Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-93-152, Monthly Operating Repts for May 1993 for St Lucie,Units 1 & 2 + (18:51:26, 8 January 2025)
- 05000389/LER-1993-006, :on 930513,EDG 2B Inadvertently Started During Safeguards Relay Testing Due to Personnel Error.Personnel Performing Test Counseled on Communications & Safeguards Relay Testing Completed Satisfactorily + (18:51:29, 8 January 2025)
- IR 05000335/1993014 + (18:51:31, 8 January 2025)
- ML17228A180 + (18:51:32, 8 January 2025)
- ML17228A177 + (18:51:33, 8 January 2025)
- IR 05000335/1993013 + (18:51:35, 8 January 2025)
- ML17228A172 + (18:51:36, 8 January 2025)
- L-93-122, Application for Amends to Licenses DPR-67 & NPF-16, Changing Surveillance Interval Specified for Performing Air or Smoke Flow Test Through Containment Spray Headers from 5 to 10 Yrs + (18:51:37, 8 January 2025)
- ML17228A169 + (18:51:37, 8 January 2025)
- IR 05000335/1993011 + (18:51:42, 8 January 2025)
- ML17228A163 + (18:51:43, 8 January 2025)
- IR 05000335/1993010 + (18:51:46, 8 January 2025)
- L-93-135, Forwards 5-yr Technology Review Rept for State Certification FL0002208 for 1988-1992,consisting of Info Re Liquid Effluents,Liquid Effluent Assessment & Airborne Effluents + (18:51:48, 8 January 2025)
- ML17228A160 + (18:51:48, 8 January 2025)
- 05000335/LER-1993-004-02, :on 930409,typo Discovered in Rept Used to Determine RPS Low RCS Flow Trip Setpoint.Error Existed Since Aug 1988.Caused by Design Control Inadequacy.Engineering Package Developed to Correct Calculations + (18:51:53, 8 January 2025)
- IR 05000335/1993009 + (18:51:58, 8 January 2025)
- L-93-118, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-389/93-08.C/As:mechanical Maint Will Revise Control of Purchase Matl,Equipment & Svcs to Establish Specific Guidelines Re Quality Review of Contractor Procedures + (18:51:59, 8 January 2025)
- ML17228A154 + (18:52:03, 8 January 2025)
- ML17228A153 + (18:52:04, 8 January 2025)
- L-93-136, Monthly Operating Repts for Apr 1993 for St Lucie,Units 1 & 2 + (18:52:05, 8 January 2025)
- IR 05000335/1993007 + (18:52:13, 8 January 2025)
- ML17228A149 + (18:52:15, 8 January 2025)
- L-93-120, Submits Listed SG Tubes Plugging Rept for Spring 1993 Refueling Outage + (18:52:16, 8 January 2025)
- L-93-130, Advises of Licensee Plan to Submit Update to Unit 2 FSAR on 930924,per Ja Norris & RW Grazio Discussion + (18:52:21, 8 January 2025)
- ML17228A145 + (18:52:21, 8 January 2025)
- L-93-100, Responds to NRC Ltr Re Violations Noted Insp Rept 50-389/93-05.Corrective Actions:Procedures Have Been Modified to Clearly Define Required post-test Position & Require sign-off for Each Step of post-test Sequence + (18:52:23, 8 January 2025)
- L-93-121, Corrects Statement in Util Re June 1993 Emergency Exercise.Ltr Incorrectly Stated That Exercise Would Be Evaluated by Fema,However,Fema Will Not Conduct Evaluation + (18:52:24, 8 January 2025)
- L-93-113, Vols 1 & 2 to St Lucie,Unit 2 Annual Environ Operating Rept,1992, Consisting of Info Re Sea Turtle Refuge.W/ + (18:52:26, 8 January 2025)
- L-93-101, Forwards Modified Relief Request VR-22 for Check Valves V-07269 & V-07270 for Approval.Util Has Determined Per 10CFR50.a(a)(3) That Proposed Alternatives Would Provide Acceptable Level of Quality & Safety + (18:52:28, 8 January 2025)
- L-93-102, Special Rept:On 930310,longitudinal Channel of Common Seismic Monitor Recorder & Indicator Declared Out of Svc & Remained Out of Svc Longer than Allowed by Ts.Util Awaiting Repairs to Instruments by Vendor + (18:52:30, 8 January 2025)
- 05000335/LER-1993-003-02, :on 930331,1B EDG Inadvertently Started.Caused by Personnel Error.Personnel Involved in Event Counseled About Necessity of Being Careful When Working in & Around Sensitive Equipment + (18:52:32, 8 January 2025)
- ML17228A128 + (18:52:34, 8 January 2025)
- IR 05000335/1993008 + (18:52:36, 8 January 2025)
- ML17228A126 + (18:52:38, 8 January 2025)
- ML17228A124 + (18:52:39, 8 January 2025)
- IR 05000335/1993005 + (18:52:45, 8 January 2025)
- ML17228A106 + (18:52:46, 8 January 2025)
- IR 05000188/2017201 + (18:52:48, 8 January 2025)
- IR 05000188/2017202 + (18:52:49, 8 January 2025)
- NRC-17-0056, Supplemental Information Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-545, Revision 3 + (18:52:50, 8 January 2025)
- NRC-17-0054, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 + (18:52:50, 8 January 2025)
- IR 05000333/2017404 + (18:52:52, 8 January 2025)
- IR 05000219/2017404 + (18:52:53, 8 January 2025)
- ML17228A048 + (18:52:53, 8 January 2025)
- NL-17-096, Supplemental Information for License Amendment Request - Cyber Security Plan Implementation Schedule + (18:52:54, 8 January 2025)
- 05000461/LER-1917-008, Re Division 3 Shutdown Service Water Pump Start Failure + (18:52:59, 8 January 2025)
- MNS-17-037, Submittal of Summary Report of Evaluations Performed Pursuant to 10 CFR 50.59 Changes, Tests, and Experiments During the Period from January 1, 2016 to March 31, 2017 + (18:53:02, 8 January 2025)
- NLS2017048, Submittal of Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control + (18:53:02, 8 January 2025)
- ML17228A037 + (18:53:04, 8 January 2025)
- ML17228A032 + (18:53:04, 8 January 2025)
- IR 05000247/2017403 + (18:53:05, 8 January 2025)