Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- EPID:L-2017-LLA-0131 + (Audit Plan (LAR 17-021))
- ML18054A042 + (Audit Plan (Start Date No Later than 4/15/18) Related to License Amendment Request to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis)
- ML16291A448 + (Audit Plan - 11/2-3/2016 Regulatory Audit at Westinghouse Facility in Rockville to Support Amendment and Exemption Requests Related to Implementation of Next Generation Fuel (CAC MF8076-MF8081))
- ML24163A053 + (Audit Plan - Alternative Seismic Method LAR)
- ML16098A530 + (Audit Plan - Application for Amendment North Anna Power Station, Units 1 and 2. the Proposed License Amendment Revises the Issues Identified in Westinghouse Documents NSAL-09-5, Rev 1 and NSAL-15-1)
- ML20216A676 + (Audit Plan - Audit of EPRI for SGTF Information Related to TSTF-577, Revised Frequencies for Steam Generator Tube Inspections)
- ML23310A072 + (Audit Plan - Crystal River Unit 3 Nuclear Generating Plant LTP)
- ML23310A063 + (Audit Plan - Crystal River Unit 3 Nuclear Generating Plant LTP)
- ML113120500 + (Audit Plan - D.C. Cook Proposed Amendment to Convert Fire Protection Program to NFPA 805)
- ML18116A603 + (Audit Plan - Gale Replacement Methodology(Phase 2))
- ML083230070 + (Audit Plan - LaSalle County Station Request to Implement Ganged Control Rod Withdrawal Capability of the Rod Control Management System)
- ML19058A523 + (Audit Plan - Neutron Fluence Bioshield-Containment Final Rev 1)
- ML23067A300 + (Audit Plan - NuScale SDA Application Phase a Safety Review)
- ML23067A298 + (Audit Plan - NuScale SDA Application Request for Supplemental Information (Rsi))
- ML18348B076 + (Audit Plan - Nuscale Chapter 20 - RAI 9486)
- ML16131A798 + (Audit Plan - Proposed Risk-Informed Approach to Resolve Generic Letter 2004-02 for Vogtle Electric Generating Plant, Units 1 and 2)
- ML25140A019 + (Audit Plan - Rev 3 Supplement, BWRX-300 Containment Vessel and Reactor Building Structural Design Topical Report)
- ML101340684 + (Audit Plan - Technical Adequacy of the Oconee Nuclear Plants License Amendment Request for the Transition to 10 CFR 50.48 (C))
- ML18156A340 + (Audit Plan - Vogtle Electric Generating Plant, Units 3 and 4 (LAR 17-037))
- ML19364A157 + (Audit Plan - Vogtle Electric Generating Plant Units 3 and 4 (LAR 19-009))
- ML24270A019 + (Audit Plan Appendix A_Redacted)
- ML24088A319 + (Audit Plan Associated with Peach Bottom, Unit 1 - 10 CFR 50.82(a)(3) Alternate Decommissioning Schedule)
- ML23310A071 + (Audit Plan Cover Letter - Crystal River Unit 3 Nuclear Generating Plant LTP)
- ML14321A438 + (Audit Plan Email, 9/16-17/2014 Audit at University of New Mexico Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (TAC Nos. MF2400 Through MF2409))
- ML24222A393 + (Audit Plan Hermes Geologic Mapping Permit Condition)
- ML24222A276 + (Audit Plan Kairos Core Design TR)
- ML26037A161 + (Audit Plan Letter - Terra Innovatum Topical Report SOLO-TR-2025-1, Solo Micro Modular Nuclear Reactor Principal Design Criteria)
- ML20281A189 + (Audit Plan Letter for Errata to Framatome TR ANP-10297 Rev. 0 - Supplement 1P-A - Arcadia)
- ML23223A040 + (Audit Plan License Amendment Request for Revision of the Emergency Plan to Support Relocation of the Technical Support Center)
- ML19338C690 + (Audit Plan License Amendment Request for Small Break Loss of Coolant Accident Methodology (Epids L-2018-LLA-0195 and L-2018-LLA-0215))
- ML19165A017 + (Audit Plan License Amendment Request for Flood Protection Dike Modification)
- ML23152A043 + (Audit Plan License Amendment Requests to Change Emergency Plan Staff Augmentation Times)
- ML18067A129 + (Audit Plan NuScale Chapter 4)
- ML23178A068 + (Audit Plan Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 & 3 Systems Section XI, Division 1)
- ML17277A489 + (Audit Plan Re Systematic Risk-Informed Assessment of Debris Technical Report)
- ML16091A454 + (Audit Plan Regarding Application for License Amendment, Issues Identified in Westinghouse Documents NSAL-09-05, REV1 and NSAL-15-1)
- ML17319A325 + (Audit Plan Regarding Incorporate Seismic Probabilistic Risk Assessment Into the 10 CFR 50.69 Categorization Process (CAC Nos. MF9861 and MF9862; EPID L-2017-LLA-0248))
- ML20217L346 + (Audit Plan Regarding License Amendment Request to Implement Riskinformed Extended Completion Times (L-2020-LLA-0120))
- ML20037A065 + (Audit Plan Regarding License Amendment Request Regarding Risk Informed Categorization and Treatment of Structures, Systems and Components (L-2019-LLA-0290))
- ML20037B654 + (Audit Plan Regarding License Amendment Request to Implement Risk-Informed Extended Completion Times 50-410 (L-2019-LLA-0234))
- ML11181A019 + (Audit Plan Regarding the Areva Fuel Transition Emergency Core Cooling System Evaluation Model Application)
- ML25223A219 + (Audit Plan Related to the Review of Browns Ferry Nuclear Plant, Units 1, 2, and 3, Hydrology LAR)
- ML24088A318 + (Audit Plan Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations (EPID L- 2023-LLN-0004))
- ML20141L623 + (Audit Plan Requested Licensing Action for Technical Specifications Task Force (TSTF) Traveler TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF (Risk-Informed TSTF) Initiative 4B)
- ML20094J156 + (Audit Plan Supplement in Support of Review of License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times)
- ML20094K422 + (Audit Plan Supplement in Support of Review of License Amendment Request Regarding Risk-Informed Categorization and Treatment of Structures, Systems, and Components)
- ML20175A575 + (Audit Plan Supplement in Support of Review of License Amendment Request to Revise TS to Adopt TS Task Force Traveler Tstf-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF (Risk-Informed TSTF) Initiative 4)
- ML21263A248 + (Audit Plan Supporting LAR Request to Implement Alternate Defense-in-Depth, Pressure Boundary, & Seismic Tier 1 Categorization Process in Accordance with Requirements of 10 CFR 50.69)
- ML23094A183 + (Audit Plan TSTF-505, Rev. 2, RITSTF Initiative 4B & 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors (EPIDs L-2023-LLA-0021 & L-2023-LLA-0022))
- ML091480673 + (Audit Plan Table)
- ML25156A239 + (Audit Plan and Audit Topics Transmittal E-Mail)