Forwards IE Insp Rept 50-335/80-19 on 800609-10.No Noncompliance Noted
ML17208B004
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/26/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17208B005 List:
References
NUDOCS 8009220182
Download: ML17208B004 (3)


See also: IR 05000335/1980019

Text

~S REOIj

~4

"o

Cp

JC

o

j

++*++

In Reply Refer To:

RII:DJP

50-335/80-19

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JUN 26 1980

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FI

33152

Gentlemen:

This refers

to the inspection

conducted

by D. J. Perrotti of this office on

June

9 through

10,

1980 of activities authorized

by NRC Operating

License

No.

DPR-67 for the St. Iucie facility, and to the discussion

of our findings held

with C.

M. Wethy at the conclusion of the" inspection.

Areas

examined

during,the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews .with

personnel,

and observations

by the inspector.

0

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have

examined

actions

you have

taken with regard to previously identified

enforcement matters

and unresolved

items.

The status of these items is discussed

in the enclosed report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title

l0, Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document

Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary

that you make

a written application within 20 days to this office to

withhold such

information from public disclosure.

Any such application

must

include

a full statement

of the reasons

on the basis of which it is claimed that

the information is proprietary,

and should be prepared

so that proprietary infor-

mation identified in the application is contained in a separate

part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

80092@0

7

Florida Power and Light Company

-2-

I

JUN 26 1980

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

J. Philip S

hr, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

inspection Report No. 50-335/80-19

cc w/encl:

C.

M. Wethy, Plant Manager

Nat Weems, Assistant

(}A Manager