MONTHYEARML17241A3541999-06-0101 June 1999 Proposed Tech Specs Section 3.5.2,allowing Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17241A3451999-05-24024 May 1999 Proposed Tech Specs 3/4.5.1 Re Safety Injection Tanks ML17229B0711999-03-19019 March 1999 Proposed Tech Specs Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity, Per Soluble Boron Credit ML17229B0201999-02-23023 February 1999 Proposed Tech Specs 3/4.1.2.9 Re Reactivity Control sys- Boron Dilution ML17229A9551998-12-16016 December 1998 Proposed Tech Specs Pages Revising Administrative Controls & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9161998-11-25025 November 1998 Proposed Tech Specs Pages,Replacing Insert-A,attachment to 971231 Submittal & Revises LCO 3.4.9.11 & Associated Bases ML17229A9251998-11-22022 November 1998 Proposed Tech Specs Revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9131998-11-19019 November 1998 Proposed Tech Specs,Revising Administrative Contols TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML20155C3061998-10-29029 October 1998 Proposed Tech Specs Pages Revising Terminology Used in Notation of TS Tables 2.2-1 & 3.3-1 Re Implementation & Automatic Removal of Certain Reactor Protection Sys Trip Bypasses ML17229A8441998-08-24024 August 1998 Proposed Tech Specs Removing Obsolete License Conditions & Incorporating Revs Which Clarify Component Operations That Must Be Verified in Response to Containment Sump Recirculation Actuation Signal ML17229A7731998-06-15015 June 1998 Proposed Tech Specs Pages 6-20,6-20a & 6-20c,correcting Info Supplied by Fuel Vendor Relative to Titles of Approved TRs That Are Referenced in Proposed TS 6.9.1.11.b ML17229A7601998-06-0303 June 1998 Proposed Marked Up TS Pages Modifying Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 to Provide for Use of Lab Gas Partitioner to Periodically Analyze Concentration of Oxygen in Svc Waste Gas Decay Tank ML17229A7511998-05-27027 May 1998 Proposed Tech Specs Section 6.2.2.f,revised to Allow for Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A7481998-05-27027 May 1998 Proposed Tech Specs Section 3.5.1,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7441998-05-27027 May 1998 Proposed Tech Specs Providing for More Efficient Use of on- Site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A6501998-03-0303 March 1998 Proposed Tech Specs 3.4.7 Re RCS Chemistry/Design Features/ Administrative Controls ML17229A5691997-12-31031 December 1997 Proposed Tech Specs Pages Modifying TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9131997-12-29029 December 1997 Proposed Tech Specs Modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5491997-12-0101 December 1997 Proposed Tech Specs Revising Units 1 & 2 EPP Section 4, Environ Conditions & Section 5, Administrative Procedures to Incorporate Proposed Terms & Conditions of Incidental Take Statement Included in Biological Opinion ML17229A4621997-08-22022 August 1997 Proposed Tech Specs Pages,Revising Specification 4.0.5 Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Control Section 6.8 ML17229A4341997-08-0101 August 1997 Proposed Tech Specs,Extending semi-annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 & Associated SE ML17229A3601997-05-29029 May 1997 Proposed Tech Specs Incorporating Administrative Changes That Improve Consistency Throughout TSs & Related Bases ML17229A1831996-12-20020 December 1996 Proposed Tech Specs Re Safety Limits & Limiting Safety Sys Settings ML17229A1611996-12-0909 December 1996 Proposed Tech Specs 1.9a Re Core Operating Limits Rept ML17229A1191996-10-31031 October 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML17229A1111996-10-30030 October 1996 Proposed Tech Specs 3/4.9.9 Re Containment Isolation Sys & 3/4.9.10 Re Water