Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17276B667 + (12:52:02, 8 January 2025)
- ML17276B666 + (12:52:03, 8 January 2025)
- ML17276B665 + (12:52:05, 8 January 2025)
- ML17276B664 + (12:52:06, 8 January 2025)
- GO2-82-836, Forwards Update to Pump & Valve Inservice Test Program Plan, Per Util 820708 ltr.W/21 Oversize Drawings.Aperture Cards Are Available in PDR + (12:52:07, 8 January 2025)
- ML17276B663 + (12:52:07, 8 January 2025)
- GO2-82-381, Forwards Test Rept 82-5-355B, Three-Hour Fire Endurance Tests on Thermo-Lag 330-1 Subliming Coating Envelope Sys for WPPSS Nuclear Projects. W/O Encl + (12:52:43, 8 January 2025)
- GO2-82-801, Provides Addl Info Re Preservice Insp Program Plan for Scram Discharge Sys Per 820812 Telcon.Boundary Diagram for Control Rod Drive Sys Encl + (12:53:02, 8 January 2025)
- ML17276B654 + (12:53:26, 8 January 2025)
- GO2-82-824, Forwards Supplemental Response to NUREG-0612, Control of Heavy Loads, Revision 1 to Close Out SER Outstanding Issue 30 + (12:53:27, 8 January 2025)
- ML17276B650 + (12:54:03, 8 January 2025)
- GO2-82-826, Submits Addl Info to Suppl Test Rept Data in Util 820802 & 0920 Ltrs to NRC Re Thermo-Lag 330-1,subliming Coating Envelope Sys (Itl Rept 82-5-355A) for Fire Protection of Cable Raceway Sys Discussed in App R + (12:54:04, 8 January 2025)
- GO2-82-793, Advises That Manual Block Valve CAS-VX-82e Will Be Utilized as Containment Isolation Valve in Lieu of Relocating Check Valve on Air Line to Inside Containment.Change Will Be Incorporated in Future FSAR Amend + (12:54:29, 8 January 2025)
- GO2-82-385, Forwards Revised Corrective Actions to NRC Notice of Violations 79-10/01,79-10/03,80-09/09 & 80-08/22 Noted in IE Insp Rept 50-397/81-22.All Future Liquid Penetrant Exams Will Be Performed by Bechtel Approved Subcontractor + (12:54:39, 8 January 2025)
- GO2-82-811, Forwards Amend 26 to FSAR + (12:54:42, 8 January 2025)
- ML17276B642 + (12:54:45, 8 January 2025)
- ML17276B643 + (12:54:45, 8 January 2025)
- GO2-82-782, Forwards Wa Nuclear Project 2 Environ Equipment Qualification Rept for Safety-Related Equipment, Vols 1,2 & 3,in Response to NRC .Rept Will Be Incorporated Into FSAR Amend + (12:54:46, 8 January 2025)
- GO2-82-792, Forwards One-Hour ASTM E119 Fire Simulation Facility Fire Tests Water Hose Stream Impact Tests & Electrical Circuitry Continuity Tests on Nuclear Facility Class IE Cable Trays & Conduit Test... Rept Withheld (Ref 10CFR2.790) + (12:54:49, 8 January 2025)
- GO2-82-810, Commits to Implementing Mod of Control Logic on Pressure Interlocks of Low Pressure ECCS Injection Valves by Fuel Load.Commitment Dependent on Timely Equipment Delivery.Info Closes SER Outstanding Issue 1.7(8) + (12:54:58, 8 January 2025)
- GO2-82-800, Forwards Corrections & Clarifications to Amend 23 to FSAR Section 8.3 Re Onsite Power Sys.Next FSAR Amend Will Be Revised to Include Encl Corrections + (12:55:08, 8 January 2025)
- GO2-82-804, Forwards Final Response to 820708 Concerns Re Adequacy of Design Margins of Mark II Containment Sys.Issues Raised by GE Do Not Represent Significant Safety Concerns for Facility + (12:55:13, 8 January 2025)
- GO2-82-817, Forwards marked-up Correct Table 1.2 of SER (NUREG-0892) Re Comparison of Facility Principal Design Features to Similar Facilities,Per ACRS Subcommittee on WNP-2 Meeting + (12:55:15, 8 January 2025)
