Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17333A446 +
- ML18153A615 +
- ML18153A614 +
- ML18153A613 +
- ML20117N840 +
- ML20117D712 +
- ML20117D709 +
- ML20111B758 +
- ML20111A689 +
- ML20111A550 +
- ML20111A527 +
- ML20108E359 +
- ML20108E355 +
- ML20108E249 +
- ML20108D996 +
- ML20108D939 +
- ML20108D514 +
- ML20108D500 +
- ML20108D405 +
- ML20108D386 +
- ML20138B464 +
- ML20266A233 +
- ML20265D333 +
- NSD-NRC-96-4712, Forwards Nonproprietary & Proprietary Versions of Responses to NRC RAI 440.258 on AP600 Design Certification Test Program,Including Revised Drawings Used to Build Relap 5 Input Model.Proprietary Responses & Drawings Withheld +
- 3F0596-11, Forwards Books 1-6 of Underwriters Labs Test Repts for FPC for Feb 1996 +
- DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld +
- ST-HL-AE-5357, Forwards Endorsements 18,16,55 & 14 to Certificates N-113, N-116,N-307 & NW-199 & Endorsements 20,19,46 & 19 to Maelu Certficates M-113,M-116,MF-130 & MW-100 +
- TAC:M91786 +
- TAC:M94561 +
- ML20349J456 +
- ML20217K235 +
- ML20202F439 +
- 05000331/LER-1996-002-01, :on 960408,PCIS Half Group III Isolation Occurred Due to Blown Fuse During Maint.Fuse Was Replaced & Radiation Monitor Was Tested +
- 05000445/LER-1996-005, :on 960310,entry Into TS 3.0.3 Occurred Due to Cracked Weld in SI Sys Piping.Removed & Replaced Cracked Weldment W/New Weld +
- 05000313/LER-1996-004-02, :on 960306,determined That Tech Spec Violation Occurred When Crane Load in Excess of 2,000 Lb Positioned Briefly Over Fuel Stored in Spent Fuel Pool. Caused by Inadequate Procedures +
- 05000354/LER-1996-013, :on 960406,ESFA Occurred Due to Isolation of MSL Drain Inboard Isolation Valve.Replaced & Tested Circuit Board +
- 05000331/LER-1996-002, :on 960408,PCIS Half Group III Isolation Occurred Due to Blown Fuse During Maint.Reviewed Event W/ Maint Technicians to Reinforce Need to Secure Loose Cables During Maint Activities +
- ML20108E025 +
- ML20134P008 +
- ML18065A707 +
- ML18065A706 +
- 05000260/LER-1996-002-03, :on 960323 & 24,main Steam Isolation Valve Leak Rates Exceeded Acceptance Criteria.Caused by Excessive Leakage on a & C Inboard MSIV Line Valves.Leaking Valves Investigated +
- ML18153A619 +
- 05000251/LER-1996-001-03, :on 960409,manual RT Occurred Due to Turbine Governer Control Oil Perturbation.Disassembled & Inspected Governor Valve for Cleanliness & Corrosion Products +
- ML17353A723 +
- 05000528/LER-1996-001, Forwards LER 96-001-00 Re Identification of Condition Resulting in Being Outside Design Basis of Plant,Could Have Adversely Affected Ability to Achieve & Maintain Safe Shutdown Conditions,Per PVNGS Fire Protection Program +
- ML17312A746 +
- ML16299A524 +
- ML15118A107 +
- ML14178A934 +