Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24305A155 + (1) Integrated Schedule of Regulatory Activities - November 2024)
- ML19080A186 + (1) Letter to Hobbs, Crystal River Unit 3 Issuance of Amendment Approving ISFSI-Only Emergency Plan Revision 1)
- ML20084L823 + (1) Mcg 2020-301 Final RO Written Exam - Delay Release 2) Mcg 2019-301 Final SRO Written Exam - Delay Release)
- ML21313A120 + (1) NRC Public Meeting with Representatives of the Nuclear Industry to Discuss Approaches Tornado Hazards During ISFSI Short-Term Operations Presentation Slides)
- ML25085A095 + (1) NRC Response on Orano Enrichment USA, LLC Request for Exemption from 10 CFR 51.60(a) - Letter)
- ML050750263 + (1) TS Page - Diablo Canyon, Correction to Page Issued in Amendment Nos 179 and 181, Respectively)
- ML20083H186 + (1) Wma_C_Performance Assessment presentation_June_2014_STOMP_modeling)
- Regulatory Guide 1.85 + (1, (Draft Was Issued as DG-1049), Materials Code Case Acceptability ASME Section III, Division 1)
- SVPLTR 15-0056, 1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report + (1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report)
- ML18184A434 + (1, 2, 3, and ISFSI 10 CFR 50.59, 10 Crf 72.48 Change Report for 2017, and Commitment Change Report for 2017)
- RA-21-0063, 1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan + (1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan)
- EPID:L-2020-LLA-0198 + (1, 2; Catawba Nuclear Station 1, 2; H. B. Robinson Steam Electric Plant 2; Mcgguire Nuclear Station 1, 2; Oconee Nuclear Station 1, 2, 3; Shearon Harris Nuclear Power Plant 1 - Response to RAI Re Amend for Emergency Plan)
- ML13206A048 + (1, Acceptance Letter Regarding License Amendment Request 13-03, Application for Technical Specification Change Regarding Risk-Informed Justifications for Relocation of Specific Frequency Requirements to a Licensee Controlled)
- ML031920233 + (1, EP-PS-355, Media/Public Officials Contact: Emergency Plan-Position Specific Instruction)
- ML22007A317 + (1, River Bend Station 1, and Waterford Steam Electric Station 3 - Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI)
- ML031920253 + (1, to EP-PS-207, Site Support Manager: Emergency Plan-Position Specific Procedure)
- ML20107K926 + (1,Confirmation of Design Adequacy for Jet Impingement Effects)
- ML20066F954 + (1,Cycle 9,Pattern R8 Core Surveillance Rept)
- ML17056A274 + (1,Restart Readiness Rept)
- ML20084E322 + (1,Safety & Relief Valve Piping Design Rept)
- NOC-AE-000008, 1,Unauthorized Entry Into Protected Area,Safeguards Event Report + (1,Unauthorized Entry Into Protected Area,Safeguards Event Report)
- ML24043A119 + (1- Impacts on RG 1.183 for Workshop2)
- ML21208A212 + (1-0-Agenda - Subsurface Surveys Workshop July 2021)
- ML25042A011 + (1-08-2025 Appendix a - List of Public Meeting Participants)
- ML25042A010 + (1-08-2025 Part 53 Proposed Rule Public Meeting Summary)
- 05000298/LER-1980-005-03, 1-0:on 800116,during Normal Operation,Two through-wall Cracks in Welds in Radiant Energy Conversion North Critical Loop Discovered.Caused by Intergranular Stress Corrosion.Welds Will Be Replaced + (1-0:on 800116,during Normal Operation,Two through-wall Cracks in Welds in Radiant Energy Conversion North Critical Loop Discovered.Caused by Intergranular Stress Corrosion.Welds Will Be Replaced)
- 05000255/FIN-2007007-06 + (1-1 EDG Fuel Header Leak)
- 05000255/FIN-2008003-06 + (1-1 EDG Fuel Header Leak)
- ML14357A323 + (1-1, Update to Emergency Plan)
- ML21208A213 + (1-1-NRC Overview Presentation: Subsurface Surveys Workshop)
- ML22019A214 + (1-10-22 Order (10th Cir.)(Case No. 21-9593))
- ML19077A322 + (1-11 Preparation for Advanced Reactors Environmental Reviews Including Integration of NEPA Processes Presentation ACC-1)
- ML22019A219 + (1-11-22 Order (DC Cir.)(Case No. 21-1048))
- ML24022A234 + (1-12-2024 Pennsylvania Impep Questionnaire)
- ML21013A323 + (1-12-21 Clerks Text Order Denying Intervenors Motion for Judicial Notice (9th Cir.) (Case No. 20-70899))
- ML25013A329 + (1-13-2025 Email to Petitioner on the Status of the Petition for Rulemaking, Returning a Decommissioning Plant to Operating Status (PRM-50-125))
- ML23018A180 + (1-13-23 Status Report (DC Cir.)(Case No. 20-1187))
- ML20014E672 + (1-14-20 Email Acceptance for Review of Westinghouse Electric Company Topical Report WCAP-18443-P/WCAP-18443-NP, Revision 0, Qualification of the Two-Dimensional Transport Code Paragon2)
- ML26021A021 + (1-15-2026 Ltr from E. Johnson Sc SHPO - Concurrence with the Draft SEIS and Section 106 Findings for H.B. Robinson SLR Review)
- ML21015A420 + (1-15-21 Memo to J Lubinski, Et Al Re Consolidated NRC Review Scheduling and Questionnaire1)
- ML19018A108 + (1-17-19-With Damaris Signature Block - Welcome Letter to Indiana - Kaci Studer - New State Liaison Officer Letter (003))
- ML20024D672 + (1-17-20, Amicus Brief of Ny Opposing Motion to Dismiss (DC Cir.)(Case No. 19-1198))
- ML20024D682 + (1-17-20, Motion of Ny for Leave to File Amicus Motion Opposing Motion to Dismiss (DC Cir.)(Case No. 19-1198))
- ML23018A184 + (1-17-23 Per Curiam Order Denying Petition for Rehearing En Banc (DC Cir.)(Case No. 21-1162))
- ML22019A224 + (1-18-22 Joint Stipulation and Motion (10th Cir.)(Case No. 21-9593))
- ML22019A230 + (1-18-22 Scheduling Order (10th Cir.)(Case 21-9593))
- 05000348/FIN-2009005-03 + (1-2 R Load Center Inoperability)
- ML24320A001 + (1-2-2024 Email from R Rogers Re Mississippi Program Improvement Plan Update to the 12-14-2023)
- ML24008A076 + (1-2-2024 Email from R Rogers Re Mississippi Program Improvement Plan)
- ML24008A079 + (1-2-2024 Mississippi Program Improvement Plan)
- ML21208A214 + (1-2-Overview of Guidance on Surveys for Subsurface Radiological Contamination)
- ML22024A201 + (1-20-2022 Email from J. Saxton to J. Lux, Jp Davis, J. Smith Groundwater and Surface Water Elevations)