - Vogtle Units 3 and 4: Draft Letters for 52.103g Tabletop Public Meeting on 9/10)
- ML23025A165 + (COL Docs - Vogtle Units 3&4 Acceptance Letter for LAR-22-002 Technical Specification 3.8.3, Inverters – Operating)
- ML23156A464 + (COL Docs - Vogtle, Units 3 & 4 - Acceptance of LAR 23-006, Rev. 1, More Restrictive Action for Technical Specification 3.1.9)
- ML23158A008 + (COL Docs - Vogtle, Units 3 & 4 - Acceptance of LAR 23-003, Relocation of TS 3.7.9 Spent Fuel Pool Makeup Water Sources)
- ML20008D632 + (COL Docs - Work Hour Rule Presentation)