- L-85-431, Requests Extension of 10-yr Inservice Insp Interval to 880211 as Allowed in Section XI of ASME Code & Section B of 10CFR50.55a, Codes & Stds. Extension Required Due to Outage for Core Barrel Repair + (20:09:39, 8 January 2025)
- L-85-423, Forwards BAW-1880, Analysis of Capsule W-83,Florida Power & Light Co,St Lucie Plant Unit 2,Reactor Vessel Matls Surveillance Program, Per 10CFR50,App H.Rept Describes Results of Exam of First Surveillance Capsule + (20:09:41, 8 January 2025)
- L-85-406, Forwards Addl Info Re 840522 Application for Amend to License NPF-16,increasing Esfas/Auxiliary Feedwater Actuating Sys Actuation Logic Surveillance Interval from 6 Months to 18 Months + (20:09:43, 8 January 2025)
- TAC:53045 + (20:09:45, 8 January 2025)
- ML17216A325 + (20:09:48, 8 January 2025)
- L-85-400, Application for Amend to License DPR-67,changing Tech Specs to Support Installation of safety-grade Automatic Feedwater Sys During Upcoming Refueling Outage.Fee Paid + (20:09:49, 8 January 2025)
- ML17216A324 + (20:09:49, 8 January 2025)
- ML17216A321 + (20:09:52, 8 January 2025)
- ML17216A319 + (20:09:53, 8 January 2025)
- L-85-397, Advises That Util Will Provide Response to NRC 850621 & 0711 Requests for Info Re Relief & Safety Valve Test Requirements Per TMI Item II.D.1 by 860315 + (20:09:54, 8 January 2025)
- L-85-399, Forwards Addl Info in Response to Generic Ltr 85-02 Re Category C-2 Steam Generator Tube Insps.Insp Program in Compliance W/Expanded Insp Requirements of C-2.Addl Tubes Inspected on case-by-case Basis + (20:09:56, 8 January 2025)
- ML17216A314 + (20:09:57, 8 January 2025)
- L-85-396, Application for Amend to License DPR-67,changing Linear Heat Rate Limiting Condition for Operation from Constant Value to Represent Axially Dependent Limit for All Fuel in Core.Fee Paid + (20:10:01, 8 January 2025)
- ML17216A311 + (20:10:03, 8 January 2025)
- L-85-374, Forwards Response to 850429 Request for Addl Info on Generic Ltr 83-28,Item 1.1 Re post-trip Review.Revised Procedures Re post-trip Review & Responsibilities of Shift Technical Advisor Encl + (20:10:04, 8 January 2025)
- ML17216A310 + (20:10:04, 8 January 2025)
- L-85-392, Informs That Util Will Provide NRC W/Compliance Schedule for ATWS Rule 90 Days After NRC Review of C-E Owners Group Approach + (20:10:06, 8 January 2025)
- L-85-379, Requests Approval to Use Alternative Insp Technique to Satisfy Inservice Pressure Testing Requirements of ASME Code.Instrumented Insp Technique Can Be Implemented on Listed Sys + (20:10:08, 8 January 2025)
- L-85-373, Informs That C-E Redoing Facility Large Break LOCA Analysis & Results Expected to Be Available by 860131 + (20:10:09, 8 January 2025)
- L-85-358, Responds to 850806 Request for Addl Info Re Generic Ltr 83-28,Item 3.1.2.Vendor Info & Test Guidance Available to Date Verified for Inclusion in Test & Maint Procedures for safety-related Components/Sys.No Tech Spec Changes Needed + (20:10:11, 8 January 2025)
- TAC:84028 + (20:10:13, 8 January 2025)
- ML17216A293 + (20:10:14, 8 January 2025)
- ML17216A292 + (20:10:15, 8 January 2025)
- L-85-330, Forwards Tech Spec Figures 6.2-1 & 6.2-2 Outlining Organizational Changes to Replace Tech Specs Submitted w/840515 Application to Amend License DPR-67 & 840521 Application to Amend License NPF-16 + (20:10:16, 8 January 2025)
- L-85-331, Informs That,Due to Discovery of Error Re Use of Incorrect Value for Reactor Coolant Pump Torque for LOCA-ECCS Analysis,Lhgr Restricted to 14.0 Kw/Ft for Remainder of Cycle 6.Revised LHGR Limits Table Encl + (20:10:21, 8 January 2025)
