Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML11363A074 + (10 CFR 50.55a Request ISI-05: Proposed Alternative Bottom Mounted Instrument Examinations)
- ML12151A405 + (10 CFR 50.55a Request ISI-07 and ISI-08: Proposed Alternative Reactor Vessel Closure Head Penetration Nozzle Examinations for the Fifth Interval Inservice Inspection (ISI) Program)
- L-MT-05-087, 10 CFR 50.55a Request No. 12: Proposed Alternative for Visual Examination Illumination Levels in Accordance with 10 CFR 50.55a(a)(3)(i) + (10 CFR 50.55a Request No. 12: Proposed Alternative for Visual Examination Illumination Levels in Accordance with 10 CFR 50.55a(a)(3)(i))
- L-MT-05-088, 10 CFR 50.55a Request No. 13: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval + (10 CFR 50.55a Request No. 13: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval)
- L-MT-10-015, 10 CFR 50.55a Request No. 16: Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations + (10 CFR 50.55a Request No. 16: Alternative to Nozzle-to-Vessel Weld and Inner Radius Examinations)
- L-MT-12-041, 10 CFR 50.55a Request No. 20: Alternative to Repair of the Residual Heat Removal Service Water Pump No. 11 Stuffing Box Through-Wall Defect + (10 CFR 50.55a Request No. 20: Alternative to Repair of the Residual Heat Removal Service Water Pump No. 11 Stuffing Box Through-Wall Defect)
- L-MT-13-089, 10 CFR 50.55a Request No. 21: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval + (10 CFR 50.55a Request No. 21: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval)
- L-MT-15-083, 10 CFR 50.55a Request No. RR-010: Request for Approval of an Alternative to Apply the BWRVIP Guidelines in Lieu of Specific ASME Section XI Code Requirements for Reactor Pressure Vessel Internals and Components Inspection + (10 CFR 50.55a Request No. RR-010: Request for Approval of an Alternative to Apply the BWRVIP Guidelines in Lieu of Specific ASME Section XI Code Requirements for Reactor Pressure Vessel Internals and Components Inspection)
- L-MT-20-031, 10 CFR 50.55a Request No. RR-018, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI + (10 CFR 50.55a Request No. RR-018, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
- EPID:L-2020-LLR-0151 + (10 CFR 50.55a Request No. RR-018, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
- NLS2016076, 10 CFR 50.55a Request No. RR5-02 for Fifth Ten-Year Inservice Inspection Interval + (10 CFR 50.55a Request No. RR5-02 for Fifth Ten-Year Inservice Inspection Interval)
- ML14212A071 + (10 CFR 50.55a Request No. Vr 05: Proposed Alternative to Lnservice Testing Requirements Pursuant to 10 CFR 50.55a(a)(3)(ii))
- L-20-117, 10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections + (10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections)
- EPID:L-2020-LLR-0050 + (10 CFR 50.55a Request Number 2-TYP-4-RV-06, Hardship for Hot Leg Nozzle Inspections)
- L-13-331, 10 CFR 50.55a Request Number BV1-IWE-2-3 + (10 CFR 50.55a Request Number BV1-IWE-2-3)
- ET 23-0005, 10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peen + (10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened)
- EPID:L-2023-LLR-0010 + (10 CFR 50.55a Request Number I4R-08 for the Fourth Inservice Inspection Program Interval, Relief for Extension of Follow Up Examination Requirements for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened)
- L-08-350, 10 CFR 50.55a Request Number PR-3, Inservice Testing Program + (10 CFR 50.55a Request Number PR-3, Inservice Testing Program)
- NLS2009060, 10 CFR 50.55a Request Number RI-06, Revision 0 + (10 CFR 50.55a Request Number RI-06, Revision 0)
- NLS2012001, 10 CFR 50.55a Request Number RI-07, Revision 0 + (10 CFR 50.55a Request Number RI-07, Revision 0)
- NLS2009006, 10 CFR 50.55a Request Number RI-21, Revision 0, and Request Number RI-22, Revision 0 + (10 CFR 50.55a Request Number RI-21, Revision 0, and Request Number RI-22, Revision 0)
- NLS2017032, 10 CFR 50.55a Request Number RI-21, Revision 1 + (10 CFR 50.55a Request Number RI-21, Revision 1)
- NLS2008012, 10 CFR 50.55a Request Number RI-35, Revision 0 + (10 CFR 50.55a Request Number RI-35, Revision 0)
- NLS2006020, 10 CFR 50.55a Request Number RI-37, Revision 0 + (10 CFR 50.55a Request Number RI-37, Revision 0)
- ML102300641 + (10 CFR 50.55a Request Number RR-12, Request for Relief from Code Case N-722 Visual Examination of the Reactor Vessel Hot Leg Nozzle to Safe End Dissimilar Metal Welds)
