Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML19199A0342019-07-0505 July 2019 Lake Engineering Co., Third Interim Notification Per 10 CFR Part 21 Degraded Snubber SF1154 Hydraulic Fluid Batch No. ZJS1518 ML19071A1122019-03-0101 March 2019 Lake Engineering Co., Corrected Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 11KLVS146 Final Report, Per 10 CFR Part 21 ML18295A1992018-09-24024 September 2018 Lake Engineering - Second Interim Notification Per 10 CFR Part 21: Degraded Snubber SF1154 Hydraulic Fluid Batch No. 11KLVS146 ML17313A4712017-11-0303 November 2017 Part 21 - Potentially Degraded Snubber SF1154 Hydraulic Fluid Batch 14ELVS145 Interim Report ML17212A6282017-07-24024 July 2017 Lake Engineering Co. - Potentially Degraded Snubber SF1154 Hydraulic Fluid Second - Interim Notification Per 10 CFR Part 21 ML17206A0392017-07-13013 July 2017 Part 21 - Hex Cap Screws Produced with Pre-existing Cracks ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML16294A2642016-10-18018 October 2016 Part 21 Report - Defective Current to Pressure Transducers ML16281A2712016-09-30030 September 2016 Part 21 - Safety Related Component Welding by an Unqualified Welder ML16281A2702016-09-22022 September 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16278A4712016-09-22022 September 2016 Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close ML16243A4752016-08-26026 August 2016 Part 21 Safety Related Component Welding by an Unqualified Welder ML16139A8322016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close ML16139A8332016-05-13013 May 2016 Part 21 - Initial Notification of Masterpact Breaker Fail to Close TMI-15-133, Part 21 Notification Due to Breaker Defect2015-12-28028 December 2015 Part 21 Notification Due to Breaker Defect ML15103A4852015-04-0707 April 2015 Itt Engineered Valves - 2nd Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M I Diaphragms, Customer Testing ML14351A3082014-12-16016 December 2014 10 CFR Part 21 Notification for a Defect in LOCA Analyses for B&W Plants ML14337A0952014-11-25025 November 2014 Part 21 - Defect in LOCA Analysis for B&W Plants ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14261A1502014-09-17017 September 2014 Interim Report to the NRC of 10 CFR 21 Event 50285, Reported by Itt 07/18/14 Concerning M1 Diaphragms, Customer Testing ML14129A4362014-05-0808 May 2014 Interim Report -10CFR 21 Evaluation Regarding Potential Deficiencies in ASME Code Required Valve and Component Testing ML14303A5262014-03-28028 March 2014 Interim Part 21 Report - Misaligned Separators in LCR-25 Standby Batteries ML13238A2532013-08-21021 August 2013 Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13093A1532013-04-0202 April 2013 Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective Tie Wraps and Holders ML13091A3872013-03-28028 March 2013 Part 21 Report - Foxboro Power Supply Potential Failure Due to Defective Tie Wraps and Holders ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12283A2462012-09-28028 September 2012 Part 21 - Fairbanks Morse Opposed Piston EDG Oil Pump Leak ML12094A3712012-04-0202 April 2012 Part 21 Report - Rosemount Pressure Transmitters with Nonzero Based Calibrations ML11186A9042011-06-30030 June 2011 Notification of Potential Part 21 Appendix R Analyses Fails to Recognize Hot-Short Failure Resulting in the Loss of an Essential Electrical Bus ML1007604682009-11-22022 November 2009 Potential Part 21 on Offsite Notification of Radiation Release in Containment Associated with Steam Generator Removal ML0823901062008-08-25025 August 2008 Notification of Potential Part 21 on Failure of F and G Switches ML0819601182008-07-0909 July 2008 CFR 21 Notification - Identification of Defect, Issue Report 741412 ML0817000942008-06-13013 June 2008 Notification of Potential Part 21 Report on Report Involving Commercial Grade Relay Contacts Containing Potential Defects ML0809906342008-04-0404 April 2008 Part 21 Notification Regarding Failure to Comply with the Requirements for Dedication of Commercial Grade Items ML0609504012006-04-0303 April 2006 Director Office of Inspection & Enforcement Reference: 10 CFR 21 Notification of 3/30/06 Rev1 2019-07-05