- PLA-7619, Response to Request for Additional Information Regarding License Amendment Request to Revise Diesel Generator Surveillance Requirements with New Steady State Voltage and Frequency Limits + (20:10:21, 8 January 2025)
- L-85-285, Requests NRC Postponement of Oct 1986 Completion Date for Mod of Security Plan.Addl Options Under Consideration Due to High Cost of Cleaning Up After Massive Influx of Jellyfish + (20:10:24, 8 January 2025)
- ML17216A272 + (20:10:24, 8 January 2025)
- L-85-309, Advises That Implementation of ATWS Mods Will Not Be Completed by Spring 1986 for Unit 2 Nor by Spring 1987 for Unit 1 Based on Preliminary Schedules.Schedules Contingent Upon Completion of C-E Owners Group Generic Design + (20:10:26, 8 January 2025)
- ML17216A269 + (20:10:28, 8 January 2025)
- L-85-300, Advises That Util Working w/C-E to Develop Schedule for Resolution of Potential Nonconservatism in One Element of C-E Large Break LOCA Evaluation Model.Schedule Will Be Available by 850930 + (20:10:31, 8 January 2025)
- ML17216A267 + (20:10:31, 8 January 2025)
- ML17216A265 + (20:10:33, 8 January 2025)
- L-85-259, Forwards Rev 1 to PNS-CIG 002-10, Inservice Insp,First 10-Yr Plan, Incorporating Responses to 840914 Request for Addl Info + (20:10:34, 8 January 2025)
- L-85-291, Advises That Schedule for Responding to NRC 850621 & 0711 Requests for Addl Info Re TMI Action Item II.D.1 Will Be Provided by 851031.Info Must Be Obtained from NSSS & Ae + (20:10:36, 8 January 2025)
- L-85-288, Forwards Fees Inadvertently Omitted from 850719 Applications for Amends to Licenses DPR-67 & NPF-16 + (20:10:37, 8 January 2025)
- ML17216A258 + (20:10:39, 8 January 2025)
- L-85-252, Application for Amends to Licenses DPR-67 & NPF-16,changing Tech Specs to Add Instrumentation Required by NUREG-0737 to Accident Monitoring Instrumentation Tables.Fee Paid + (20:10:40, 8 January 2025)
- ML17216A255 + (20:10:41, 8 January 2025)
- L-85-268, Application to Amend License DPR-67,permitting Continued Operation at Rated Thermal Power for Specified Period of Time Following Dropped Control Element Assembly.No Significant Hazards Evaluation Encl + (20:10:42, 8 January 2025)
- L-85-280, Forwards Response to 850423 & 25 Requests for Addl Info Re Reactor Coolant Pump (RCP) Trip.Containment Isolation Actuation Signals Do Not Affect RCP Essential Svcs + (20:10:44, 8 January 2025)
- TAC:53134 + (20:10:45, 8 January 2025)
- L-85-277, Forwards Response to 850107 Request for Addl Info Re Generic Ltr 83-28,Items 4.2.1 & 4.2.2 Concerning Maint Program for Reactor Trip Breakers (Rtb) & Trending of Rtb Parameters to Forecast Degradation of Operability,Respectively + (20:10:46, 8 January 2025)
- TAC:57238 + (20:10:47, 8 January 2025)
- ML17216A248 + (20:10:49, 8 January 2025)
- ML17216A246 + (20:10:50, 8 January 2025)
- ML17216A245 + (20:10:51, 8 January 2025)
- ML17216A244 + (20:10:52, 8 January 2025)
- ML17216A242 + (20:10:53, 8 January 2025)
- TAC:51285 + (20:10:53, 8 January 2025)
- L-85-258, Informs That Response to 850611 Request for Schedule for Submitting Addl Info Re SPDS Parameter Selection Will Be Provided by 850915 + (20:10:54, 8 January 2025)
- L-85-265, Advises That Review of 850614 Draft Safety Evaluation Re ESFAS Surveillance Requirements Completed.Requests Meeting to Clarify NRC Concerns.Addl Info Re Proposed Tech Specs Will Be Submitted by 851010 + (20:10:56, 8 January 2025)