PNS-CXG DOCVHENT /f002-10 REVISION 1
t.lST OF EFFECTlVE PAGES i thru iii iv-1 thru iv-16 v-1 thru v-2 vi-1 thru vi-8 vii-1 vii-2 thru vii-4 vii-5 thru vii-6 viii ix 1-1 thru 1-2 2-1 thru 2-2 2-3 2-4 2-5 2-6 thru 2-12 3-1 3-2 thru 3-4 3-5 3-6 3-7 thru 3-55 3-56 thru 3-59 3-60 thru 3-67 3-68 thru 3-71 3-72 thru 3-75 3-76 thru 3-80 3-81 thru 3-90 3-91 3-92 thru 3-97 3-98 3-99 thru 3-112 3-113 3-114 thru 3-121 3-122 3-123 thru 3-126 3-127 3-128 thru 3-135 3-136 3-137 thru 3>>141 3-142 thru 3-152 3-153 thru 3-157 3-158 thru 3-159 3>>160 3-161 3-162 3-153 thru 3-166 REY.
0 0
1 1
0 1
0 0
0 0
~ 0 1
0 1
0 1
0 1
0 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
I:
0 PAGE 3-I,68 thru 3-171 3-172 3-173 thru 3-175 3-176 3-177 thru 3-187 3-188 thru 3-189 3-190 thru 3-192 3-193 thru 3-198 3-199 thru 3-209 4-1 thru 4-4 5-1 6-1 thru 6-8 Appendix A (All)
Appendix B (All)
Appendix C (All)
Appendix D (All)
Appendix E (All)
Appendix F (All)
- Appendix H **
'-1 thru 1-2 1-3 thru 1-4 1-5 2-1 3-1 thru 3-2 4-1 thru 4>>2 5-1 5-2 6-1 6-2
~
7-1 8-1 thru 8-2 9-1 10-1 thru 10-Z 11-1 12-1 thru 12-2 13-1 14-1 thru 14-2 15-1 16-1 We~
I~ IC ~~>
17-1 18-1 19-1 20-1 21-1 thru 21-3 REY.
1 0
0 1
0 1
0 1
0 0
0 0
0 0
0 0
0 0
1 00 0
1 0
1 23-1 24-1 25-1 26-1 27-1 28-I.
28-2 28-3 28-6 29-1 30-1 31-1 32-1 32-2 32-3 33-1 34-1 35-1 36-1 37-1 38-1 thru 23-3 thru 24-3 thru 25-2 thru 26-2 thru 27-2 thru 28-5 thru 29-4 thru 30-3 thru 31-2 thru 37-3 thru 38-2
- Appendix f ***
41-1 41-2 42-1 42-2 43-1 43-2 43-3 thru 43-12 43-13 43-14 44-1 44-2 thru 44-16 45-1 thru 45-2 46-1 thru 46-2 47-1 48-1 thru 48-2 49-1 thru 49-6 50-1 thru 50-7 51-1 thru 51-6 52-1 thru 52-4 55-I.
56-1 57-1 REV.
1 1
1 1
1 I.
0 1~l A Q' 1
1 0
1' I
1 0
1 0
1 0
0 0
0 0
0 0
0 0
1 1
0 v-1
~=85080gagql 850705 pDp...Pgggg, P5D0038 pDR
~'
PNS-CIG DOCUMENT I/002-10 REVISION 1
llST QF EFFECTiYE PAGES
~
58-1 58-2 59-1 59-2 60-1 60-2 61-1 61>>2 63-1 63-2 64-1 65-1 65-2 65-3 66-1 67-1 68-1 70-1 70-2 70-3 71-1 72-1 PAGE thru 60-3 thru 63-4 thru 64-5 thru 65-4 thru 66-4 thru 67-2 thru 68-2 thru 70-10 74-13 75-1 thru 74-15 thru 75-5 thru 76-6 76-1 77-1 77-2 77-3 78-1 79-1 79-2 thru 77-5 thru 78-7 thru 79-4 thru 80-5 80-1 81-1 82-1 73-1 thru 73-11 74-1 thru 74-11 74-12 REV.
0 1
0 1
0 1
1 0
1 0
1 0
1 0
0 1
0 0
1 0
0 0
0 0
1 0
0 0
0 1
0 0
1 0
0 0
0 PAGE REV.
PAGE RE V.
PNS-CI G DOCUMENT <<002-10 REVISION I
Rev.
No.
Date Affected Pages Purpose of Revisiori 0
10/03/83 ALL ORIGINAL ISSUE Revision 0 Prepared by:
P.V/. Heycock Revision 0 Approved by:
See original Document TITLE PAGE 06/10/86 vi Vl'I-2 vii-3 Yll-4 This revision is generally intended to correct errors found in the original issue of the Program and to address the FPL response to NRC questions as documented fn Letter L-84-340 of November 19, 1985.
