May 21, 2025 MEMORANDUM TO:
Michelle W. Hayes, Chief Licensing and Regulatory Infrastructure Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation FROM:
Jordan D. Glisan, Project Manager
/RA/
Licensing and Regulatory Infrastructure Branch Division of New and Renewed Licenses Office of Nuclear Reactor Regulation
SUBJECT:
AUDIT PLAN FOR THE REGULATORY AUDIT OF GEH TOPICAL REPORT, BWRX-300 STEEL-PLATE COMPOSITE CONTAINMENT VESSEL AND REACTOR BUILDING STRUCTURAL DESIGN By letter dated December 2, 2024, GE-Hitachi Nuclear Energy Americas, LLC (GEH) submitted Topical Report (TR) NEDC-33926P/NEDO-33926, Revision 3, BWRX-300 Steel-Plate Composite Containment Vessel (SCCV) and Reactor Building (RB) Structural Design, TR (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24338A174). On March 21, 2025, GEH submitted supplemental information to clarify statements added in Revision 3 (ML25081A003). The U.S. Nuclear Regulatory Commission (NRC) staff has identified a need to audit the information in this supplement.
This audit will be conducted in accordance with the guidance provided in the Office Instruction LIC 111, Regulatory Audits, (ML19226A274). However, the NRC staff have decided to forgo the entrance meeting.
This will be a virtual audit consisting of using an on-line portal. The audit will begin on May 19, 2025. The audit exit will be held approximately 4 weeks after the start of the audit. The contents of the audit plan are provided as an enclosure.
Docket No. 99900003
- Audit Plan : Proprietary Audit Plan Information and Other Material Necessary for the Regulatory Audit CONTACT:
Jordan Glisan, NRR/DNRL 301-415-3478
Pkg: ML25140A001 Memo: ML25140A019 Encl: ML25140A018 (PROP)
- via email NRR-106 OFFICE DNRL/NLIB:PM DNRL/NLIB:LA DNRL/NLIB: BC DNRL/NLIB:PM NAME JGlisan*
SGreen*
MHayes*
JGlisan*
DATE 05/19/2025 05/20/2025 05/21/2025 05/21/2025 UNITED STATES NUCLEAR REGULATORY COMMISSION AUDIT PLAN FOR THE GEH TOPICAL REPORT, BWRX-300 STEEL-PLATE COMPOSITE CONTAINMENT VESSEL AND REACTOR BUILDING STRUCTURAL DESIGN (EPID: L-2023-TOP-0014)
Docket No. 99900003 AUDIT PLAN APPLICANT: General Electric-Hitachi (GEH)
CONTACTS: Bruce Bennett DURATION:
May 19, 2025 - June 13, 2025 (Approximate Audit Exit)
AUDIT TEAM: George Thomas, Technical Reviewer (NRR)
Jordan Glisan, Project Manager (NRR)
Patrick Koch, Technical Reviewer (NRR)
Additional audit team members may be added as needed.
I.
BACKGROUND AND AUDIT BASIS By letter dated December 2, 2024, GE-Hitachi Nuclear Energy Americas, LLC (GEH) submitted Topical Report (TR) NEDC-33926P/NEDO-33926, Revision 3, BWRX-300 Steel-Plate Composite Containment Vessel (SCCV) and Reactor Building (RB) Structural Design, TR (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24338A174). On March 21, 2025, GEH submitted supplemental information to clarify statements added in Revision 3 (ML25081A003). The NRC staff has identified a need to audit the information in this supplement.
This audit will be conducted in accordance with the guidance provided in the Office Instruction LIC 111, Regulatory Audits, (ML19226A274). However, the NRC staff have decided to forgo the entrance meeting.
II.
OBJECTIVES The NRC staff will seek clarification, gain understanding, and verify information related to the subject TR and the supplement. The audit will identify any information needed to support a regulatory finding so it can be placed on the docket. Additionally, review and discussion of the audit material will help in identifying any subsequent requests for additional information.
III.
REGULATORY AUDIT SCOPE Audit topics include the initial information needs described in proprietary Enclosure 2 and any additional information needs raised during the audit.
2 IV.
SPECIAL REQUESTS The NRC staff requests that GEH provide subject matter expert(s), if necessary, to discuss the details of the audit material.
V.
LOGISTICS AND DELIVERABLES Audit Start:
May 19, 2025 Exit Meeting:
Approximately 4 weeks later The audit team will examine supporting documentation provided by GEH in the on-line portal, Certrec and will hold audit calls and/or meetings with GEH as necessary to understand audit material. The team will inform GEH via email of any emerging information needs.
An audit report will be issued within 90 days following the exit meeting. The NRC point of contact for this audit is Jordan Glisan at Jordan.Glisan@nrc.gov.