Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML051320300 + (CENPD-279, Supplement 16, Annual Report on Combustion Engineering ECCS Performance Evaluation Models for PWRs)
- ML063560065 + (CENPD-279, Supplement 17, Annual Report on Combustion Engineering ECCS Performance Evaluation Models for Pwrs)
- ML22217A040 + (CENPD-289-NP, Supplement 1, Revision 0, Use of Inert Replacement Rods in CE 16x16 Next Generation Fuel (CE16NGFTM))
- ML17227A829 + (CEOG Program to Evaluate Chemical Content of Weld Deposits Fabricated Using Heats A8746 & 34B009)
- ML081560726 + (CEP-ISI-104, Rev. 0, ASME Section XI, Division 1, Inservice Inspection Program)
- ML20151H819 + (CESSAR-DC Submittal Group B - Revs to Chapters 1,4,5 & 9)
- ML20260B501 + (CF - Feedwater Reactor Bldg Steam Generator 1C. Sheet 9. Actual Drawing NUMBER:MC-1403-06-40-01)
- ML20260B495 + (CF - Feedwater Reactor Bldg Steam Generator 1D. Sheet 10. Actual Drawing NUMBER:MC-1403-06.40-01)
- ML24263A300 + (CFFF April 2024 Groundwater Sampling Results/Groundwater Monitoring Data Summary Table, Dated July 25, 2024)
- ML19057A175 + (CFFF Cancel Request for Release of Funds from the Standby Trust Agreement)
- ML19134A031 + (CFFF Lpr Presentation May 7 2019)
- ML21056A317 + (CFO Response to Aerotest November 11 2020 Letter)
- ML20345A031 + (CFO Response to Aerotest November 2020 Letter Re Lfb 20-1849)
- ML23151A072 + (CFPP Cola Readiness Assessment Plan)
- PMNS20230821, CFPP Combined License Application + (CFPP Combined License Application)
- PMNS20230823, CFPP Combined License Application + (CFPP Combined License Application)
- PMNS20230797, CFPP Combined License Application + (CFPP Combined License Application)
- ML23151A471 + (CFPP Docs - FW Cfppnrc Extension of Pre-application Readiness Assessment for the Draft Limited Work Authorization Environmental Report)
- ML23121A110 + (CFPP Docs - FW EAL and ERO Topical Reports Pre-submittal Meeting Week of April 24th)
- ML23257A202 + (CFPP Docs - FW Proposed Schedule Change for NRC Readiness Assessment)
- ML23303A023 + (CFPP Docs - FW Re NRC Staffs Request for Additional Information for CFPP LWA - Draft RAI-10109-R1)
- ML23258A041 + (CFPP Docs - Fwd CFPP Cola NRC Readiness Assessment Phase 6)
- ML23303A022 + (CFPP Docs - NRC Staffs Request for Additional Information for CFPP LWA - Draft RAI-10109-R1)
- ML23096A196 + (CFPP Docs - the NRC Staff’S Safety Evaluation Report for NuScale Topical Report TR-121172-NP, Revision 3, Carbon Free Power Project (CFPP) Quality Assurance Program Description, Revision 005)
- ML23317A110 + (CFPP LLC Request to Withdraw the Limited Work Authorization Application, Topical Reports, and Exemption Request Associated with the Carbon Free Power Project (CFPP) Combined License Application)
- ML22347A220 + (CFPP NRC Environmental Overview Slide Presentation)
- L-2020-154, CFR 140.21 Licensee Guarantees of Payment of Deferred Preminms + (CFR 140.21 Licensee Guarantees of Payment of Deferred Preminms)
- RA-18-0003, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums + (CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums)
- L-2009-273, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums + (CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums)
- RA-19-0186, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums + (CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums)
- RA-21-0046, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums + (CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums)
- L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums + (CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums)
- ML12145A633 + (CFR 2.206 Petition Review Board 5-16-12, Teleconference)
- ML113050555 + (CFR 20 Appendix G Section Iii.E Report)
- ML112690210 + (CFR 20 Appendix G Section Iii.E Report)
- LR-N12-0125, CFR 20.2206 Report - Apportion the 2011 Site Dose + (CFR 20.2206 Report - Apportion the 2011 Site Dose)
- LR-N14-0112, CFR 20.2206 Report - Apportion the 2013 Site Dose Between Salem and Hope Creek Station + (CFR 20.2206 Report - Apportion the 2013 Site Dose Between Salem and Hope Creek Station)
- NRC-13-0028, CFR 20.2206 Report of Individual Monitoring + (CFR 20.2206 Report of Individual Monitoring)
- NRC-19-0036, CFR 20.2206 Report of Individual Monitoring + (CFR 20.2206 Report of Individual Monitoring)
- ML23108A200 + (CFR 20.2206(b) Personnel Radiation Exposure Report for 2022)
- ML19065A297 + (CFR 21 Follow-up Report for General Electric Hitachi (GEH) Relay Contact Cartridge DJ148C6159P001)
- ML12068A372 + (CFR 21 Interim Report - Cracks in Residual Heat Removal Pump Motor Stator Frames)
- ML12145A670 + (CFR 21 Interim Report - Unexpected Degradation of Vital Batteries III and IV)
- ML072630549 + (CFR 21 Notification - Identification of Defect Problem Investigation Process No.: O-04-5550)
- ML072630547 + (CFR 21 Notification - Identification of Defect Problem Investigation Process No.: O-04-5550)
- ML063120422 + (CFR 21 Notification - Identification of Defect Problem Investigation Process No.: O-03-4686)
- ML052640220 + (CFR 21 Notification - Identification of Defect)
- ML081960118 + (CFR 21 Notification - Identification of Defect, Issue Report 741412)
- ML033040401 + (CFR 21 Notification for GE Magne-Blast Breaker Tune & Piston Assemblies)
- 05000323/LER-2006-001, CFR 21 Notification of a Defective Residual Heat Removal Check Valve + (CFR 21 Notification of a Defective Residual Heat Removal Check Valve)
- ML103350168 + (CFR 21 Notifications - Identification of Defect, Mackson Inc. - Defective Tube Steel)
- ML24302A240 + (CFR 21 Report 1-BY-BC-1-LV Battery Charger)
- JAFP-11-0089, CFR 21 Report Concerning Defective Rosemount Model 710DU Master Trip Units + (CFR 21 Report Concerning Defective Rosemount Model 710DU Master Trip Units)
- ML24018A011 + (CFR 21 Report Emergency Diesel Generator Fuel Oil Piping)
- NL-08-0646, CFR 21 Report, GEH CR120A Relay/Relay Coil Wire Clamp Cracking + (CFR 21 Report, GEH CR120A Relay/Relay Coil Wire Clamp Cracking)