Additionally, changes are made to the Class 1 welds selected for examination based on Table INB-2600-1, Category B-J, Note (1)(b),per stress analyses as documented in CE letter L-CE-10432 ofJune 11, 1984 and FPL Letter EPO-84-0903 of May 11, 1984.
Redo List of Effective Pages Revision 1 Details Figure 3.5-14 delete drawing title Figure 3.5-21 delete drawing title Figure 3.6-36 delete drawing title Figure 3.5-46 delete drawing title Figure 3.6-50 delete drawing title Figure 3,5-59 delete drawing title Figure 3.6-6 delete drawing title Figure 3.6-7 delete drawing title Figure 3.6-9A delete drawing title Ffgure 3.6-1 IAdelete drawing title Figure 3.6-11B delete drawing title Figure 3.6-12 delete drawing title Figure 3.6-13A delete drawing title Figure 3.6-14A delete drawing title Figure 3.6-14B delete drawing title Figure 3.6-16A delete drawing title Figure 3.6-16B delete drawing title Figure 3.6-17 delete drawing title Figure 3.6-18 delete drawing title
PNS-CI G DOCUMENT <<002-10 REVISION I Rev.
No.
Date 05/10/85 Affected Pages vii-4 (con't) 2-5 3-1 3-56 3-57 thru 3-59 3-68 thru 3-70 Purpose of Revision Figure 3.6-19 delete drawing title Figure 3.10-1 delete drawing title Figure 3.10-2 correct Figure number Delete NOTE Delete NOTE Change 93.1 to address Relief Request applicability per FPL response to NRC Program Question <<1.
Change Class I Relief Request Tables for RR <<S 8 RR <<6.
Change 9D.3 to address Relief Request applicability per FPL response to NRC Progr am Question << I.
Correct exam area coverage X per FPL response to NRC Relief Request Question <<3, Items <<3.10, 3.11, 3.12, 4.10, 4.11, 4.12.
t Address per FPL response to NRC Program Questions <<I &3, Items
<<12.17, IO. I7, 14.17, 13.1, 9.1 & IS.I.
3-71 3-76 3-77 3-78 3-79 3-80 3-91 3-9&
3-113 3-122 Correct Revision Number Address per FPL response to Program Questions << I &3.
Delete Item <<9.1 (Not scheduled for examination).
Delete Item <<10.17 (Not scheduled for examination).
Delete Items <<12.17 8 13.1 (Not scheduled for examination).
Delete Items <<14.17 & I S. I (Not scheduled for examination).
Figure 3.5-14 Drawing Deleted Figure 3.5-2 IDrawing Deleted Ffgure 3.5-36 Drawing Deleted Figure 3.5-45 Drawing Deleted
4l 0
PNS-CI G DOCUMENT <<002-10 REVISION I Rev.
No.
Date Affected Pages Purpose of Revision 05/10/85 3-127 3-136 3-I42 3-IH3 thru 3-152 3-158 3-159 3-161 3-163 3-I60 3-165 3-166 3-168 3-169 3-170 3-171 3-176 3-188 thru 3-189 Figure 3.S-SO Drawing Deleted Figure 3.5-59 Drawing Deleted Add surface examination reference to 1D. "Alternative Examinations" per FPL response to NRC Relief Request Question ~6.
Delete items which are not scheduled for examination per FPL response to NRC Program Question ~1, Items ~6.10,7.7, 7.8, 9.11, 10.1, 11.9, 13.4, 13.9, I W. I, 153, 15.9, 21.6, 21.11, 21.13, 22.3, 22.8, 23.3, 2'I.3, 24.16, 2%.17, 28.23, 28.25, 28.35, 28.51,29.16, 29.26, 29.29, 29.31, 2980, 29AW 8c'29.d7.
Figure 3.6-6 Drawing Deleted Figure 3.6-7 Drawing Deleted Figure 3.6-9A Drawing Deleted Figure 3.6-1 IADrawing Deleted Figure 3.6-1 I B Drawing Deleted Figure 3.6-12 Drawing Deleted Figure 3.6-13A Drawing Deleted Figure 3.6-I WA Drawing Deleted Figure 3.6-14B Drawing Deleted Figure 3.6'-16A Drawing Deleted Figure 3.6-16B Drawing Deleted Figure 3.6-17 Drawing Deleted Figure 3.6-18 Drawing Deleted Figure 3.6-19 Drawing Deleted Change Class 2 Relief Request Table 3.2 to reflect revised quantities for RR ~10 Delete lest two sentencces to address FPL response to NRC question on Relief Request ~9, Items 4'55.3 &55.6.
