- SBK-L-17117, Inservice Inspection Examination Report + (22:10:49, 8 January 2025)
- ML17200A106 + (22:10:51, 8 January 2025)
- RAIO-0717-54951, LLC Response to NRC Request for Additional Information No. 41 (Drai No. 884) on the NuScale Design Certification Application + (22:10:53, 8 January 2025)
- ML17200A088 + (22:11:33, 8 January 2025)
- ML17200A087 + (22:11:34, 8 January 2025)
- ML17200A085 + (22:11:36, 8 January 2025)
- ML17200A084 + (22:11:37, 8 January 2025)
- ML17200A065 + (22:11:39, 8 January 2025)
- 05000249/LER-1988-009-03, :on 880505,Groups II & III Primary Containment Isolation Occurred During Shutdown for Scheduled Refueling Outage.Caused by Mgt Deficiency for Failure to Implement Corrective Actions from Previous Event + (22:11:42, 8 January 2025)
- 05000237/LER-1988-008-04, :on 880506,reactor Bldg Ventilation Sys Automatically Tripped & Standby Gas Treatment Train Auto Started.Caused by Error in Chemistry Procedure 2000-5. Radiation Source Removed from Monitor + (22:11:46, 8 January 2025)
- ML17199Z588 + (22:11:48, 8 January 2025)
- ML17199Z360 + (22:11:51, 8 January 2025)
- ML17199Z183 + (22:11:53, 8 January 2025)
- ML17199Z138 + (22:11:56, 8 January 2025)
- ML17199Z095 + (22:11:58, 8 January 2025)
- ML17199Z054 + (22:11:59, 8 January 2025)
- 05000237/LER-1988-007-06, :on 880504,discovered That CRD Scram Testing Surveillance Interval Exceeded.Caused by Scram Testing Procedure Deficiency.Strip Chart Event Recorder Wired, Utilizing Wire plug-in Jacks + (22:12:02, 8 January 2025)
- PNO-III-88-046A, updates Augmented Insp Team Investigation of Failure of MSIVs to Close During Test.On 880525,region Determined That Licensee Completed Commitments,Per 880518 Confirmatory Action Ltr.Unit 2 Startup Scheduled on 880526 + (22:12:08, 8 January 2025)
- ML17199Y441 + (22:12:10, 8 January 2025)
- ML17199Y400 + (22:12:12, 8 January 2025)
- ML17199Y357 + (22:12:13, 8 January 2025)
- ML17199Y309 + (22:12:14, 8 January 2025)
- 05000237/LER-1988-006-07, :on 880429,primary Nitrogen Inerting Makeup Sys Line Kinked & Cracked.Caused by Personnel Error & Rigging Procedure Deficiency.Rigging Procedure Improvement Initiated & Addl Rigging Operations Training Planned + (22:12:17, 8 January 2025)
- 05000237/LER-1988-005-06, :on 880426,reactor Bldg Ventilation Sys (RBVS) Tripped,Initiating Standby Gas Treatment a Sys Train.Caused by Spurious Instantaneous Spike on Unit 2 Rbvs.Calibr Check of Unit 2 RBVS Performed Satisfactorily + (22:12:21, 8 January 2025)
- ML17199Y180 + (22:12:25, 8 January 2025)
- 05000249/LER-1988-010-01, :on 880424,main Steam Safety Valve 3-203-4D Opened at Pressure in Excess of Tech Spec 4.6.E Required Setpoint.Caused by Setpoint Drift.Valve Overhauling,Setting & Retesting Prior to Installation Planned + (22:12:27, 8 January 2025)
- ML17199Y088 + (22:12:29, 8 January 2025)
- ML17199X994 + (22:12:33, 8 January 2025)
- ML17199X956 + (22:12:35, 8 January 2025)
- ML17199X910 + (22:12:37, 8 January 2025)
- 05000249/LER-1988-007-04, :on 880413,standby Liquid Control Relief Valves Failed to Open During Performance.Caused by Blockage as Result of Sodium Pentaborate Solution.Procedure Will Be Revised to Indicate Testing of Relief Valves + (22:12:40, 8 January 2025)
- 05000249/LER-1988-011, :on 880412,Group II Primary Containment Isolation Occurred.Caused by Procedural Inadequacy.Power Restored to Monitors & Isolation Reset.Procedural Change Being Investigated + (22:12:45, 8 January 2025)
- ML17199X710 + (22:12:48, 8 January 2025)
- ML17199X668 + (22:12:50, 8 January 2025)
- 05000249/LER-1988-004-07, :on 880404,atmosphere Containment & Dilution Purge Check Valve Leaked Exceeding Tech Spec Limit.Cause of Leakage Undetermined.Cause Will Be Determined & Valve Will Be Repaired & Retested + (22:12:52, 8 January 2025)
- ML17199X577 + (22:12:55, 8 January 2025)
- ML17199X533 + (22:12:56, 8 January 2025)
- ML17199X487 + (22:12:58, 8 January 2025)
- 05000237/LER-1987-022, Application for Amends to Licenses DPR-19 & DPR-25, Eliminating APRM Downscale Scram Requirement.Amend Submitted as Part of long-term Corrective Action to LER 87-022 & Insp Rept 50-237/87-40.Fee Paid + (22:13:01, 8 January 2025)
- 05000237/LER-1988-001-12, :on 880329,diesel Generator Air Start Piping Found Outside FSAR Design Criteria.Caused by Original Design Deficiency.Mods Initiated to Modify Piping Sys & Procedure DAP 5-1, Plant Mod Program, Revised + (22:13:05, 8 January 2025)
- ML17199X287 + (22:13:08, 8 January 2025)
- IR 05000249/1986015 + (22:13:09, 8 January 2025)
- ML17199X190 + (22:13:12, 8 January 2025)
- ML17199X058 + (22:13:14, 8 January 2025)
- ML17199X003 + (22:13:16, 8 January 2025)
- 05000237/LER-1987-025, Forwards I-131 Removal Efficient Determination of Adsorbent Samples on Standby Gas Treatment, Test Repts Per 880408 Request.Info Concerns Control Room Habitability Pertaining to LER 87-025 + (22:13:19, 8 January 2025)
- ML17199W908 + (22:13:20, 8 January 2025)
- ML17199W869 + (22:13:22, 8 January 2025)
- ML17199W814 + (22:13:25, 8 January 2025)
- 05000237/LER-1988-001, :on 880329,diesel Generator Air Start Piping (Dgasp) Exceeded Code Stress Analysis Allowables Specified in Fsar.Caused by Original Design Deficiency.Mod of Dgasp on Unit 2 & Unit 3 Planned + (22:13:27, 8 January 2025)
- ML17199W718 + (22:13:30, 8 January 2025)