Responds to Expressing Concerns Re Review of Siting Issues Resolved During CP Proceedings.Siting Issues Will Be Closed Out at CP Stage
ML17276B572
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/15/1982
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Ferguson R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8208040175
Download: ML17276B572 (4)


Text

F 1

L RI BUTION Jment Control (50-'3'97)

NRC PDR L PDR PRC System NSIC DL:L Reading RTedesco/JKerrigan DEisenhut/RPurple ASchwencer SCavana RAuluck (ED EHylton MBridge HDenton/ECase (ED PPAS SECY (3

WDircks ISE KCornell GCunnin TRehm SHanaue VStello RMattso RDeYoung RVollme RMinogue HThomps "UL 1 5 l982

Dear Mr. Ferguson:

I appreciate your comments regarding the regulatory process and share your concerns on any unnecessary reevaluation and the cost estimates included in your letter and the impact of excessive regulatory demands on utilities.

Let me state that it is our intention to try to close out all siting issues at the CP stage.

Me must recognize, however, that if. significant new information regarding a siting issue should develop between the CP and the OL review, the effect of that new information must be evaluated.

With regard to MNP-2 and the related siting issues, while that issue is nearing resolution I have asked op staff to arrange a meeting with you to discuss this matter.

This meeting is being arranged through Dr.

G.

D. Bouchey.

ugh 0812017) rs, Mr. Robert L. Ferguson OII12017)

Managing Director

)

Washington Public Power Supply System Post Office Box 968 gham 3000 George Washington Way Richland, Washington 99352 r

on PCheck BSnyder I am pleased to respond to your letter dated June ll, 1982, to Chairman Palladino in which you expressed concerns about the staff review of siting issues that were resolved during construction permit proceedings.

You believe that these issues are being unnecessarily reevaluated as part of operating license reviews, citing the OL review of the MNP-2 seismic design basis.

Sincerely, Originei Sighted gy fL it. Denton Harold R. Denton, Director Office of Nuclear Reactor Regulation 8208040i75 8207i5 PDR ADOCK 05000397 A

PDR

  • See Previous Concurrence OFFICE/

SURNAMEiI DATE Q DL:L*

RTedesco 07/06/82 DGE'$

~ ~ e ~ ooo

+No

~ 0 ~ 0

~ 0 ~

ifut E

a e

~ ~

~

~ 0

~ et> ~IP /82

~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~

/82

~ 01 ~ 0 ~ OOOO ~ 0

~ 0 ~

K4~littd H

e on ates'1

~I~ 0 ~ 0 ~ 0 ~ 00 ~

~7/ 1S /82

~

I~ ~i ~ ~ ~

0 ~ 0 ~ ~ 0 ~ ~ ~ ~ 0 ~\\

NRC FORM 318 (10-80) NRCM 0240 OFF ICIAL RECORD COPY US QPO: 1981~980

4 I, q ig g,

t J

/WE '(

C.

DIG IBUTION Document Control(50-397}

NRC PDR L PDR PRC System NS IC

'L:L Reading RTedesco/JKerrigan DEisenhut/RPurple ASchwencer RAuluck EHylton HDenton/ECase PPAS WDircks KCo mell TRehm

Dear. Hr. Ferguson:

VStel 1 o RDe Young RNinogue I am pleased to respond to yo letter dated June 11, 1982, to Chairman Palladino in which you expresse concerns about the staff review of siting issues that were resolved during onstruction permit proceedings.

You now feel that these issues are being u

ecessarily reevaluated as part of the operating license review for WNP-2.

t1r. Rober L. Ferguson Managing Di ctor Washington Pub ic Power Supply System Post Office Box 68 3000 George Washi ton Way Richland, Washingto 99352 I appreciate your comments regarding th regulatory process and share your concerns on any unnecessary reevaluation nd the cost estimates included in your letter and the impact of excessive gulatory'demands'on utilities.

On the other hand, we are mandated to ensur the public health and safety through safe operation of nuclear power plant facilities and clearly one of the areas of significance lies in the seism design adequacy of the WNP-2 faci1 ity.

Sincerely, With regard to WNP-2 and the related siting issues, I have directed my staff to arrange a meeting with you to discuss this tter for appropriate management resolution.

This meeting will be arranged rough Dr. G.

D. Bauchey of your staff.

Harold R. Denton, Director Office of Nuclear Reactor Regulati, SCavanaugh, NRR(EDO//12017)

GCunningham MBridgers,EDO (ED0812017)

SHanauer SECY(3)

RHattson I&E RVollmer HThompson PCheck BSnyder OFFICE/

1 g huRNaMEP 7/06 OATEf DL:

RL esco

....z.(.()t,/e....

NRC FORM 318 t1040) NRCM 0240 DL DEisenhut~:

~00\\ ~ 0 ~ 0 ~ 00 ~ 0 ~ 00 ~PHONO 07/

/82

~\\ ~ 0 ~ 0 ~ OAO ~ 0 ~ 0 ~ ~\\ ~ 0 ~ 0 ~ ~

NRR EGCase 07/

/82

~ ~i~ ~ 0 ~ ~i ~i~10i1 ~ ~ ~ 0 ~ ~ 0 ~

NRR HRDenton

~ ~ ~ ~ 0 ~ ~ 0 ~ 0 ~ ~ ~ ~ 0 ~ ~ ~ ~i~ ~

~

07/

/82 DO WJDircks 07/

/82 OFFIClAL RECORD COPY

~ ~ ~ ~

0 V 0 ~IV 0 ~ ~ 1 ~

USQPO: IiII~960

0 C

1