'0
PNS-CI G DOCUMENT <<002-10 REVISION I
Rev.
No.
Date Affected Pages Purpose of Revision 05/10/85 3-193 Change%. to address Relief Request applicability per FPL response to NRC Program Question ¹ l.
3-194 thru 3-197 3-198 Delete items which are not scheduled for examination per FPL response to NRC Program Question <<1, Items << 'I3.180, 57.25, 58.23, 59.30, 60.36, 60.37, 61.4, 70.33.
Figure 3.10-1 Drawing Deleted.
Address FPL response to NRC Program Question <<6, Items <<1.33 thru I.&).
Address FPL response to NRC Program Question <<5, Item <<186.
Correct Items <<187'& 188 (errata).
2-1 Revise examination schedule, since deferral is not allowed for Upper Head peel segment welds, Items ¹2.2 &2.3.
5-1
'Address ADP 80-00, Items<<5.1 &5.2. Add Note 3.
Address FPL response to NRC Progr am Question <<6, Items <<6.1, 6.2, 6.3, 6,7a &6.12. Address FPL response to NRC Program Question
<<I,item¹ 6.10. Add examination schedule for longitudinal seams, Items ¹6.2 &6.3. (errata).
7.-1 Address FPL response to NRC Progr am Question <<6, Items <<7.1, 7.2,
.7.3, 7.7a &7.12. Address FPL response to NRC Program Question
,¹1',Items <<7.7 &7.8, 8-1 thr u.
8-2 Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<8.1, 8.5, 8,11 &8.17.
Add examination schedule for longitudinal seams, Items <<8.3, 8.4, 8.6 &8.7 ( errata).
Correct Items <<8.17a &8.20 (errata).
9-1 Address FPL response to NRC Progr am Question <<1, Items <<9.1 &
9.12. Add examination schedule for longitudinal seams, Items <<9.3 &
9,W (errata).
10-1
- thru, 10-2 k
Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<10.1, 10.2, 10.3; I O. I0 & 10.15.
vi-4
0 P,'
PNS-CI G DOCUMENT <<002-10 REVISION I Rev.
No.
Date Affected Pages Purpose of Revision 05/10/85 Address FPL response to NRC Program Question ¹1, Item <<11.9.
Add examination schedule for longitudinal seams, Items <<11.3, I I8 (errata).
Address FPL response to NRC Program Question <<6, Item
<<11.8.
12-1 Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<12.1', 12.2 8 12.3.
12-2 Addt ess FPL response to NRC Program Question ¹1, Item <<12.17.
Add examination schedule for longitudinal seams, Items <<12,14 &
'I2.15 (errata).
13-1 ld-I thru I'1-2 Address FPL response to NRC Program Question << I, Items ¹13.1, 13.4 & 13.9.
Address FPL response to NRC Progr am Question <<1, Items <<14.1 &
14.17.
Address FPL response to NRC Program Question <<1, Items <<15,3 8 15.9.
16-1 19-1 21-1 thru 21-3 22-1 thru 22-3 23-1 thru 23-3 Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<16.2, 168, 16.5, 16.7 8 16.8.
Delete examination schedule based on Relief Request <<7, Item <<19.3.
Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<21.3, 21.S, 21.6, 21.9, 21.16, 21.16, 21.19 8 21.23. Address FPL response to NRC Program Question <<1, Items
<<21.6, 21.11 &21.13.
Selectfon redistribution based on Stress Intensity/Cumulative Usage Factor, Items ¹22.5, 22.16 &22.21.
Address FPL response to NRC Program Question <<1, Items <<22.3 &22.8.
Selectfon redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<23.2, 23,3, 23.5, 23.8, 23.9, 23.10, 23.11, 23.12, 23.13, 12.15, 23.16, 23.20, 23.22, 23.27 8 23.28..
Address FPL response to NRC Program Questfon <<1, Item <<23.3.
Delete examination schedule for B-M-2 examinations based on Relief Request <<7, Items <<23.W, 23.23 8 23.33.
PNS-CIG DOCUMENT <<002-I 0 REVISION I Rev.
No.
Date Affected Pages Purpose of Revision 1
05/10/85 2&1 thru 2 I-3 25-1 thru 25-2 26-I thru 26-2 27-1 thru 27-2 28-1 28-3 thru 28-5 28-6 29-1 thru 29-4 30-1 thru 30-3 31-1 thru 31-2 32-1 Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<24.5., 24.18, 24.20 &2d.23.
Address FPL response to NRC Program Question <<1, Items <<203, 20.16 &24.17.
Add Notes 7) &8). Clarify EXAMINATIONAREA DESCRIPTION, Item
<<25.14.
Add Schedule to balance representative weld joint sampling, Item <<25.13.
Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<26.1 thru 26.7, 26.9, 26.11, 26.12, 26.18, 26.19, 26.25 &26.26. Clarify EXAMINATIONAREA DESCRIPTION, Items <<26.27 &26.28.
Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<27.9, 27.10, 27.16, 27.17, 27.18 &27.19.
Clarify EXAMINATIONAREA DESCRIPTION, Items <<27.27 &27.28.
Add UT.EXAMINATION,PROCEDURE, CAL BLK., Item <<28.2 Delete Code Item <<B-M-2 examination schedule based on Relief Request <<7, Items <<28.24, 28.52. Address FPL response to NRC Program Question << I, Items <<28.23, 28.25, 2835 &28.51.
Add NOTE 13 (Page 28-4).
Correct EXAMINATIONAREA IDENTIFICATION,Item <<28.59 Address FPL response to NRC Program Question <<1, Items <<29.16, 29.26, 29.29, 29.31, 29 IO, 29. I'I&29.'l7.
Selection redfstrfbutfon based on Stress Intensity/Cumulative Usage Factor, Items <<30.2, 30.7, 30.16, 30.17, 30.19, 30.20, 30.21.
30.23 thru 30.28, 30.30 &30.31.
Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<31.7, 31.10, 31.11, 31.10, 31.15, 31.18 &31.20 thru 31.28.. Add examination schedule for Category B-F weld Item
<<31.26 (errata).
Selection redfstributfon based on Stress Intensity/Cumulative Usage Factor, Items <<32.7, 32.9, 32.13, 32.14 &32.15.
PNS-CI G DOCUMENT 002-I 0 REVISION. l Rev.
No.
Date 05/10/85 Affected Pages 32-3 35-1 37-1 thru 37-3 38-1 thru 38-2 hBESDHLL" 41-1 42-1 43-2 43-13 SS-I 56-1 57>>2 58-2 59-2 Purpose of Revision Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<32.40, 32 45, 32.46 &32.50.
Add Category B-F weld examination schedule, Item <<33.1a (errata)
Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<35.1 thru 35.4. Revise Category B-F weld examination schedule, Item 35. I a.
Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<37.1 thru 37.13, 37.15, 37.17 &37.35 thru 37.40.
Selection redistribution based on Stress Intensity/Cumulative Usage Factor, Items <<38.4, 38.8, 38.9, 38.13 thru 38.18 &38.22.
Delete Notes 8) &9). Delete items 41.10 & 41.11 (moved to Zones 63 &67, respectively).
Delete Notes 8) &9). Delete items 42.10 &42.11 (moved to Zones 64 &68, respectively).
Add examination schedule, Item 43.1.
Add examination schedule, Item 43.18.
Address FPL response to NRC Program Question <<1, Item <<43.180.
Delete examination schedule, Items <<44.1 &44.2. (See 2one 43.1).
Addl1T EXAt1INATION,PROCEDURE &schedule per FPL response to NRC Question on Relief Request <<9, Items 55.3 &S5.6.
Add MT EXAMINATION&PROCEDURE per FPL response to NRC Questfon on Relfef Request <<9, Items 563 &56.6.
No examination scheduled)
Address FPL response to NRC Progr am Question <<I, Item <<57.25.
Address FPL response to NRC Program Question << I, Itern <<58;23.
Address FPL response to NRC Program Question << I, Item <<59.30.
PNS-CIG DOCUMENT <<002-10 BEV5S50N l Rev.
No.
Date Affected Pages Purpose of Revision 1
OS/10/85 60-2 thru 60-3 Address FPL response to NRC Program Question <<1, Item <<60;34, 60.36 8c 60.37.
61-1 63-1 61-I thru 60-5 65-2 67-1 thru 67-2 70-2 7d-12 77-2 79-1 Address FPL response to NRC Program Question << I, Item <<61.9.
Add Item <<63.1a (moved from Zone 41.10). Cleriiy EXAMINATION AREA DESCRIPTION, Item <<63.1
~
Add Itern <<60.1a (moved from Zone 02.50). Clarify EXAMINATION AREA DESCRIPTION, Item <<64,1.
Add EXAMINATIONMETHOD, PROCEDUR &CAL. BLK.&schedule to Item <<64-57.
Add examination schedule, item <<65.27.
Change examinat1on schedule, Items <<67.12 &67.13.
Address FPL response to NRC Program Question <<1, Item <<7033.
Add examination schedule, Items <<74. 587a &74.188a (errata).
Delete examination schedule, Items <<77.22 Add examination schedule, Item <<79.12.
Pgyfk Revision l Prepared by:
P.M. Heycock, ISl Coordinator, St. Lucie Plant Revision l Approved. by.
ate.
G. Gotch, Supervisor PN -Codes and Inspections Section vi-8
P