Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17252A519 + (16:32:30, 8 January 2025)
- ML17252A518 + (16:32:30, 8 January 2025)
- ML17252A517 + (16:32:31, 8 January 2025)
- ML17252A516 + (16:32:31, 8 January 2025)
- ML17252A515 + (16:32:32, 8 January 2025)
- 05000249/LER-1974-037, Regarding the Torus Oxygen Containment Out of Limit + (16:32:33, 8 January 2025)
- 05000249/LER-1974-022, Regarding HPCI High Flow Setpoint DPIS 3-2352 of 283 Inches H20 Which Is Above Technical Specifications + (16:32:35, 8 January 2025)
- ML17252A512 + (16:32:36, 8 January 2025)
- ML17252A511 + (16:32:36, 8 January 2025)
- 05000249/LER-1978-024, /03L-0 for Dresden Unit 3 Regarding the Discovery of PS3-263-53A to Trip at 1178 PSI Which Is Above Technical Specifications + (16:32:38, 8 January 2025)
- ML17252A508 + (16:32:39, 8 January 2025)
- ML17252A507 + (16:32:39, 8 January 2025)
- 05000249/LER-1974-025, Regarding Failure of B TIP Machine Valve to Close + (16:32:41, 8 January 2025)
- ML17252A505 + (16:32:42, 8 January 2025)
- 05000249/LER-1974-027, Regarding Loss of Core Spray 3A Discharge Pressure + (16:32:43, 8 January 2025)
- 05000237/LER-1974-028, Regarding TIP Machine Ball Valve Failure + (16:32:45, 8 January 2025)
- 05000249/LER-1974-054, For Dresden 3 Regarding Core Spray Valve 3-1402-38As Failure to Close + (16:32:46, 8 January 2025)
- ML17252A501 + (16:32:47, 8 January 2025)
- ML17252A500 + (16:32:48, 8 January 2025)
- ML17252A497 + (16:32:50, 8 January 2025)
- 05000237/LER-1974-029, For Dresden 3 Regarding a Through-Wall Crack on Torus/Drywell Purge Line + (16:32:51, 8 January 2025)
- ML17252A495 + (16:32:52, 8 January 2025)
- 05000249/LER-1974-047, Regarding Failure of Pressure Switch Instrument Taps on 2/3 Radwaste Filter + (16:32:54, 8 January 2025)
- 05000249/LER-1974-031, For Dresden Unit 3 Regarding the 2/3 Core Height Water Level Sensors Lits 3-263-73 A&B Having Setpoints Above the Technical Specification Limit + (16:32:56, 8 January 2025)
- 05000237/LER-1974-032, Regarding High Pressure Coolant Injection High Flow Instrument Anomaly + (16:32:57, 8 January 2025)
- ML17252A491 + (16:32:58, 8 January 2025)
- ML17252A489 + (16:32:59, 8 January 2025)
- ML17252A490 + (16:32:59, 8 January 2025)
- ML17252A488 + (16:33:00, 8 January 2025)
- 05000237/LER-1978-025, /03L-0 for Dresden Unit 3 Regarding Discovery of a Spike on the Liquid Process Radiation Monitor for the Service Water Discharge + (16:33:01, 8 January 2025)
- 05000237/LER-1974-033, Regarding Discovery of a Pinhole Leak on the 3A Reactor Feed Pump Minimum Flow Line + (16:33:03, 8 January 2025)
- 05000237/LER-1974-034, Regarding Failure of a Air Ejector Rupture Disc + (16:33:05, 8 January 2025)
- ML17252A484 + (16:33:06, 8 January 2025)
- 05000237/LER-1974-036, Regarding Discovery of a Small Leak on Reactor Feed Pump 3A Minimum Flow Line 3-3205A + (16:33:08, 8 January 2025)
- 05000237/LER-1974-035, For Dresden Units 2 and 3 Regarding Secondary Containment Blowout Panel Failure + (16:33:12, 8 January 2025)
- ML17252A480 + (16:33:16, 8 January 2025)
- 05000237/LER-1978-026-03, Re While Performing LPCI Both Indicating Lights Went Out and the Motor Stopped + (16:33:18, 8 January 2025)
- ML17252A475 + (16:33:19, 8 January 2025)
- ML17252A473 + (16:33:20, 8 January 2025)
- ML17252A474 + (16:33:20, 8 January 2025)
- ML17252A465 + (16:33:21, 8 January 2025)
- 05000237/LER-1978-029-03, Re Safety Implications Were Minimal Because 1 or More Operable APRMs Per Channel Remained Available as Required by TS 3.2 + (16:33:22, 8 January 2025)
- 05000237/LER-1978-045-03, Re Auto Blowdown Permissive Sw. Ps 2-1430-1466D Tripped at 120 Psig + (16:33:24, 8 January 2025)
- 05000249/LER-1978-028-03, Re While Performing Surv. Dis 250-1, MSL Hi Flow Isolation Sw. Dpis 3-261-2c Tripped at 117 Psid + (16:33:26, 8 January 2025)
- 05000237/LER-1978-025-03, Re While Preforming LPCI and Ccsw Surveillance on Unit 3 Prior to Taking the U-3 D/G Out of Service, a Spike Was Found on the Liquid Process Radiation Monitor for the Service Water Discharge + (16:33:27, 8 January 2025)
- ML17252A460 + (16:33:28, 8 January 2025)
- ML17252A458 + (16:33:29, 8 January 2025)
- ML17252A459 + (16:33:29, 8 January 2025)
- ML17252A456 + (16:33:30, 8 January 2025)
- ML17252A455 + (16:33:31, 8 January 2025)
- ML17252A454 + (16:33:31, 8 January 2025)
- ML17252A453 + (16:33:32, 8 January 2025)