Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML23219A134 + ((Cpnpp), Technical Specifications, Bases Change, Revision 85)
- CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112 + ((Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112)
- CP-202500248, (Cpnpp), Transmittal of Licensed Operator Examination Materials + ((Cpnpp), Transmittal of Licensed Operator Examination Materials)
- CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48) + ((Cpnpp), Transmittal of Revised Emergency Plan (Revision 48))
- CP-201800659, (Cpnpp), Unit 1 - Response to Request for Additional Information Regarding Exigent License Amendment Request (LAR) 18-001, Revision to Technical Specification 3.8.4, 11DC Sources - Operating, Condition B + ((Cpnpp), Unit 1 - Response to Request for Additional Information Regarding Exigent License Amendment Request (LAR) 18-001, Revision to Technical Specification 3.8.4, 11DC Sources - Operating, Condition B)
- 05000445/LER-2024-002, (Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions + ((Cpnpp), Unit 1, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions)
- CP-202400072, (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation + ((Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation)
- 05000446/LER-2011-004, (Cpnpp), Unit 2 Regarding Human Error Resulting in Inoperability of All Safety Injection Accumulators + ((Cpnpp), Unit 2 Regarding Human Error Resulting in Inoperability of All Safety Injection Accumulators)
- 05000446/LER-2024-001, (Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications + ((Cpnpp), Unit 2, Two Recurring Reactor Scrams Associated with Main Feedwater System Modifications)
- CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 + ((Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5)
- CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 + ((Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0)
- CP-201800718, (Cpnpp), Units 1 and 2 - Supplement to Exigent License Amendment Request (LAR) 18-001, Revision to Technical Specification 3.8.4, DC Sources - Operating, Condition B + ((Cpnpp), Units 1 and 2 - Supplement to Exigent License Amendment Request (LAR) 18-001, Revision to Technical Specification 3.8.4, DC Sources - Operating, Condition B)
- CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval + ((Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval)
- ML24212A227 + ((Cpnpp), Updated Final Safety Analysis Report, Amendment 112, Chapter 2, Figures, Part 2 of 2 - Redacted)
- ML23219A124 + ((Cpnpp), Updated Final Safety Analysis Report, Amendment 112, Chapters 3 Through 5, Figures)
- ML24212A234 + ((Cpnpp), Updated Final Safety Analysis Report, Amendment 112, Chapters 12 Through TMI, Figures - Redacted)
- ML23219A126 + ((Cpnpp), Updated Final Safety Analysis Report, Amendment 112, Chapters 6 Through 8, Figures)
- ML24212A162 + ((Cpnpp), Updated Final Safety Analysis Report, Amendment 112, Chapter 1, Introduction and General Description of the Plant - Redacted)
- ML23219A131 + ((Cpnpp), Updated Final Safety Analysis Report, Amendment 112, Chapters 9 Through 11, Figures)
- ML24212A217 + ((Cpnpp), Updated Final Safety Analysis Report, Amendment 112, Chapter 1, Figures, Part 1 of 2 - Redacted)
- ML24212A224 + ((Cpnpp), Updated Final Safety Analysis Report, Amendment 112, Chapter 2, Figures, Part 1 of 2 - Redacted)
- ML24212A220 + ((Cpnpp), Updated Final Safety Analysis Report, Amendment 112, Chapter 1, Figures, Part 2 of 2 - Redacted)
- CPSES-200402417, (Cpses), Fourth Supplemental Response to NRC April 29, 2003 Orders to Comanche Peak Steam Electric Station and Submittal of the CPSES Security Plan, Revision 0. Cover Letter Only + ((Cpses), Fourth Supplemental Response to NRC April 29, 2003 Orders to Comanche Peak Steam Electric Station and Submittal of the CPSES Security Plan, Revision 0. Cover Letter Only)
- CPSES-200301321, (Cpses), License Amendment Request LAR 03-05, One-Time Change to Technical Specification (s) 3.7.10, Control Room Emergency Filtration/Pressurization System (CREFS) Completion Time + ((Cpses), License Amendment Request LAR 03-05, One-Time Change to Technical Specification (s) 3.7.10, Control Room Emergency Filtration/Pressurization System (CREFS) Completion Time)
- CPSES-200501946, (Cpses), Operating Licensing Examination Data + ((Cpses), Operating Licensing Examination Data)
- CPSES-200701284, (Cpses), Operator Licensing Examination Data + ((Cpses), Operator Licensing Examination Data)
