Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17229A018 + (18:27:51, 8 January 2025)
- ML17229A017 + (18:27:53, 8 January 2025)
- ML17229A016 + (18:27:58, 8 January 2025)
- ML17229A014 + (18:27:59, 8 January 2025)
- ML17229A013 + (18:28:00, 8 January 2025)
- ML17229A010 + (18:28:01, 8 January 2025)
- ML17229A009 + (18:28:03, 8 January 2025)
- ML17229A007 + (18:28:04, 8 January 2025)
- 05000335/LER-1996-009, :on 960710,operation Prohibited by Tss.Caused by Procedural Inadequacy & Personnel Error.C/As:Rev of Maint Procedures to Include Verification That Plant Conditions IAW TS Requirements Prior to Installation + (18:28:08, 8 January 2025)
- L-96-202, Monthly Operating Repts for Jul 1996 for St Lucie Units 1 & 2 + (18:28:09, 8 January 2025)
- L-96-197, Responds to Violations Noted in Insp Repts 50-335/96-08 & 50-389/96-08.Investigated Proposed Violation & Denies Violation + (18:28:12, 8 January 2025)
- PNO-II-96-057A, on 960814,FPL Conducted Audit of All Accessible Locked Valve Locks on Both Units,No Addl Examples of Tampering Identified.Reward for Info Leading to Arrest of Responsible Individual Offered.Enhanced Security in Effect + (18:28:16, 8 January 2025)
- PNO-II-96-057, on 960814,licensee Reported Tampering on Three Hot Shutdown Panel Key Lock Switches.Tampering Involved Introduction of Foreign Matl Into Key Switches Disabling Use.Replacement of Affected Switches in Progress + (18:28:18, 8 January 2025)
- 05000335/LER-1996-008, :on 960703,inadvertent Actuation of Safety Injection Actuation Signal & Containment Isolation Signal Occurred Due to Loss of 15 Vdc Regulated Power Supply During Maint.Design Review Performed + (18:28:19, 8 January 2025)
- L-96-191, Responds to RAI Concerning GL 95-07, Pressure Locking & Thermal Binding of SR Power Operated Gate Valves. Summary of Requested Calculation Encl + (18:28:20, 8 January 2025)
- ML17228B586 + (18:28:22, 8 January 2025)
- ML17228B584 + (18:28:23, 8 January 2025)
- ML17228B583 + (18:28:24, 8 January 2025)
- ML17228B581 + (18:28:25, 8 January 2025)
- TAC:M92734 + (18:28:26, 8 January 2025)
- ML17228B580 + (18:28:27, 8 January 2025)
- ML17228B579 + (18:28:30, 8 January 2025)
- L-96-187, NPDES Noncompliance Notification:On 960603,effluent Ph of Unit 1 Sewage Treatment Plant Observed to Be 4.03 Std Units. Util Believes Increased Numbers of Personnel at Site During Refueling Outage Resulted in Extra Loading + (18:28:31, 8 January 2025)
- ML17228B577 + (18:28:31, 8 January 2025)
- L-96-192, Requests Approval,Prior to Implementation of Change to Plant Rep.Attachment to Ltr Compares Current Threshold for Unusual Event Declaration for RCS Leakage to Proposed & Includes Util Justification for Proposed Change + (18:28:33, 8 January 2025)
- 05000389/LER-1996-003-02, :on 960625,SITs Discharge Valves Procedurally Isolated in Mode 4 Due to Personnel Error.Issued Night Order to Licensed Operators + (18:28:35, 8 January 2025)
- L-96-186, Responds to Re Request for Addl Info Re Spent Fuel Survey Commitment Closure.Completed All Three Open Actions.W/O Encl + (18:28:36, 8 January 2025)
- L-96-189, Submits Cumulative Total of Steam Generator Tubes Plugged During Spring 1996 Outage & Previous Outages + (18:28:37, 8 January 2025)
- L-96-182, Monthly Operating Repts for June 1996 for St Lucie Units 1 & 2 + (18:28:39, 8 January 2025)
- IR 05000335/1996006 + (18:28:41, 8 January 2025)
- ML17228B568 + (18:28:43, 8 January 2025)
- ML17228B567 + (18:28:45, 8 January 2025)
- L-96-184, Revised Tech Specs Re Core Alteration Definition + (18:28:47, 8 January 2025)
- ML17228B565 + (18:28:47, 8 January 2025)
- ML17228B562 + (18:28:49, 8 January 2025)
- ML17228B561 + (18:28:51, 8 January 2025)
- ML17228B560 + (18:28:52, 8 January 2025)
- L-96-170, Provides Results of SG in-situ Pressure Testing + (18:28:53, 8 January 2025)
- 05000335/LER-1996-008-01, :on 960608,inadvertent Actuation of Safety Injection Actuation Signal & Containment Isolation Actuation Signal Occurred.Caused by Loss of Power Supply.Reviewed Power Supply Design & Conducted Visual Insp + (18:28:57, 8 January 2025)
- ML17228B555 + (18:28:59, 8 January 2025)
- 05000389/LER-1996-002-02, :on 960606,reactor Manually Tripped.Caused by Positioner Feedback Arm Failure on Main Generator Hydrogen Cooler Tcv.Mods Made to Hydrogen Cooler TCV to Eliminate Feedback Assembly & Reduce Vibration + (18:29:02, 8 January 2025)
- L-96-167, Responds to Violation Noted in Insp Repts 50-335/96-06 & 50-389/96-06.C/A:responsible Nuclear Watch Engineer Counseled & Disciplined & Shift Complement of Licensed & non-licensed Operators (Including Fire Team) Reviewed + (18:29:03, 8 January 2025)
- 05000335/LER-1996-007-01, :on 960607,1B EDG Inadvertently Started Due to Procedural Inadequacy.Reset B Channel Cias & Reenergized 1B3 4,160 Bus from Startup Transformer.Changes Made to MPs 1-0970027 & 1-0970028 + (18:29:08, 8 January 2025)
- ML17228B551 + (18:29:10, 8 January 2025)
- ML17228B550 + (18:29:11, 8 January 2025)
- L-96-173, Forwards St Lucie Unit 2 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period of 940423-960105. Rept Correlates W/Info Included in Rev 10 of UFSAR Submitted Under Separate Cover + (18:29:15, 8 January 2025)
- ML17228B546 + (18:29:17, 8 January 2025)
- ML17228B544 + (18:29:21, 8 January 2025)
- ML17228B543 + (18:29:22, 8 January 2025)
- 05000335/LER-1996-006-01, :on 960601,loss of Containment Audible Count Rate Indication Occurred.Caused by Procedural Inadequacy. Revised Electrical Bus Removal Procedure & Revised Plant Breaker List & Circuitry Drawing + (18:29:24, 8 January 2025)
- L-96-165, Forwards Key Performance Monthly Indicators Issued in June 1996 During Mgt Review Meeting + (18:29:26, 8 January 2025)