Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17208B070 + (21:11:17, 8 January 2025)
- JAFP-17-0078, Focused Evaluation Summary Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (21:11:18, 8 January 2025)
- ML17208B069 + (21:11:18, 8 January 2025)
- JAFP-17-0077, Mitigating Strategies Assessment (MSA) for the Reevaluated Flooding Hazards Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima + (21:11:19, 8 January 2025)
- IR 05000073/2017201 + (21:11:25, 8 January 2025)
- CNS-17-039, Relief Request 17-CN-002, Request for Alternative Method to Establish New Inservice Testing Values for a Chemical and Volume Control Pump + (21:11:26, 8 January 2025)
- ML17208B022 + (21:11:28, 8 January 2025)
- ML17208B021 + (21:11:29, 8 January 2025)
- ML17208B018 + (21:11:30, 8 January 2025)
- L-80-280, Responds to IE Bulletin 80-16, Potential Misapplication of Rosemount,Inc Models 1151 & 1152 Pressure Transmitters W/ Either a or D Output Codes. Transmitters Are Not Installed in Any safety-related Applications + (21:11:32, 8 January 2025)
- ML17208B017 + (21:11:32, 8 January 2025)
- IR 05000335/1980023 + (21:11:36, 8 January 2025)
- L-80-306, Forwards Updated Response Re Natural Circulation Cooldown. Emergency Operating Procedure 0120040 Revised to Address Recognition of Potential for Upper Head Steam Formation & Cooldown Rate Necessary to Prevent Void Formation + (21:11:39, 8 January 2025)
- ML17208B012 + (21:11:39, 8 January 2025)
- ML17208B010 + (21:11:42, 8 January 2025)
- ML17208B009 + (21:11:43, 8 January 2025)
- ML17208B007 + (21:11:43, 8 January 2025)
- IR 05000335/1980019 + (21:11:44, 8 January 2025)
- ML17208B004 + (21:11:46, 8 January 2025)
- ML17208B002 + (21:11:47, 8 January 2025)
- ML17208B000 + (21:11:51, 8 January 2025)
- L-80-288, Responds to IE Bulletin 80-15.Fourteen Manhours Expended Preparing Rept & 434 Manhours Expended on Corrective Action + (21:11:52, 8 January 2025)
- ML17208A998 + (21:11:55, 8 January 2025)
- L-80-304, Forwards Response to NRC 800721 Request for Addl Info Re Adequacy of Station Electric Distribution Sys Voltages + (21:11:57, 8 January 2025)
- ML17208A997 + (21:11:57, 8 January 2025)
- L-80-273, Forwards Corrected Page for Licensee 800804 Response to IE Bulletin 80-06 Re Engineered Safety Feature Reset Controls + (21:12:03, 8 January 2025)
- ML17208A992 + (21:12:05, 8 January 2025)
- L-80-301, Responds to NRC Re TMI-related Tech Specs. Proposed Specs Have Been Drafted & Forwarded to Onsite & Offsite Review Committees for Review & Approval + (21:12:06, 8 January 2025)
- ML17208A990 + (21:12:06, 8 January 2025)
- L-80-297, Forwards Revised Plans for Monitoring Noble Gases Which Might Be Released from Steam Plant,Per TMI Lessons Learned Task Force short-term Requirements + (21:12:08, 8 January 2025)
- ML17208A987 + (21:12:11, 8 January 2025)
- ML17208A985 + (21:12:12, 8 January 2025)
- 05000335/LER-1980-036, Forwards LER 80-036/03L-0 + (21:12:13, 8 January 2025)
- L-80-295, Responds to NRC Re Use of Nukem 750 as Expansion Joint Filler Inside Containment.Includes Chemical Formulation of Nukem 750 & Quantity Used Inside Containment + (21:12:14, 8 January 2025)
- L-80-296, Forwards Info Re Auxiliary Feedwater Sys in Response to NRC 800502 Request.Includes Info Re Emergency Operating Procedure Re Alternate Sources of Auxiliary Feedwater,Pump Area Communications & Redundant Condensate Tank + (21:12:16, 8 January 2025)
- 05000335/LER-1980-034, Forwards LER 80-034/03L-0 + (21:12:18, 8 January 2025)
- 05000335/LER-1980-035, Forwards LER 80-035/03L-0 + (21:12:20, 8 January 2025)
- L-80-285, Responds to IE Bulletin 80-19.Mercury-wetted Relays Not Used in Logic Matrix of Reactor Protective Sys + (21:12:21, 8 January 2025)
- LD-80-050, Informs That Util Has Contracted C-E for Technical Support & Consultation in Order to Respond to Questions Re Aspects of 800611 Natural Circulation Cooldown at Facility.Responds to NRC Requesting Technical Opinion & Advice + (21:12:22, 8 January 2025)
- ML17208A972 + (21:12:25, 8 January 2025)
- L-80-258, Final Deficiency Rept Re Cracked & Broken Electrical Penetration Connections.Caused by Poor Assembly Techniques. Supplier Will Develop Repair Procedures & Repair & Replace Fractured Ring Tongue Connectors + (21:12:26, 8 January 2025)
- ML17208A971 + (21:12:26, 8 January 2025)
- IR 05000389/1980008 + (21:12:28, 8 January 2025)
- ML17208A968 + (21:12:30, 8 January 2025)
- ML17208A966 + (21:12:31, 8 January 2025)
- ML17208A965 + (21:12:32, 8 January 2025)
- ML17208A964 + (21:12:34, 8 January 2025)
- ML17208A959 + (21:12:35, 8 January 2025)
- L-80-253, Suppls Response to IE Bulletin 80-04, Analysis of PWR Main Stream Line Break W/Continued Feedwater Addition. Complete Analysis of Automatic Auxiliary Feedwater Initiation, Supports Installation of Automatic Sys + (21:12:36, 8 January 2025)
- ML17208A958 + (21:12:36, 8 January 2025)
- ML17208A956 + (21:12:39, 8 January 2025)