level-reactor Vessel ML17229A1091996-10-28028 October 1996 Proposed Tech Specs Rev to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A1061996-10-28028 October 1996 Proposed Tech Specs 1.6 Re Channel Functional test,1.7 Re Containment Vessel integrity,1.8 Re Controlled leakage,1.9 Re Core alteration,3/4.6 Re Containment Systems & 3/4.6.1 Re Containment Vessel ML17228B5641996-07-15015 July 1996 Revised Tech Specs Re Core Alteration Definition ML17228B5041996-06-0101 June 1996 Proposed Tech Specs Re Thermal Margin & RCS Flow Limits ML17228B3761996-01-0404 January 1996 Proposed Tech Specs Rectifying Discrepancy for Each St Lucie Unit & Providing Assurance That Admin Controls for Hpsip Remain Effective in Lower Operational Modes ML17228B3361995-11-22022 November 1995 Proposed TS 3/4.4.6.1 for RCS Leakage Detection Instrumentation,Adapting STS for C-E Plants (NUREG-1432) Spec 3.4.15 ML17228B2451995-08-16016 August 1995 Proposed TS 3.6.6.1, Sbvs. ML17228B2421995-08-16016 August 1995 Proposed Ts,Reflecting Relocation of Selected TS Requirements Re Instrumentation & Emergency & Security Plan Review Process,Per GL 93-07 ML17228B1891995-06-21021 June 1995 Proposed Tech Specs Re Safety Injection Tank Surveillances ML17228B1811995-06-21021 June 1995 Proposed Tech Specs Re Time Allowed to Restore Inoperable LPSI Train to Operable Status ML17228B1791995-06-21021 June 1995 Proposed Tech Specs Re Extended Allowed Outage Time for EDGs ML17228B1471995-05-17017 May 1995 Proposed Tech Specs,Extending Applicability of Current RCS Pressure/Temp Limits & Maximum Allowed RCS Heatup & Cooldown Rates to 23.6 Effective Full Power Yrs of Operation ML17228B1441995-05-17017 May 1995 Proposed Tech Specs Re Administrative & Conforming Update ML17228B0901995-04-0303 April 1995 Proposed Tech Specs Re Incorporation of line-item TS Improvements to TSs 3/4.8.1 & 4.8.1.2.2 for Licenses DPR-67 & NPF-16 ML17228B0591995-02-27027 February 1995 Proposed TS Re Sdcs Min Flow Rate Requirements ML17228B0521995-02-27027 February 1995 Proposed Tech Spec Tables 3.3-3 & 3.3-4 to Accommodate Improved Coincidence Logic & Relay Replacement for 4.16 Kv Loss of Voltage Relays ML17228B0331995-02-22022 February 1995 Proposed TS 4.6.1.3,reflecting Deletion of Refs to Automatic Tester for Containment Personnel Air Lock ML17228A9921995-01-20020 January 1995 Proposed Tech Specs,Relocating Operability Requirements for Incore Detectors to (TS 3/4.3.3.2) to Updated FSAR & Revising Lhr Surveillance 4.2.1.4 & Special Test Exceptions Surveillance 4.10.2.2,4.10.4.2 & 4.10.5.2 ML17228A9031994-11-0202 November 1994 Proposed Tech Specs 3/4.6.2.1 & 3/4.6.2.3,adapting Combined Spec for Containment Spray & Cooling Sys Contained in Std TS for C-E Plants ML17228A8911994-10-27027 October 1994 Proposed Tech Specs,Incorporating Administrative Changes ML17228A6521994-07-28028 July 1994 Proposed Tech Specs Re LTOP Requirements for Power Operated Relief Valves,Per GL 90-06 ML17228A6591994-07-25025 July 1994 Proposed Tech Specs Implementing Enhancements Recommended by GL 93-05, Line-Item TS Improvements to Reduce SR for Testing During Power Operation. ML17228A6561994-07-25025 July 1994 Proposed Tech Specs for Main Feedwater Line Isolation Valves to Be Consistent w/NUREG-1432,standard TS for C-E Plants ML17228A5771994-05-23023 May 1994 Proposed Tech Specs Removing Option That Allows HPCI Pump 1C to Be Used as Alternative to Preferred Pump for Subsystem Operability 1999-06-01
