Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17264A173 +
- ML17332A979 +
- Press Release-95-117, the Nuclear Regulatory Commission Has Received the Attached Report, in the Form of a Letter, from Its Independent Advisory Committee on Reactor Safeguards +
- ML18101B011 +
- ML18065A124 +
- ML18065A122 +
- ML20100B750 +
- ML20100B697 +
- ML20100B692 +
- ML20099L405 +
- ML20099L354 +
- ML20098B314 +
- ML20092N312 +
- ML20092M190 +
- ML20092M194 +
- ML20092L689 +
- ML20092L234 +
- ML20092L054 +
- ML20092K746 +
- NRC-95-0064, Responds to Questions in Response to Notice of Violation from Insp Rept 50-341/95-03 +
- ML20107L660 +
- ML20134N490 +
- ML20133B252 +
- LIC-95-0178, Forwards Fort Calhoun Station Performance Indicators Rept, Aug 1995 +
- ST-HL-AE-5175, Informs of Listed Changes to Distribution List for Facility +
- RC-95-0239, Forwards Response to NRC Re Violations Noted in Insp Rept 50-395/95-13.Corrective Actions:Operations Personnel Went to Emergency FW Pump Room & Verified Actual Temp +
- B15372, Provides Response to Requests for Submittal of Plans & Schedule for Emergency Operating Procedures Upgrade Program Insp Rept 50-336/95-21 +
- ST-HL-AE-5182, Special Rept:On 950823,valid Failure of Sdg 12 Occurred Due to Misalignment of Reset Coil Contacts Resulting in Intermittent Failure of K1 relay.K1 Relay in Sdg 12 Replaced +
- NRC-95-4562, Forwards Propriertary & Nonproprietary Versions of Maccs Input File for AP600 Ci Release Category.Electronic Copy of Proprietary Maccs Input File Also Encl.Proprietary Maccs Input File & Electronic Copy of Maccs File Withheld +
- ML20265E490 +
- ML20265C116 +
- ML20265D967 +
- 05000374/LER-1995-006, :on 950302,primary Containment Maximum Allowable Leakage Was Exceeded Due to LLRT Failure.Repaired Valves +
- 05000219/LER-1995-005, :on 950825,identified non-conservative Instrument Setpoint for Anticipatory Scram Bypass Pressure Switches Due to Original Plant Design.Revised Plant Operation Procedures +
- 05000336/LER-1995-034, :on 950822,TS Surveillance Was Missed Due to Personnel Error.Performed Surveillance Shortly After Time Interval Had Expired +
- ML20198M194 +
- ML20092M509 +
- 05000311/LER-1995-006-02, :on 950822,surveillance Was Missed & Charcoal Absorber Testing Exceeded TS SR Time Limit.Caused by Informal Process to Monitor Charcoal Absorber Run Time Hs Being Used.Assigned Responsibility to Operations Dept +
- ML17353A367 +
- 05000528/LER-1995-010, :on 950727,equipment Qualification of Air Handling Unit Caused Essential Cw Pump to Be Inoperable. Used Work Orders to Drill Weep Holes in Motor Lead Connection Boxes +
- IR 05000397/1995019 +
- ML17264A158 +
- ML17291B036 +
- ML17291B038 +
- TAC:M92963 +
- ML16342D055 +
- ML14181A763 +
- ML20092M499 +
- TAC:M93390 +