- CPSES-200501532, (Cpses), Request for Additional Information Regarding License Amendment Request (LAR) Revision to Technical Specification (TS) 5.6.5, Core Operating Limits Report (COLR) - Response Letter Dated 07/20/2005 + ((Cpses), Request for Additional Information Regarding License Amendment Request (LAR) Revision to Technical Specification (TS) 5.6.5, Core Operating Limits Report (COLR) - Response Letter Dated 07/20/2005)
- CPSES-200500382, (Cpses), Request for Review of Previously Submitted Licensee Topical Reports + ((Cpses), Request for Review of Previously Submitted Licensee Topical Reports)
- CPSES-200600591, (Cpses), Revision to Technical Specification 3.8.1, AC Sources Operating + ((Cpses), Revision to Technical Specification 3.8.1, AC Sources Operating)
- CPSES-200401257, (Cpses), Submittal of Securities and Exchange Commission Annual Form 10K Reports for Txu Energy + ((Cpses), Submittal of Securities and Exchange Commission Annual Form 10K Reports for Txu Energy)
- CPSES-200200334, (Cpses), Transmittal of Electronic Licensing Basis Documents + ((Cpses), Transmittal of Electronic Licensing Basis Documents)
- CPSES-200600870, (Cpses), Transmittal of Year 2005 Radioactive Effluent Release Report + ((Cpses), Transmittal of Year 2005 Radioactive Effluent Release Report)
- CPSES-200300626, (Cpses), Unit 1 Ninth Refueling Outage (1RF09) Steam Generator Twelve Month Report Special Report 1-SR-03-001-00 + ((Cpses), Unit 1 Ninth Refueling Outage (1RF09) Steam Generator Twelve Month Report Special Report 1-SR-03-001-00)
- CPSES-200700951, (Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009 + ((Cpses), Unit 1, Pressurizer Weld Overlay 60 Day Report and Update for Unit 1 Reactor Pressure Vessel Head Replacement Regarding Revised Order EA-03-009)
- ML013620371 + ((D.C. Cook) Nuclear Plant, Units 1 and 2 - Response to Nuclear Regulatory Commission (NRC) Bulletin 2001-01, Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles)
- ML060330626 + ((DAEC) Declaration of Unusual Event)
- ML033070293 + ((DAEC) Forced Outage Due to a Condenser Tube Leak)
- ML041730519 + ((DAEC) Site Management Changes)
- ML050350194 + ((DBNPS)/Mid-Cycle 14 Outage Reactor Head Visual Inspection Results (Confirmatory Order EA-03-214)/Letter)
- ML21298A228 + ((DC) 2021402 Inspection Report (Letter))
- ML070180221 + ((DCCNP-1 and 2) Closeout of Licensees Response to Generic Letter 2006-03, Potentially Nonconforming Hemyc and MT Fire Barrier Configurations)
- ML062480470 + ((DCCNP-1 and DCCNP-2) -Use of a Subsequent Edition of ASME Code for Inservice Inspection Requirements)
- ML061010512 + ((DCCNP-2) - Issuance of Amendment Under Emergency Circumstances Regarding Diesel Generator Voltage Limit Requirements)
- DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring + ((DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring)
- DCL-10-505, (DCPP) Emergency Operations Facility (DCPP EOF) Facility Emission and Throughput Data for Inventory Year 2009 (Annual Air Emissions Report) and Associated Facility Reporting Requirements + ((DCPP) Emergency Operations Facility (DCPP EOF) Facility Emission and Throughput Data for Inventory Year 2009 (Annual Air Emissions Report) and Associated Facility Reporting Requirements)
- ML11166A262 + ((DCPP) Emergency Operations Facility (DCPP EOF) Facility Emission and Throughput Data for Inventory Year 2009 (Annual Air Emissions Report) and Associated Facility Reporting Requirements)
- DCL-2002-528, (DCPP) Submittal - Receiving Water Monitoring Program 2001 Annual Report + ((DCPP) Submittal - Receiving Water Monitoring Program 2001 Annual Report)
- DCL-11-101, (DCPP) Unit 1, ASME Section XI Inservice Inspection Program Request for Alternative NDE-RCS-SE-LP1 Cl to Allow Use of Alternate ASME Code Case N-770-1 Baseline Exam + ((DCPP) Unit 1, ASME Section XI Inservice Inspection Program Request for Alternative NDE-RCS-SE-LP1 Cl to Allow Use of Alternate ASME Code Case N-770-1 Baseline Exam)
- DCL-13-070, (DCPP) Unit 2 - ASME Section XI Inservice Inspection Program Request for Relief NDE-PNS-U2 to Allow Use of Alternate Examination Volume Coverage Requirements + ((DCPP) Unit 2 - ASME Section XI Inservice Inspection Program Request for Relief NDE-PNS-U2 to Allow Use of Alternate Examination Volume Coverage Requirements)
- Regulatory Guide 1.177 + ((DG-1287) an Approach for Plant-Specific, Risk Informed Decisionmaking: Technical Specifications)
- ML21154A243 + ((DNFSB-20-A-05)-Status of Recommendations: Independent Evaluation of Dnfsbs Implementation of the Federal Information Security Modernization Act of 2014 for Fiscal Year 2019 Dated June 3rd, 2021)