- GO2-82-818, Requests Revision to Suppl 2 of SER,NUREG-0892,Sections 4.2.3.2(7),4.2.3.3(1) & 4.2.3.3(3) to Indicate Resolution of Cladding Rupture Concern & to Reflect That PCT Margin Is Not Required + (12:55:17, 8 January 2025)
- ML17276B625 + (12:55:19, 8 January 2025)
- GO2-82-808, Forwards Addl Info Re Organizational Changes in Preparation for ACRS 821004 Meeting.Formal Revisions to FSAR & Operational QA Program Description Will Be Submitted Upon Completion + (12:55:20, 8 January 2025)
- ML17276B620 + (12:55:22, 8 January 2025)
- ML17276B619 + (12:55:23, 8 January 2025)
- ML17276B618 + (12:55:24, 8 January 2025)
- ML17276B617 + (12:55:25, 8 January 2025)
- ML17276B615 + (12:55:26, 8 January 2025)
- ML17276B613 + (12:55:26, 8 January 2025)
- ML17276B609 + (12:55:28, 8 January 2025)
- ML17276B603 + (12:55:31, 8 January 2025)
- ML17276B601 + (12:55:33, 8 January 2025)
- ML17276B600 + (12:55:34, 8 January 2025)
- GO2-82-672, Forwards marked-up FSAR Pages Submitting Addl Info Re Internally Generated Missiles (Outside Containment),Per 820528 Commitment.Info Closes Outstanding SER Issue 2, NUREG-0892 + (12:55:35, 8 January 2025)
- ML17276B598 + (12:55:37, 8 January 2025)
- GO2-82-682, Forwards Corporate Organizational Changes Effective 820810. Changes Will Be Reflected in Future Revisions to FSAR & Operational QA Program Description + (12:55:38, 8 January 2025)
- GO2-17-166, Response to Request for Additional Information for Relief Request 3ISI-19 + (12:55:39, 8 January 2025)
- GO2-82-634, Forwards Addl Info on SER Outstanding Issue 10 Re Standby Svc Water Instrumentation & Control Design,In Response to NRC .Issue 10 Considered Closed + (12:55:40, 8 January 2025)
- GO2-82-641, Clarifies Diesel Generator Bldg Air Intake Per Discussion Re Design Basis Dust Storm Effect.Response Closes Out SER Outstanding Concern + (12:55:41, 8 January 2025)
- GO2-82-638, Confirms 820727 Telcon Re Use of ASME Code Case N-308, Documentation of Repairs & Replacement of Components in Nuclear Power Plants. Util Will Implement Code Case as Written & Approved by NRC + (12:55:42, 8 January 2025)
- GO2-82-631, Forwards Response to NUREG-0892,SER Outstanding Issue 8 Re Pressure Interlocks on Emergency Core Cooling Injection Valves.Issue Considered Closed + (12:55:44, 8 January 2025)
- GO2-82-630, Advises That Findings from Mark III Containment Program to Demonstrate That Use of Square Root of Sum of Squares Rule for Combining Dynamic Responses Acceptable for Facility,Per SER Section 3.9.3.1 + (12:55:45, 8 January 2025)
- GO2-82-537, Requests Timely Completion of Evaluation of Geology & Seismology Review.Excessively re-evaluated Siting Issues Deplete Resources,Rarely Result in Plant Changes & Cause Licensing Delays + (12:55:46, 8 January 2025)
- ML17276B574 + (12:55:48, 8 January 2025)
- ML17276B572 + (12:55:49, 8 January 2025)
- GO2-82-493, Forwards Rept on Capability of Southeast Anticline NRC Request at 820518-19 Meetings.Rept Should Close Out Open Item in Ser.W/O Encl + (12:55:50, 8 January 2025)
- ML17276B569 + (12:55:50, 8 January 2025)
- GO2-82-578, Forwards Certificate of Svc for Amend 24 to Fsar.Transmittal Ltr to Benton County Commissioners & Energy Facility Site Evaluation Council Encl + (12:55:52, 8 January 2025)