Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML21069A345 + (3-9-21 Order (DC Cir.)(Case No. 21-1037)(Consolidated 21-1084))
- ML25195A128 + (3-Amir Bahadori-Presentation to NRC Public Meeting on EO 14300 16 July 2025)
- ML24205A018 + (3-Base: Isolation/Observations - Final Stakeholder Meeting, 07-24-24)
- ML23173A089 + (3-CGS-2023-02 Draft Written Exam)
- ML20241A243 + (3-CN-2020-04-Draft Written Exam)
- ML17081A539 + (3-COLUMBIA-2017-02 Draft Written Exam)
- ML20276A154 + (3-CW-2020-08 Draft Written Exam)
- ML091040726 + (3-D Drywell Analysis - Independent Review Findings)
- ML20136A690 + (3-D Response Spectrum Analysis & Verification of Multimode Response Multiplier Equal to 1.25)
- NL-11-065, 3-ECA-0.0, Rev. 5, Loss of All AC Power + (3-ECA-0.0, Rev. 5, Loss of All AC Power)
- NLS2019040, 3-EN-DC-147, Rev. 5C1, Cooper Nuclear Station Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (Efpy). (Non-proprietary) + (3-EN-DC-147, Rev. 5C1, Cooper Nuclear Station Pressure and Temperature Limits Report (PTLR) for 54 Effective Full-Power Years (Efpy). (Non-proprietary))
- ML081210102 + (3-PT-CS032A, Rev. 11, Flow Test SW Header Check Valves and Flow Test of Underground Portions of (Service Water) Line 409)
- ML23143A204 + (3-PV-2023-05 Draft Written Exam)
- ML071150214 + (3-Part E-Mail Between R. Pedersen, Dpopm, to M. Shannon, Rii, Subject: Action: Review DPO-2006-003 Report)
- ML18239A238 + (3-RBS 2018-07 Written Exam (Draft))
- ML21265A507 + (3-STP-2021-07 Draft Written Exam)
- ML20007E844 + (3-WC-2019-12 Draft Written Exam)
- ML20266E488 + (3-inch Nuclear Diaphragm Valve H.W.O)
- ML25246A730 + (3. Attachment 3 - Subcritical Systems - Energy Amplifier White Paper)
- ML25002A191 + (3. CoC 1014 Renewed Amendment No. 19 Appendix B)
- ML24164A262 + (3. Design Analysis and Calculation ASME Code Subsections Nb and Wb Stress Analysis for ES-3100 Containment Vessel)
- ML21265A308 + (3. Email Response to Requests for Additional Information)
- ML25181A195 + (3. Enclosure 2 - Amendment 1 to SNM-2013 (Public - Redacted))
- ML090860789 + (3. FEMA Response to NRC Regarding Farley TARs Seven Question, FEMA Memo from Burnside, January 16, 2009)
- ML23250A326 + (3. Final CoC 1031 Amendment 0 Revision 2, TS Appendix a)
- ML24324A365 + (3. Final CoC 1031 Amendment 13 TS Appendix a)
- ML25042A641 + (3. Final CoC 1031 Amendment 14 TS Appendix a)
- ML25211A338 + (3. Final Safety Evaluation Report or CoC No. 1042, Amendment No.4 for the NUHOMS Eos System)
- ML21308A608 + (3. Non-Proprietary Slide Presentation from 10-22-21 pre-application Meeting (Public))
- ML25231A256 + (3. Preliminary Safety Evaluation Report for Certificate of Compliance No. 1042, Amd 5)
- ML23030B794 + (3. Proposed Certificate of Compliance No. 1032, Amendment 7, Appendix a)
- ML24312A181 + (3. Proposed CoC 1014 Amendment No. 19 Appendix B)
- ML22220A152 + (3. Proposed CoC 1031 Amendment 0 Revision 2 TS Appendix a)
- ML24075A117 + (3. Proposed CoC 1031 Amendment 13 TS Appendix B)
- ML24211A241 + (3. Proposed CoC 1031 Amendment 14 TS Appendix a)
- ML24340A133 + (3. Proposed CoC 1031 Amendment 15 Technical Specifications Appendix B)
- ML24179A264 + (3. Proposed CoC No. 1040, Amendment No. 0, Revision 1, Appendix a)
- ML21174A127 + (3. Proposed Renewed CoC 1027 Amendment 1)
- ML24242A049 + (3. Proposed Renewed CoC No. 1025 Amendment No. 6 Revision 1, Appendices a and B)
- ML21125A106 + (3. Proposed TS - CoC No. 1042 Amendment 2)
- ML22354A266 + (3. Proposed Technical Specifications Appendix a for CoC No. 1026, Renewed Amendment No. 0)
- ML23068A387 + (3. Renewed Certificate of Compliance No. 1014, Amendment No. 0, Appendix a)
- ML21316A195 + (3. Technical Specifications (Appendix B) for CoC No. 1008, Renewed Amendment No. 0)
- ML102880487 + (3.1 Inadequate Air Content)
- ML12065A169 + (3.1 Reactivity Control Systems)
- ML12065A174 + (3.1 Reactivity Control Systems, 3.1.5 Shutdown Bank Insertion Levels)
- ML12065A173 + (3.1 Reactivity Control Systems, 3.1.6 Control Bank Insertion Limits, LCO 3.1.6)
- ML18019A103 + (3.1.3.2 Acoustic Monitoring of Bats on the Orr 2015 (Draft))
- TSTF-331 + (3.1.5 Bases Change)
- ML040640752 + (3.1.5 Fire Zones, Appendix R Questions & Answers)
- TSTF-158 + (3.1.5 Safety Rod Insertion Limits, Required Action A.1 Deletion)