[Table view] Category:Letter
MONTHYEARML24038A0222024-02-0505 February 2024 Achp Letter on Section 106 Programmatic Agreement Participation IR 05000289/20230062024-01-29029 January 2024 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report No. 05000289/2023006 ML23342A1242024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan ML23325A1092024-01-0505 January 2024 Review of the Management Plan for Three Mile Island Station, Unit No. 2, Debris Material ML23354A2062023-12-20020 December 2023 (TMI-2), Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23354A2112023-12-20020 December 2023 Response to Request for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 IR 05000320/20230032023-11-28028 November 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2, NRC Inspection Report No. 05000320/2023003 ML23243A9082023-08-29029 August 2023 Shpo Letter to TMI-2 Regarding Section 106 Activities IR 05000320/20230022023-08-17017 August 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report 05000320/2023002 ML23216A1742023-08-14014 August 2023 Consultation Letter to David Morrison for TMI-2 ML23216A1772023-08-14014 August 2023 Consultation Letter to Rebecca Countess for TMI-2 ML23216A1752023-08-14014 August 2023 Consultation Letter to Joanna Cain for TMI-2 ML23216A1732023-08-14014 August 2023 Consultation Letter to Christine Turner for TMI-2 IR 05000289/20230052023-08-14014 August 2023 Constellation Energy Generation, LLC, Three Mile Island Nuclear Station, Unit 1 - NRC Inspection Report 05000289/2023005 ML23216A1782023-08-14014 August 2023 Consultation Letter to Steve Letavic for TMI-2 ML23221A1402023-08-0808 August 2023 (TMI-2), Response to Requests for Additional Information for the TMI-2 Post-Shutdown Decommissioning Activities Report, Rev. 5 ML23200A1882023-07-31031 July 2023 TMI-2 Correction Letter Amendment 67 ML23209A7632023-07-28028 July 2023 Letter from PA Shpo to TMI-2 Solutions on Cultural and Historic Impacts of Decommissioning ML23192A8272023-07-10010 July 2023 TMI-2 Solutions, LLC - Response to Shpo Request for Additional Information for Er Project 2021PR03278.006, TMI-2 Decommissioning Project ML23167A4642023-07-0505 July 2023 Letter - TMI-2- Exemption 10 CFR Part 20 Append G Issuance ML23167A0312023-06-28028 June 2023 Acceptance Review and Schedule for the Request for Exemption from a Requirement from 10 CFR 20, Appendix G, Section Iii.E, EPID L-2023-LLE-0016 ML23171B0222023-06-19019 June 2023 (TMI-2) - Notification Pursuant to 10 CFR 72.140(d) Regarding Application of Previously Approved TMI-2 Quality Assurance Program to Independent Spent Fuel Storage Installation Activities ML23137A2822023-05-17017 May 2023 (TMI-2), Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23138A0662023-05-17017 May 2023 TMI-2 NHPA Section 106 Shpo Letter to NRC 5-17-23 ML23026A3132023-05-0202 May 2023 Issuance of Exemption from 10 CFR 70.24 (EPID-L-2023-LLE-0003) ML23122A1842023-05-0101 May 2023 Shpo_Er_Summary_Letter ML23121A2492023-05-0101 May 2023 License Amendment Request, Historic and Cultural Resources Review, Response to Request for Additional Information ML23117A0012023-04-26026 April 2023 Commitment Revision Summary Report ML23027A0832023-04-24024 April 2023 Environmental Assessment/Finding of No Significant Impact - Request for Exemption from 10 CFR 70.24 ML23108A0802023-04-18018 