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17309A9961999-06-30030 June 1999 Rev 35 to HP-90, Emergency Equipment. ML17309A9941999-06-17017 June 1999 Rev 1 to COP-06.06, Guidelines for Collecting Post Accident Samples. ML17241A3541999-06-0101 June 1999 Proposed Tech Specs Section 3.5.2,allowing Up to 7 Days to Restore Inoperable LPSI Train to Operable Status ML17309A9951999-05-27027 May 1999 Rev 0 to COP-06.11, Establishing Remote Lab for Analyses of Accident Samples. ML17241A3451999-05-24024 May 1999 Proposed Tech Specs 3/4.5.1 Re Safety Injection Tanks ML17229B0711999-03-19019 March 1999 Proposed Tech Specs Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity, Per Soluble Boron Credit ML17229B0441999-03-0202 March 1999 Cycle 11 Reactor Startup Physics Testing Rept. with 990304 Ltr ML17229B0201999-02-23023 February 1999 Proposed Tech Specs 3/4.1.2.9 Re Reactivity Control sys- Boron Dilution ML17229B0361998-12-22022 December 1998 Rev 20 to Procedure C-200, Odcm. ML17229A9551998-12-16016 December 1998 Proposed Tech Specs Pages Revising Administrative Controls & Incorporating Specific Staff Qualifications for Multi- Discipline Supervisor Position ML17229A9161998-11-25025 November 1998 Proposed Tech Specs Pages,Replacing Insert-A,attachment to 971231 Submittal & Revises LCO 3.4.9.11 & Associated Bases ML17229A9251998-11-22022 November 1998 Proposed Tech Specs Revising Thermal Margin SL Lines of TS Figure 2.1-1 to Reflect Increase in Value of Design Min RCS Flow from 345,000 Gpm to 365,000 Gpm & Change Flow Rates Stated in Tables 2.2-1 & 3.2-1 ML17229A9131998-11-19019 November 1998 Proposed Tech Specs,Revising Administrative Contols TS 6.3, Unit Staff Qualifications & Incorporating Specific Staff Qualifications for Multi-Discipline Supervisor (MDS) Position ML20155C3061998-10-29029 October 1998 Proposed Tech Specs Pages Revising Terminology Used in Notation of TS Tables 2.2-1 & 3.3-1 Re Implementation & Automatic Removal of Certain Reactor Protection Sys Trip Bypasses ML20153G0781998-08-26026 August 1998 Rev 19 to Plstqp, Guard Training & Qualification Plan ML17229A8441998-08-24024 August 1998 Proposed Tech Specs Removing Obsolete License Conditions & Incorporating Revs Which Clarify Component Operations That Must Be Verified in Response to Containment Sump Recirculation Actuation Signal ML17229A7731998-06-15015 June 1998 Proposed Tech Specs Pages 6-20,6-20a & 6-20c,correcting Info Supplied by Fuel Vendor Relative to Titles of Approved TRs That Are Referenced in Proposed TS 6.9.1.11.b ML17229A7601998-06-0303 June 1998 Proposed Marked Up TS Pages Modifying Explosive Gas Mixture Surveillance Requirement 4.11.2.5.1 to Provide for Use of Lab Gas Partitioner to Periodically Analyze Concentration of Oxygen in Svc Waste Gas Decay Tank ML17229A7441998-05-27027 May 1998 Proposed Tech Specs Providing for More Efficient Use of on- Site Mgt Personnel in Review & Approval Process for Plant Procedures ML17229A7481998-05-27027 May 1998 Proposed Tech Specs Section 3.5.1,removing Requirement for SITs to Be Operable in Mode 4,which Will Minimize Potential for Inadvertent SIT Discharge During RCS Cooldown/ Depressurization Evolutions ML17229A7511998-05-27027 May 1998 Proposed Tech Specs Section 6.2.2.f,revised to Allow for Use of Longer Operating Shifts of Up to Twelve Hours Duration by Plant'S Operating Crews ML17229A6751998-03-27027 March 1998 Cycle 15 Reactor Startup Physics & Replacement SG Testing Rept. W/980402 Ltr ML17229A6501998-03-0303 March 1998 Proposed Tech Specs 3.4.7 Re RCS Chemistry/Design Features/ Administrative Controls ML17229A6381998-02-12012 February 1998 Rev 19 to C-200, Offsite Dose Calculation Manual. ML17229A6151998-01-12012 January 1998 Rev 0 to ISI-PSL-1, St Lucie Nuclear Plant Unit 1 ISI Plan. ML17229A6141998-01-12012 January 1998 Rev 0 to ISI-PSL-1, Third Interval ISI Program for St Lucie Nuclear Power Plant,Unit 1. ML17229A5691997-12-31031 December 1997 Proposed Tech Specs Pages Modifying TS 5.6.1 & Associated Figure 5.6-1 & TS 5.6.3 to Accomodate Increase in Allowed SFP Storage Capacity