Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP 13-0010, Attachment 1: Requested Drawings + (Attachment 1: Requested Drawings)
- ML19248C132 + (Attachment 1: Response to NRC Evaluation of Er RAIs (Non-Proprietary))
- ML19056A191 + (Attachment 1: Response to Request for Additional Information - Exemption from the Requirements of 10 CFR 50.47 and Appendix E to 10 CFR Part 50, Entergy Nuclear Operations, Inc)
- ML19051A137 + (Attachment 1: Response to Request for Additional Information)
- ML19108A061 + (Attachment 1: Response to Request for Supplemental Information on HI-STORM FW Amendment 5)
- ML20229A003 + (Attachment 1: Responses to RAIs on HI-STORM 100 Amendment 15)
- ML18150A330 + (Attachment 1: Responses to Requests for Additional Information on Safety Analysis Report (Sar), Chapter 2, Site Characteristics)
- ML20260H141 + (Attachment 1: Responses to Requests for Additional Information)
- ML19081A075 + (Attachment 1: Responses to Requests for Additional Information)
- ML23053A094 + (Attachment 1: Responses to the University of Illinois at Urbana-Champaign - Request for Additional Information Regarding Quality Assurance Program Description (EPID No. L-2022-NFN-0004), Dated January 27, 2023)
- ML21077A205 + (Attachment 1: Revised Emergency Plan Implementing Procedure)
- ML25032A025 + (Attachment 1: Seven Reasons Why New Nuclear Energy Is an Opportunity Cost That Damages Efforts to Address Climate Change and Air Pollution)
- ML18235A135 + (Attachment 1: Staff Feedback on NuScale Response to RAIs 9394, 9399, 9415)
- ML17283A153 + (Attachment 1: Summary and Analysis of the GGNS Emergency Plan Changes, Revision 76)
- ML23227A250 + (Attachment 1: Summary of Clarification Call Action Items (non-proprietary))
- ML18360A469 + (Attachment 1: Summary of Exelon Position)
- ML25093A237 + (Attachment 1: Summary of Proposed Changes (Sopc) for HI-STAR 100MB LAR 9378-3 (Non-Proprietary))
- ML21211A610 + (Attachment 1: Summary of Proposed Changes for Amendment Request 1032-8)
- ML18331A043 + (Attachment 1: Summary of Proposed Changes for HI-STORM 100 LAR 1014-14)
- ML23075A069 + (Attachment 1: Supplemental RAI Responses on HI-STORM Umax Amendment 3)
- ML12352A343 + (Attachment 1: Transmittal Letter of Consistency Certification Pursuant to the Coastal Zone Management Act Indian Point Nuclear Generating Unit Nos. 2 & 3)
- ML17356A178 + (Attachment 1: WCAP-18265-NP, Rev. 0, Aging Management Program and Inspection Plan for the McGuire Nuclear Station Units 1 & 2 Reactor Vessel Internals)
- ML18053A165 + (Attachment 1A - Braidwood Station Units 1 & 2 - Mark-up Emergency Plan EP-AA-1000 Pages)
- ML18053A166 + (Attachment 1B - Braidwood Station Units 1 & 2 - Clean Emergency Plan EP-AA-1000 Pages)
- ML13037A380 + (Attachment 1b, 2012 Annual Report of the CENG Independent Nuclear Advisory Committee)
- ML121010552 + (Attachment 2)
- ML032060541 + (Attachment 2 (Handouts) to 07/24/03 Meeting with Pacific Gas and Electric Company Regarding a Proposed Independent Spent Fuel Storage Installation at Humboldt Bay 72-27 (TAC L23589))
- ML24018A201 + (Attachment 2 (Non-Proprietary): HI-2200343-A, Topical Report for Allowance of Heat Load Patterns in HI-Storm 100 and HI-Storm FW Systems)
- ML24002B140 + (Attachment 2 (Redacted) - Email Dated 12/1/23 Dbussmann (Gns) to Ngarcia (Nrc), Applicants Proprietary Review of Staggered RAIs Castor geo69 Storage Application - Structural Evaluation)
- ML18141A891 + (Attachment 2 (Safety Features of the NuScale Design) to Intervenors Motion for Leave to File Contentions 4 and 5)
- ML023110231 + (Attachment 2 - 11/06/02 Memo to C.L. Miller Frm. M.J. Ross-Lee Summary of the August 21, 2002, Meeting Between the Nuclear Regulatory Commission Staff and Dominion Virginia Power)
- ML14128A041 + (Attachment 2 - 2013 Radioactive Effluent Release Report - Volume 2)
- ML15169A009 + (Attachment 2 - 60-Day Interim Report Notification Information Per 21.21(a)(2))
- ML15237A323 + (Attachment 2 - A.15-02-023 Prepared Testimony of Sam Blakeslee)
- ML20303A258 + (Attachment 2 - Affidavit)
- ML23005A275 + (Attachment 2 - Affidavit of Kimberly Manzione)
- ML051370152 + (Attachment 2 - Agenda -Public Meeting Summary on FAQ Appeal Meeting May 12, 2005)
- ML17143A012 + (Attachment 2 - Annual Radiological Environmental Operating Report: January 1, 2016 - December 31, 2016)
- ML042800122 + (Attachment 2 - Appendix a to Topical Report DOM-NAF-2, Qualification of the F-ANP Bwu CHF Correlations in the Dominion VIPRE-D Computer Code)
- ML13232A217 + (Attachment 2 - Areva Document No. ANP-3102, Revision 3,Three-Mile Island Unit 1 Appendix G Pressure-Temperature Limits at 50.2 EFPY with MUR, Revision 3, Dated July 2013)
- ML22098A151 + (Attachment 2 - BWRVIP-321-A Proposed Changes-Appendix F, Alternate Sslr Surveillance Capsule Withdrawal Schedule)
- ML22091A206 + (Attachment 2 - BWRVIP-321-A Proposed Changes - Appendix F (Np) - Alternate Sslr Surveillance Capsule Withdrawal Schedule)
- ML20184A012 + (Attachment 2 - Basis Augmented Observation Checklist)
- ML22269A404 + (Attachment 2 - Byron Station-Development of Evacuation Time Estimates)
- ML092460595 + (Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 1 of 2)
- ML092460596 + (Attachment 2 - CDI Report 09-26NP, Revision 0, (Non-Proprietary) Stress Assessment of Nine Mile Point, Unit 2 Steam Dryer at CLTP and EPU Conditions, Part 2 of 2)
- ML063110167 + (Attachment 2 - CDI Technical Memo 06-23P (Non-Proprietary) Comparison of Hope Creek and Quad Cities Steam Dryer Loads at EPU Conditions, Revision 0, Dated September 2006)
- ML14357A348 + (Attachment 2 - Calculation 2013-02413, Revision 0, Soil-Structure Interaction Analysis of Shine Medical Isotope Production Facility for Design Seismic Event)
- RS-21-023, Attachment 2 - Calculation DRE20-0008, Rev. 0, Zirconium Fire Analysis for Drained Spent Fuel Pool + (Attachment 2 - Calculation DRE20-0008, Rev. 0, Zirconium Fire Analysis for Drained Spent Fuel Pool)
- ML19325D673 + (Attachment 2 - Callaway Energy Center Seismic Probabilistic Risk Assessment in Response to 50.54(F) Letter with Regard to NTTF 2.1 Seismic - Supplemental Information)
- ML19225D324 + (Attachment 2 - Callaway Energy Center Seismic Probabilistic Risk Assessment in Response to 10 CFR 50.54(1) Letter with Regard to NTTF 2.1: Seismic)