April 2023 Annual Radiological Effluent Release Report ML23108A0822023-04-18018 April 2023 Annual Radiological Environmental Operating Report IR 05000320/20230012023-04-12012 April 2023 TMI-2 Solutions, LLC, Three Mile Island Nuclear Station, Unit 2 - NRC Inspection Report No. 05000320/2023001 ML23102A0382023-04-10010 April 2023 Occupational Radiation Exposure Annual Report ML23108A2002023-04-10010 April 2023 CFR 20.2206(b) Personnel Radiation Exposure Report for 2022 ML23094A2582023-04-0606 April 2023 Letter to Sidney Hill, Chief, Onondaga Nation, Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for TMI 2 ML23093A0572023-04-0606 April 2023 Letter to Joanna Cain, President, Re., Ongoing Activities Related to the Proposed License Amendment Request for Three Mile Island Nuclear Station, Unit 2 ML23094A2362023-04-0606 April 2023 Letter to Carissa Speck, Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for Three Mile Island Nuclear Station, Unit 2 ML23094A2542023-04-0606 April 2023 Ltr J Bendremer Thpo Stockbridge-Munsee Community Band of Mohican Indians Re Initiation of Consultation Under Section 106 of the NHPA for Proposed License Amendment Request for TMI 2 ML23086C0652023-04-0606 April 2023 Ltr Larry Heady, Thpo, De. Tribe of Indian; Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for TMI Nuclear Station, Unit 2 ML23093A0562023-04-0606 April 2023 Letter to Steve Minnick, Site Decommissioning Director, Re., Ongoing Activities Related to the Proposed License Amendment Request for Three Mile Island Nuclear Station, Unit 2 ML23094A2602023-04-0606 April 2023 Letter to William Tarrant, Seneca-Cayuga Nation, Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for TMI 2 ML23094A2392023-04-0606 April 2023 Letter to Courtney Gerzetich, Thpo, Onedia Nation of Wisconsin, Re., Initiation of Consultation Under Section 106 of the NHPA for the Proposed License Amendment Request for TMI 2 ML23093A0592023-04-0606 April 2023 Letter to Rebecca Countess, Chair, Re., Ongoing Activities Related to the Proposed License Amendment Request for Three Mile Island Nuclear Station, Unit 2 2024-02-05
[Table view] |
Text
AmerGenM AmerGen Energy Company, LLC Telephone: 717-948-8ooo An Exelon Company Three Mile Island Unit 1 Route 441 South, P.O. Box 480 Middletown, PA 17057 July 9, 2008 5928-08-20145 10 CFR 21 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (TMI-1)
OPERATING LICENSE NO. DPR-50 DOCKET NO. 50-289
SUBJECT:
10 CFR 21 NOTIFICATION - IDENTIFICATION OF DEFECT Issue Report 741412 Pursuant to 10 CFR 21.21(d)(3)(ii), AmerGen Energy Company LLC (AmerGen) is providing the required written notification of the identification of a defect. This information was initially reported to the NRC Operation Center on June 13, 2008. The NRC assigned event number 44295 and Part 21 2008-10-00 to this notification.
The attachment to this letter provides the information requested by 10CFR 21.21 (d)(4). There are no commitments contained in this letter or its attachment.
For additional information contact Adam Miller of TMI Unit 1 Regulatory Assurance at (717) 948-8128.
Sinceey William Noll Vice President TMI, Unit 1 WN/awm ATTACHMENT: Notification per 10 CFR 21.21 (d)(3)(ii) cc: TMI Senior Resident Inspector Administrator, Region I TMI-1 Senior Project Manager File No. 08043 i ii?
Attachment Notification per 10 CFR 21.21 (d)(3)(ii)
This notification follows the format of and addresses the considerations contained in 10 CFR 21.21 (d)(4)(i) - (viii).
(i) Name and address of the individual or individuals informing the Commission.
William Noll Vice President TMI, Unit 1 Route 441S P. O. Box 480 Middletown, PA 17057 (ii) Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the United States which fails to comply or contains a defect.