ML17309A9131997-12-29029 December 1997 Proposed Tech Specs Modifying Specifications for Selected cycle-specific Reactor Physics Parameters to Provide Reference to St Lucie Unit 2 COLR for Limiting Values ML17229A5851997-12-12012 December 1997 Rev 0 to ADM-29.01, IST Program for Pumps & Valves. ML17229A5491997-12-0101 December 1997 Proposed Tech Specs Revising Units 1 & 2 EPP Section 4, Environ Conditions & Section 5, Administrative Procedures to Incorporate Proposed Terms & Conditions of Incidental Take Statement Included in Biological Opinion ML17309A9171997-11-26026 November 1997 Rev 0 to PSL-ENG-SENS-97-068, Spent Fuel Pool Dilution Analysis. ML17229A5931997-09-26026 September 1997 Rev 4 to Procedure QI-5-PSL-1, Preparation,Rev,Review/ Approval of Procedures. ML17229A5921997-09-18018 September 1997 Rev 0 to Procedure ADM-17.11, 10CFR500.59 Screening. ML20211Q5841997-09-10010 September 1997 Rev 18 to Training & Qualification Plan ML17229A4621997-08-22022 August 1997 Proposed Tech Specs Pages,Revising Specification 4.0.5 Surveillance Requirements for ISI & Testing of ASME Code Class 1,2 & 3 Components,To Relocate IST Program Requirements to Administrative Control Section 6.8 ML17229A4341997-08-0101 August 1997 Proposed Tech Specs,Extending semi-annual Surveillance Interval Specified in Table 4.3-2 for Testing ESFAS Subgroup Relays to Interval Consistent W/Ceog Rept CEN-403,Rev 1-A for March 1996 & Associated SE ML17309A8951997-06-11011 June 1997 Rev 0 to PL-CNSI-97-004, Transportation & Emergency Response Plan for St Lucie Unit 1 SG Project. ML17229A3601997-05-29029 May 1997 Proposed Tech Specs Incorporating Administrative Changes That Improve Consistency Throughout TSs & Related Bases ML17229A2981997-03-0606 March 1997 Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 NPP Using NUREG-0800 Std Review Plan 15.1.5 App A. ML17229A1831996-12-20020 December 1996 Proposed Tech Specs Re Safety Limits & Limiting Safety Sys Settings ML17229A1611996-12-0909 December 1996 Proposed Tech Specs 1.9a Re Core Operating Limits Rept ML17229A1191996-10-31031 October 1996 Proposed Tech Specs 6.0 Re Administrative Controls ML17229A1111996-10-30030 October 1996 Proposed Tech Specs 3/4.9.9 Re Containment Isolation Sys & 3/4.9.10 Re Water level-reactor Vessel ML17229A1061996-10-28028 October 1996 Proposed Tech Specs 1.6 Re Channel Functional test,1.7 Re Containment Vessel integrity,1.8 Re Controlled leakage,1.9 Re Core alteration,3/4.6 Re Containment Systems & 3/4.6.1 Re Containment Vessel ML17229A1091996-10-28028 October 1996 Proposed Tech Specs Rev to Allow Type A,B & C Containment Leakage Tests to Be Conducted at Extended Intervals Determined by performance-based Criteria ML17229A0951996-10-24024 October 1996 Rev 0 to 00000-OSW-16, In-Situ Pressure Test Results for St Lucie Unit 1 Spring 1996 Outage. ML17229A0861996-10-18018 October 1996 Startup Physics Testing Rept. W/961018 Ltr ML17229A2441996-09-23023 September 1996 Rev 18 to Offsite Dose Calculation Manual (Odcm). ML17228B5641996-07-15015 July 1996 Revised Tech Specs Re Core Alteration Definition ML17229A0961996-06-12012 June 1996 Rev 0 to TR-9419-CSE96-1101, Test Rept - SG Tube In-Situ Hydrostatic Pressure Test Tool Hydro Chamber Pressure Determination. 1999-06-30
[Table view] |
Text
St. Lucie Unit 1 and Unit 2 Docket Nos. 50-335 and 50-389 Proposed License Amendments Containment S ra S stem Surveillance Re uirements ATTACHMENT 1 ST. LUCIE UNIT 1 MARKED>>UP TECHNICAL SPECIFICATION PAGE Page 3/4 6-16 F'DR 9305280323 05000 PDR ADOCK ~0335
CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS (Continued
- c. At least once per 18 months, during shutdown, by:
- 1. Verifying that each automatic valve in the flow path actuates to its correct position on a CSAS test signal.
