ML17208B021

From kanterella
Jump to navigation Jump to search
Amend 1 to CPPR-144,incorporating Paragraph 3.H,re Consideration of Total Loss of Ac Power as DBE
ML17208B021
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/18/1980
From: Youngblood B
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17208B019 List:
References
ALAB-603, NUDOCS 8009260012
Download: ML17208B021 (2)


Text

g pal Bfg(

O J~

~I

+**y%

UNITEDSTATES NUCLEAR REGULATORY COMMlSSlON WASHINGTON, O. C. 20555 FLORIDA POWER AND LIGHT COMPANY ST LUCIE PLANT UNIT NO. 2 DOCKET NO 50-389 AMENDMENT TQ CONSTRUCTION PERMIT Amendment No.

1 Construction Permit No.: CPPR-144 I.

Pursuant to a Decision issued by the Atomic Safety and Licensing Appeal

Board, dated July 30, 1980, the Nuclear Regulatory Commission hereby issues Amendment No. I to Construction Permit No.

CPPR-144 by adding the foIIowing paragraph:

3.H.

The total loss of ac power shall be considered a design basis event for the St. Lucio Plant, Unit 2.

The Final Safety Analysis Report shall include an analysis which demonstrates the ability of the plaIIt in its final design to be safely controlled through suclI an event.

(The analysis may assume that ac power at least equivalent to the output of a single emergency diesel wi11 be availabIe at the end of a reasonable period.)

The Final Safety Analysis Report shall also include in detail, the training programs and procedures for station operation during a blackout transient and for restoration of ac power.

2.

This amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Date of Issuance:

SEP 1 8 ~~8O B-ungblo

, Chief Licensing Branch No. I Division of Licensing

~

~