Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000397/1983006 + (12:46:55, 8 January 2025)
- GO2-83-169, Discusses Fire Hose & Standpipe Mods.Meeting Scheduled for 830304 Will Present Position That Current Sys Provides Fully Satisfactory Implementation of App R Requirements + (12:46:57, 8 January 2025)
- ML17277A479 + (12:46:57, 8 January 2025)
- GO2-83-175, Advises That Rev to FSAR Chapter 11,Section 11.4, Utilization of Interim Portable Solid Radwaste Solidification Sys, Will Be Submitted After Fuel Load + (12:47:00, 8 January 2025)
- GO2-83-164, Responds to NRC Question 010.068 Re Secondary Missile Generation Resulting from Spalling & Scabbing of Concrete Walls & Barriers Upon Impact by Credible Plant Missiles. Survey Indicates No Secondary Missiles Can Be Generated + (12:47:04, 8 January 2025)
- GO2-83-166, Submits Changes to 821004 Submittal of Rev 1 to Control of Heavy Loads. Safe Load Path for Cattle Chute Will Be Shown in Plant Procedure 10.3.5 + (12:47:06, 8 January 2025)
- GO2-83-167, Commits to Modifying Design Such That Motor Operated Valves at Standby Svc Water Pumphouse Are Directly Connected to Motor Control Ctr in Radwaste Bldg Per NUREG-0892,SER Outstanding Issue 10 + (12:47:08, 8 January 2025)
- ML17277A472 + (12:47:11, 8 January 2025)
- GO2-83-142, Forwards Amend 28 to FSAR + (12:47:12, 8 January 2025)
- ML17277A471 + (12:47:12, 8 January 2025)
- ML17277A467 + (12:47:14, 8 January 2025)
- ML17277A465 + (12:47:14, 8 January 2025)
- GO2-83-090, Forwards Applicability of Use of Square-Root-of-Sum-of- Square (Srss) Method for Combining Peak Dynamic Responses for Wa Nuclear Plant 2, Per .Rept Satisfies NUREG-0892 SER Confirmatory Item 6 + (12:47:15, 8 January 2025)
- GO2-83-170, Forwards Supporting Documentation & Response to NRC 820916 Request for Addl Info & NUREG-0892 SER Outstanding Issue 26, Operability of Purge Valves. Submittal Also Confirms Discussions W/R Auluck During Pvort Audit in Nov 1982 + (12:47:16, 8 January 2025)
- GO2-83-089, Transmits Preservice Insp Drawings for Scram Discharge Piping Per NRC Request.Boundary Diagram & Supply Sys Exam Requirements for Piping Forwarded by + (12:47:18, 8 January 2025)
- ML17277A460 + (12:47:21, 8 January 2025)
- ML17277A459 + (12:47:22, 8 January 2025)
- GO2-83-140, Requests Written Confirmation of Telcon W/Rh Nelson,R Auluck & R Giardina That Backfitting of Diesel Generators W/Air Dryers by First Refueling Outage Acceptable + (12:47:23, 8 January 2025)
- ML17277A458 + (12:47:23, 8 January 2025)
- ML17277A456 + (12:47:25, 8 January 2025)
- ML17277A455 + (12:47:26, 8 January 2025)
- GO2-83-071, Forwards Final Suppl to 800801 Engineering Evaluation of Sacrificial Shield Wall, Closing All Previous Items & Providing Discussion of Work Performed to Complete Previously Outlined Programs in Aug 1980 Rept + (12:47:27, 8 January 2025)
- GO2-83-081, Responds to NRC 821209 Request for Addl Info Re Qualification of safety-related Electrical Equipment.Item 10 Re Environ Qualification of Mechanical Equipment to Be Addressed W/Electrical Equipment During Audit + (12:47:29, 8 January 2025)
- ML17277A450 + (12:47:31, 8 January 2025)
- ML17277A444 + (12:47:32, 8 January 2025)
- ML17277A443 + (12:47:33, 8 January 2025)
- ML17277A440 + (12:47:34, 8 January 2025)
- ML17277A441 + (12:47:34, 8 January 2025)
- ML17277A439 + (12:47:35, 8 January 2025)
- ML17277A438 + (12:47:36, 8 January 2025)
- ML17277A437 + (12:47:37, 8 January 2025)
- GO2-83-007, Forwards Rev 0 to Visual Exam Acceptance Criteria for Reverification Insp of Welded Structures + (12:47:38, 8 January 2025)
- ML17277A436 + (12:47:38, 8 January 2025)
- GO2-83-083, Requests Concurrence in Delaying Control Room Chiller Installation Until 840531.Control Room Can Be Maintained Under All Accident Conditions If Seismic Category I Standby Svc Water Sys Left Installed as Backup for Radwaste Chiller + (12:47:43, 8 January 2025)
- GO2-83-048, Forwards Evaluation of Containment Pressure Boundary Matl Compliance W/Gdc 51.Evaluation Justifies Revising NRC Lowest Svc Metal Temp Values + (12:47:45, 8 January 2025)
- GO2-83-073, Forwards Thirteenth Progress Rept Re Review of Completed safety-related Work for Oct - Dec 1982 + (12:47:47, 8 January 2025)
- ML17277A429 + (12:47:49, 8 January 2025)
- GO2-80-168, Forwards Engineering Evaluation of Wpps Unit 2 Sacrificial Shield Wall, Constituting Util Corrective Action Plan. W/O Encl + (12:47:50, 8 January 2025)
- ML17277A425 + (12:47:52, 8 January 2025)
- ML17277A427 + (12:47:52, 8 January 2025)
- ML17277A424 + (12:47:54, 8 January 2025)
- GO2-83-049, Forwards Rev 1 to, Hanford Site Evacuation Time Assessment Study. Study Provides Technical Basis for Info Included in Emergency Preparedness Plan + (12:47:55, 8 January 2025)
- ML17277A418 + (12:47:56, 8 January 2025)
- GO2-83-014, Forwards Amend 27 to FSAR + (12:47:58, 8 January 2025)
- ML17277A417 + (12:47:58, 8 January 2025)
- ML17277A413 + (12:48:00, 8 January 2025)
- ML17277A412 + (12:48:01, 8 January 2025)
- ML17277A411 + (12:48:02, 8 January 2025)
- ML17277A409 + (12:48:02, 8 January 2025)
- GO2-83-013, Forwards FSAR Amend 27 Transmittal Ltr & Certificate of Svc on Chairman of Benton County Board of Commissioners & Chairman of Energy Facility Site Evaluation Council + (12:48:03, 8 January 2025)
- ML17277A406 + (12:48:05, 8 January 2025)