- ML21055A881 + (10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension, RAI-EMIB-08 Supplement)
- EPID:L-2021-LLR-0005 + (10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension)
- ML21018A004 + (10 CFR 50.55a Request Number SR-2, Revision 0, Snubber Testing Extension)
- L-21-280, 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements + (10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements)
- EPID:L-2022-LLR-0005 + (10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements)
- L-21-045, 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension + (10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension)
- EPID:L-2021-LLR-0010 + (10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension)
- L-21-054, 10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension + (10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension)
- EPID:L-2021-LLR-0009 + (10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension)
- L-09-078, 10 CFR 50.55a Request Numbers 1-TYP-4-B3.120-1 and 2-TYP-3-C6.10-1, and Beaver Valley Power Station Inservice Inspection Plans + (10 CFR 50.55a Request Numbers 1-TYP-4-B3.120-1 and 2-TYP-3-C6.10-1, and Beaver Valley Power Station Inservice Inspection Plans)
- L-21-047, 10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension + (10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension)
- EPID:L-2021-LLR-0007 + (10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension)
- L-19-146, 10 CFR 50.55a Request PR-3, Standby Liquid Control Pump Periodic Verification Test + (10 CFR 50.55a Request PR-3, Standby Liquid Control Pump Periodic Verification Test)
- L-MT-18-023, 10 CFR 50.55a Request RR-012: Inservice Inspection Impracticality in Accordance with 10 CFR 50 .55a(g)(5)(iii) During the Fifth Ten-Year Interval + (10 CFR 50.55a Request RR-012: Inservice Inspection Impracticality in Accordance with 10 CFR 50 .55a(g)(5)(iii) During the Fifth Ten-Year Interval)
- L-MT-24-001, 10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval + (10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval)
- EPID:L-2024-LLR-0014 + (10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval)
- NL-08-053, 10 CFR 50.55a Request RR-CRV-75 - Relief from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third-Ten Year Inservice Inspection Interval Closeout + (10 CFR 50.55a Request RR-CRV-75 - Relief from Examinations of Component Welds with Less than Essentially 100% Examination Coverage for Third-Ten Year Inservice Inspection Interval Closeout)
- NL-09-008, 10 CFR 50.55a Request RR-CRV-75 - Withdrawal of Part B, Examination Category B-D, Item B3.120, Full Penetration Welded Nozzles in PRZN-1 (Pressurizer Spray) and PRZN-6 (Surge) Nozzles + (10 CFR 50.55a Request RR-CRV-75 - Withdrawal of Part B, Examination Category B-D, Item B3.120, Full Penetration Welded Nozzles in PRZN-1 (Pressurizer Spray) and PRZN-6 (Surge) Nozzles)
- L-13-101, 10 CFR 50.55a Request RR-E 1, Proposed Alternative Regarding Post-Repair Pressure Testing Requirements + (10 CFR 50.55a Request RR-E 1, Proposed Alternative Regarding Post-Repair Pressure Testing Requirements)
- ML032250652 + (10 CFR 50.55a Request RV-3 Regarding American Society of Mechanical Engineers Code for Operation and Maintenance (OM) of Nuclear Power Plants Inservice Testing Requirement at the Davis-Besse Nuclear Power Station, Unit 1)
- ML071870412 + (10 CFR 50.55a Request Regarding 48-Hour Hold Following J-Groove Nozzle Weld Repairs - Third Ten-Year Interval (RR-A31))
- ML071840039 + (10 CFR 50.55a Request Regarding Installation of Structural Weld Overlays Third Ten-Year Interval (RR-A30))
- L-11-346, 10 CFR 50.55a Request Regarding Motor Operated Valve Testing + (10 CFR 50.55a Request Regarding Motor Operated Valve Testing)
- L-11-287, 10 CFR 50.55a Request VR-1, Revision 1, Align Valve Testing Frequencies to NUREG-1482 Provision + (10 CFR 50.55a Request VR-1, Revision 1, Align Valve Testing Frequencies to NUREG-1482 Provision)
- L-11-020, 10 CFR 50.55a Request VRR3 Regarding Solenoid Operated Valve Remote Position Verification Frequency + (10 CFR 50.55a Request VRR3 Regarding Solenoid Operated Valve Remote Position Verification Frequency)
- L-17-308, 10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2) + (10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2))
- EPID:L-2017-LLR-0130 + (10 CFR 50.55a Request for Alternate Reactor Vessel Nozzle Flaw Depth Sizing Criteria (Request 2-TYP-4-RVSE-2))