- 2. Ver'ifying that each sp~ay pump starts automatically on a CSAS test signal.
- 3. Verifying that upon a recirculation actuation signal, the containment sump isolation valves open and that a recirculation mode flow path via an OPERABLE shutdown fO "~mt cooling heat exchanger is established.
- d. At least once per years by performing an air or smoke flow test through each spray header and verifying each spray nozzle is unobstructed.
ST. LUCIE - UNIT 1 3/4 6-16 Amendment No. 90
St. Lucie Unit 1 and Unit 2 Docket Nos. 50-335 and 50-389 Proposed License Amendments Containment S ra S stem Surveillance Re uirements ATTACHMENT 2 ST. LUCIE UNIT 2 MARKED-UP TECHNICAL SPECIFICATION PAGE Page 3/4 6-16
CONTAINMENT SYSTEMS SURVEILLANCE RE UIREMENTS (Continued)
Verifying that each spray pump starts automatically on a CSAS test signal.
- d. At least once per+years by performing an air or smoke flow test through each spray header and verifying each spray nozzle is unobstructed.
ST. LUCIE " UNIT 2 3/4 '-'16
St. Lucie Unit 1 and Unit 2 Docket Nos. 50-335 and 50-389 Proposed License Amendments Containment S ra S stem Surveillance Re uirements ATTACHMENT 3 EVALUATXON OF PROPOSED TS CHANGES
St. Lucie Unit 1 and Unit 2 L-93-122 Docket Nos. 50-335 and 50-389 Attachment 3 Proposed License Amendments Page 1 of 2 Containment S ra S stem Surveillance Re uirements EVALUATION OF PROPOSED TS CHANGES Introduction Florida Power and Light Company (FPL) proposes to change St. Lucie Unit 1 and St. Lucie Unit 2 Technical Specifications (TS) for the Containment Spray (CS) System. The revision will extend the surveillance interval for performing an air or smoke flow test through each spray header to verify that each spray nozzle is unobstructed. FPL considers the change to be a line-item improvement to the existing facility TS.
Descri tion of Chan e f
TS 4.6.2.1.d is revised by changing the required surveillance interval from "once per 5 years" to read "once per 10 years".
Justification for TS Chan e Existing TS 4.6.2.1.d requires that the Containment Spray System be demonstrated operable at least once per 5 years by performing an air or smoke flow test through each spray header and verifying that each spray nozzle is unobstructed. This testing yields no quantitative data on flowrates exiting the spray nozzles and only verifies that there is flow. The NRC Staff searched for problems that have been revealed by means of this testing and determined that the only problems found in PWR containment spray systems were those that were construction related.
Based on this investigation and other screening criteria established for evaluating surveillance requirements, the Staff recommended that this test interval be extended to once every 10 years (NUREG-1366: December, 1992) .
