- GO2-80-269, Forwards Response to NRC Re Violations Noted in IE Insp Rept 50-397/80-16.Corrective Actions:Const Deficiencies Reviewed for Reporting as Potential 10CFR.50.55e Items,Repts Submitted & Instruction Drafted + (13:49:03, 8 January 2025)
- GO2-80-257, Requests 801216 Meeting W/Nrc to Discuss Geology Issues Raised During NRC 801016-17 Site Visit.List of Attendees Requested + (13:49:09, 8 January 2025)
- ML17275A710 + (13:49:09, 8 January 2025)
- GO2-80-242, Forwards Sections of FSAR & Plant Design Assessment Rept for Safety Relief Valves & LOCA Loads to Assist in Understanding Nature of Hydrodynamic Loading Phenomenon in Mark II Containments & Use in Facility Buckling Analysis.W/O Encls + (13:49:11, 8 January 2025)
- ML17275A702 + (13:49:11, 8 January 2025)
- ML17275A696 + (13:49:13, 8 January 2025)
- ML17275A694 + (13:49:14, 8 January 2025)
- ML17275A690 + (13:49:18, 8 January 2025)
- ML17275A685 + (13:49:19, 8 January 2025)
- ML17275A683 + (13:49:20, 8 January 2025)
- ML17275A682 + (13:49:21, 8 January 2025)
- ML17275A679 + (13:49:21, 8 January 2025)
- ML17275A676 + (13:49:22, 8 January 2025)
- ML17275A672 + (13:49:23, 8 January 2025)
- ML17275A673 + (13:49:23, 8 January 2025)
- GO2-80-237, Deficiency Rept Re Limitorque Dc Valve Operators W/Class B Insulation Not Qualified to IEEE 382.Caused by Failure of Reliance Electric Co to Impose Matls Control on Subsuppliers for Dc Motors.Defective Operator Will Be Replaced + (13:49:24, 8 January 2025)
- ML17275A664 + (13:49:26, 8 January 2025)
- IR 05000397/1980010 + (13:49:28, 8 January 2025)
- ML17275A661 + (13:49:29, 8 January 2025)
- ML17275A659 + (13:49:30, 8 January 2025)
- ML17275A657 + (13:49:31, 8 January 2025)
- ML17275A656 + (13:49:31, 8 January 2025)
- GO2-80-228, Forwards 801022 Transmittal Ltr & Certificate of Svc Re Amend 11 to FSAR + (13:49:32, 8 January 2025)
- GO2-80-227, Final Deficiency Rept Re Installation of Missile Producing Equipment in Class IE Area.Protective Barriers Have Been Designed to Prevent Motor Generator Set Flywheel Failure from Damaging Adjacent Class IE Equipment + (13:49:33, 8 January 2025)
- IR 05000397/1980015 + (13:49:36, 8 January 2025)
- ML17275A650 + (13:49:38, 8 January 2025)
- ML17275A649 + (13:49:39, 8 January 2025)
- ML17275A641 + (13:49:40, 8 January 2025)
- ML17275A644 + (13:49:40, 8 January 2025)
- GO2-80-221, Forwards Amend 4 to Environ Rept.Amend Suppls Ecological Baseline Data & Updates Description of Environ Monitoring Programs + (13:49:41, 8 January 2025)
- IR 05000397/1980013 + (13:49:43, 8 January 2025)
- GO2-80-220, Forwards Amend 11 to Fsar.Affidavit Will Be Provided within 10 Days + (13:49:44, 8 January 2025)
- ML17275A635 + (13:49:44, 8 January 2025)
- ML17275A631 + (13:49:46, 8 January 2025)
- IR 05000397/1980004 + (13:50:47, 8 January 2025)
- IR 05000397/1980002 + (13:50:49, 8 January 2025)
- GO2-80-199, Responds to IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Facility Does Not Use Westinghouse Type W-2 Control Switches in Any Safety Sys Design + (13:50:50, 8 January 2025)
- ML17275A624 + (13:50:50, 8 January 2025)
- GO2-80-200, Responds to IE Bulletin 79-15, Deep Draft Pump Deficiencies. Initial Response of 790918 Indicated Action Would Be Taken.Responses Received from Suppliers Indicate No Operational Problems Experienced w/safety-related Pumps + (13:50:52, 8 January 2025)
- GO2-80-196, Responds to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312,Type 304 Stainless Steel Pipe. Initial Response of 800808 Indicated Review Due by 800915.Due to Delay in Obtaining Info,Review Will Be Completed 801103 + (13:50:53, 8 January 2025)
- GO2-80-215, Requests Addl NRC Branch Reviews Required on Util Safety Relief Valve Rept.Potential Need Exists for Review of Refinements to Generic Mark II Condensation Oscillation Load or Alternative Load Definition & Methodology + (13:50:55, 8 January 2025)
- GO2-80-211, Deficiency Rept Re Primary Containment Pressure Monitoring Instrumentation Sensing Line Routing to Initiate Eccs.Ped 220-I-324 & -329 Issued,Reassigning Instrumentation Sensing Lines to Penetrations Below Instrument Rack Elevation + (13:50:57, 8 January 2025)
- ML17275A617 + (13:50:57, 8 January 2025)
- GO2-80-212, Deficiency Rept Re Lack of Installation Documentation for Class IE Cables in Main Control Room Raceways.Evaluation Revealed Inadequate Insp Criteria & QA Program for Installation of Electrical Cables.Procedures Being Revised + (13:50:59, 8 January 2025)
- ML17275A615 + (13:50:59, 8 January 2025)
- GO2-80-210, Confirms 800930 & 1001 Meeting Schedules W/Reactor Sys Branch & Structural Engineering Branch,Respectively,Re Sacrificial Shield Wall at Facility + (13:51:01, 8 January 2025)
- ML17275A612 + (13:51:06, 8 January 2025)
- GO2-80-202, Deficiency Rept Re Large Diameter Piping Found to Have Less than ASME Code Required Min Wall Thickness.Caused by Overgrinding While Preparing Weld Profiles for ASME Section 11 Inservice Insp.Contractors to Revise Procedures + (13:51:07, 8 January 2025)
- ML17275A611 + (13:51:07, 8 January 2025)
- GO2-80-208, Deficiency Rept Re Power Piping Co Beam attachment,HS-142, Used in Rigid Sway Brace Assemblies Supplied W/Undersized Welds.Caused by Bracket Design Deficiency.Stop Work Order Issued to All Contractors Installing Subj Brackets + (13:51:09, 8 January 2025)
- GO2-80-203, Forwards Oath of Affirmation Inadvertently Omitted from Dl Renberger to Bj Youngblood + (13:51:10, 8 January 2025)