Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17276A835 + (13:07:42, 8 January 2025)
- GO2-81-562, Forwards marked-up FSAR Chapter 13, Conduct of Operations. Rewrite Will Be Incorporated Into Next FSAR Amend + (13:07:45, 8 January 2025)
- GO2-81-556, Forwards Suppl 2 to Engineering Evaluation of WNP-2 Sacrificial Shield Wall + (13:07:47, 8 January 2025)
- GO2-81-563, Forwards Licensing Review Group App I to Fsar.App Will Be Included in Amend 23 + (13:07:49, 8 January 2025)
- ML17276A793 + (13:07:51, 8 January 2025)
- ML17276A788 + (13:07:52, 8 January 2025)
- ML17276A779 + (13:07:53, 8 January 2025)
- ML17276A755 + (13:07:53, 8 January 2025)
- ML17276A745 + (13:07:54, 8 January 2025)
- ML17276A736 + (13:07:55, 8 January 2025)
- ML17276A727 + (13:07:55, 8 January 2025)
- ML17276A716 + (13:07:56, 8 January 2025)
- ML17276A708 + (13:07:57, 8 January 2025)
- ML17276A701 + (13:07:58, 8 January 2025)
- ML17276A690 + (13:07:58, 8 January 2025)
- ML17276A682 + (13:07:59, 8 January 2025)
- ML17276A672 + (13:08:00, 8 January 2025)
- GO2-81-561, Forwards Responses to Hydrologic Engineering Section Safety Questions 371.015,371.016,371.017 & 371.018 Contained in NRC .Other Responses Will Be Submitted by 820115.Ten Oversize Drawings Encl.Aperture Cards Are in PDR + (13:08:02, 8 January 2025)
- GO2-81-532, Forwards Info on Apps G & H Per Agreement at 810401 Meeting.Responses to Questions 121.011 Through 121.019 Also Encl.Responses Will Be Included in Amend to FSAR + (13:08:05, 8 January 2025)
- GO2-81-551, Forwards Responses to Geosciences Branch Questions 360.14 & 360.17.Faults Along Rattlesnake-Wallula Alignment Are Not Capable According to NRC Criteria.Estimates of Potential Earthquake Magnitudes Encl + (13:08:07, 8 January 2025)
- ML17276A642 + (13:08:08, 8 January 2025)
- GO2-81-541, Forwards Responses to Open Items Discussed at 811117-18 Geosciences Meeting.Remaining Reponses Will Be Transmitted Prior to 811231 + (13:08:10, 8 January 2025)
- ML17276A633 + (13:08:11, 8 January 2025)
- GO2-81-518, Forwards Open Items from Structural Engineering Branch 811005-08 Meeting in Woodbury,Ny + (13:08:12, 8 January 2025)
- GO2-81-544, Provides Rationale for Changing Discharge Port Design from 18-inch Circular Pipe to 8-inch by 32-inch Slot,Noted in Des Section 4.2.2.4.Design Results in Greater Mixing by Providing Greater Jet Entrainment Surface.Related Info Encl + (13:08:14, 8 January 2025)
- GO2-81-545, Forwards Responses to NRC Questions 121.19 Through 121.22 Re Preservice Insp Program,Per 811016 Meeting + (13:08:16, 8 January 2025)
- GO2-81-553, Discusses 811211 Telcon Between Nrc,Burns & Roe,Bechtel & Util on Question of Obtaining 3-h Fire Barrier for Cable Sys Tested to Meet App R requirements.One-hour Barrier W/O Sprinklers Could Be Used Selectively + (13:08:18, 8 January 2025)
- ML17276A593 + (13:08:20, 8 January 2025)
- ML17276A586 + (13:08:21, 8 January 2025)
- ML17276A577 + (13:08:22, 8 January 2025)
- ML17276A562 + (13:08:23, 8 January 2025)
- GO2-81-552, Forwards Proprietary & Nonproprietary Versions of Summary Rept, Comparison of Condensation Oscillation & Chugging Loads for Assessment of WPPSS Nuclear Project 2. Proprietary Version Withheld (Ref 10CFR2.790) + (13:08:24, 8 January 2025)
- IR 05000397/1981018 + (13:08:40, 8 January 2025)
- GO2-81-538, Forwards Updated Organization Charts Reflecting Recent Consolidations of business,safety-related & Analytical Functions.Changes Will Be Documented in Revised FSAR Chapter 13.Requested Addl Matl Available Prior to Dec 1981 Visit + (13:08:42, 8 January 2025)
- ML17276A538 + (13:08:42, 8 January 2025)
- ML17276A518 + (13:08:48, 8 January 2025)
- IR 05000397/1981023 + (13:08:49, 8 January 2025)
- ML17276A484 + (13:08:51, 8 January 2025)
- GO2-81-504, Forwards Certificate of Svc for Amend 20 to FSAR + (13:08:52, 8 January 2025)
- ML17276A470 + (13:09:05, 8 January 2025)
- GO2-81-527, Forwards Soil Backfill Testing Program, Vols 1 & 2,GA File 81-605,summarizing Results of Test Program & Conclusions Re Suspected Deficiency in Soil Backfill.Effects of Soil on safety-related Utils & Structures Acceptable + (13:09:06, 8 January 2025)
- NLS2017083, ISFSI - Thirty-Day Notification for the Use of Three Spent Fuel Casks + (13:09:09, 8 January 2025)
- ML17276A449 + (13:09:11, 8 January 2025)
- GO2-81-524, Forwards Results of Suppression Pool Temp Transient analysis.In-plant Test Will Be Conducted to Measure Difference Between Local & Bulk Pool Temps During Main Steam Valve Discharge + (13:09:12, 8 January 2025)
- ML17276A420 + (13:09:14, 8 January 2025)
- BVY 17-036, Registration of Spent Fuel Cask Use + (13:09:15, 8 January 2025)
- ML17276A413 + (13:09:16, 8 January 2025)
- ML17276A406 + (13:09:18, 8 January 2025)
- GO2-81-511, Forwards Response to NRC Request for Info Re Fire Protection Evaluation Rept + (13:09:19, 8 January 2025)
- ML17276A356 + (13:09:24, 8 January 2025)
- ML17276A348 + (13:09:24, 8 January 2025)