Surveillance air flow tests were performed at St. Lucie Unit 1 in 1980, 1985, 1990 and 1991. Infra-red Thermography was used for flow verification and all tests clearly demonstrated that obstructions did not exist for any of the 357 nozzles involved. A surveillance air flow test performed at St. Lucie Unit 2 in 1987 revealed an obstruction in one spray nozzle. The cause of this obstruction was determined to be a small piece of rubber from the temporary hose used to deliver air to the spray header for this specific test, and the obstruction was thereby introduced into the system by the test itself. Therefore, FPL considers that the findings and recommendations of NUREG-1366 with respect to the containment spray header air or smoke flow test are compatible with plant operating experience at both St. Lucie Units 1 and 2.
St. Lucie Unit 1 and Unit 2 L-93-122 Docket Nos. 50-335 and 50-389 Attachment 3 Proposed License Amendments Page 2 of 2 Containment S ra S stem Surveillance Re uirements On June 11, 1991, a utility reported to the NRC that a containment spray system (CSS) air flow test indicated that several nozzles were blocked.
Investigation of this incident revealed that the obstructions were the result of a material that had been applied as a coating to that utility's carbon steel CSS piping 14 years earlier (Ref: 58 FR 16881 No.
60; 3/31/93) . The containment spray header piping and spray nozzles at St. Lucie Units 1 and 2 are constructed of stainless steel and do not contain any additional protective coating. Thus, the incident involving coated, carbon steel piping is not applicable to the St.. Lucie containment spray systems and FPL considers that the bases (NUREG-1366) for the Staff recommendation to extend the smoke or air flow test interval to 10 years is applicable to both Units 1 and 2.
The proposed interval for the containment spray header smoke or air flow test is consistent with the revised Standard Technical Specifications for Combustion Engineering Plants, NUREG-1432, wherein the 10 year interval is considered adequate due to the passive design of the spray nozzles. Additional surveillance requirements and frequencies, apart from the smoke or air flow test, presently specified in the St. Lucie plant TS for the Containment Spray System are also consistent with NUREG-1432.
Based on the considerations discussed above, FPL considers the proposed change to St. Lucie Unit 1 and Unit 2 TS to be acceptable.
St. Lucie Unit 1 and Unit 2 Docket Nos. 50-335 and 50-389 Proposed License Amendments Containment S ra S stem Surveillance Re uirements ATTACHMENT 4 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION
St. Lucie Unit 1 and Unit 2 L-93-122 Docket Nos. 50-335 and 50-389 Attachment 4 Proposed License Amendments Page 1 of 2 Containment S ra S stem Surveillance Re uirements DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION Pursuant to 10CFR50.92, a determination may be made that a proposed license amendment involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety. Each standard is discussed as follows:
(1) Operation of the facility in accordance with the proposed amendment would not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed amendment extends the surveillance interval required for performing a qualitative smoke or air flow test on the Containment Spray headers. This surveillance test is not designed to track degradation of equipment by monitoring or trending performance and, therefore, does not necessarily predict the adequacy or future operability of the spray system. Assumptions made in the plant safety analyses involving operability of the Containment Spray System to mitigate the consequences of an accident are not changed. Therefore, operation of the facility in accordance with the proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.
(2) Operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed amendment will not change the physical plant or the modes of plant operation defined in the Facility License. Therefore, operation of the facility in accordance with the proposed amendment would not create the possibility of a new or different kind of accident from any accident previously evaluated.
St. Lucie Unit 1 and Unit 2 L-93-122 Docket Nos. 50-335 and 50-389 Attachment 4 Proposed License Amendments Page 2 of 2 Containment S ra S stem Surveillance Re uirements (3) Operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety.
The revised surveillance interval proposed by this submittal will not change or otherwise influence the degree of operability assumed for the Containment Spray System in the plant safety analyses. The basis for any Technical Specification that is related to the establishment of or maintenance of a nuclear safety margin is likewise unchanged.
Therefore, operation of the facility in accordance with the proposed amendment would not involve a significant reduction in a margin of safety.
Based on the discussion presented above and on the supporting Evaluation of Proposed TS Changes, FPL has concluded that this proposed license amendment involves no significant hazards consideration.