Facility:
AmerGen Energy Company LLC (AmerGen)
Three Mile Island Nuclear Station, Unit 1 Route 441 S P. O. Box 480 Middletown, PA 17057 Basic component which fails to comply or contains a defect:
Joslyn Clark Controls
- N/C (Normally Closed) open top contact assemblies
- Vendor Part Numbers:
- 1. KPM-44
- 2. KPM-46
- 3. KPM-6A
- 4. KPM-4A (iii) Identification of the firm constructing the facility or supplying the basic component which fails to comply or contains a defect.
These contact assemblies are commercial grade items dedicated by AmerGen.
Manufactured by: Joslyn Clark Controls Inc. (formerly AO Smith)
Page 1 of 5
(iv) Nature of the defect or failure to comply and the safety hazard which is created or could be created by such defect or failure to comply.
Nature of the defect:
The Joslyn Clark N/C (normally closed) contact assembly consists of a nylon contact carrier arm, a moving contactor that resides in the bottom of a slot in the contact carrier, and a spring that holds the moving contactor in place. These components are encased in a brown housing.
Contact Carrier Arm iI -Moving Contactor Moving contactor placed in slot of the contact carrier arm.
I contactor held in place by spring. Properly assembled contact in housing.
Page 2 of 5
When the nylon carrier is allowed to drop to the full down position as demonstrated below in the picture on the left, the moving contactor is parallel with the lip of the slot, and there is a potential for the moving contactor to become hung-up on the lip of the slot. The nylon carrier is allowed to drop to the full down position prior to installation, and when the magnet kit and coil have been removed from the relay. Once installed in a relay, the magnet kit/coil keep the contact in the reference position as shown in the picture on the right, and the moving contactor cannot become hung-up on the lip of the slot.
Actuator in extreme full down Actuator in installed down position (-5/32 inch from position (0.0 inches installed intAInedA rfmrenriT nnritinnI ~f~rfwPr nmwitinnI I
Kit moving contactor snown fung-up on Fully assembled relay with magnet kit the lip. Note the contact should be and coil.
closed in this state, but is not able to fully close due to being hung-up.
Page 3 of 5
Only the open top N/C contact assemblies are subject to this vulnerability, due to the difference in the size of a retaining ring between the closed top and open top assemblies. The larger ring utilized in the closed top contact assemblies prevents the nylon arm from dropping down. (A in the picture below) The smaller ring utilized in the open-top assemblies allows the nylon arm to drop down. (B in the picture below)
Safety hazard which could be created by such defect:
The potential for a N/C Joslyn Clark contact to become hung-up does result in a substantial safety hazard since it jeopardizes the capability to actuate emergency core cooling components that are utilized to mitigate the consequences of accidents that could result in potential offsite exposure.
(v) The date on which the information of such defect or failure to comply was obtained.
The technical evaluation that concluded that this defect constituted a Part 21 notification was approved on June 13, 2008.
(vi) In the case of a basic component which contains a defect or fails to comply, the number and location of all such components in use at, supplied for, or being supplied for one or more facilities or activities subject to the regulations in this part.
These specific contact assemblies were purchased as Commercial Grade Items and were dedicated by AmerGen for it's own use.
Page 4 of 5
(vii) The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action.
Corrective actions taken or planned:
- 1. The Commercial Grade Dedication (CGD) plans as well as the maintenance procedures have been enhanced to prevent a relay from being placed into service with an improperly configured contact. The CGD plans have been revised such that the contacts are verified to be configured correctly during receipt inspection.
Maintenance procedures have also been revised to ensure the contact configuration is correct after the relay is fully assembled and following maintenance involving magnet kit/coil replacement, contact replacement, or entire relay replacement. This type of maintenance creates a scenario where the contact carrier is allowed to drop down, which creates a potential for the moving contactor to get hung-up.
(viii) Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees.
None Page 5 of 5