ML17277A437

From kanterella
Jump to navigation Jump to search
Notification of 830209 Meeting W/Util in Bethesda,Md to Discuss Proposed Operational QA Procedures
ML17277A437
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/04/1983
From: Rajender Auluck
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8302100137
Download: ML17277A437 (4)


Text

Docket No. 50-397 FEB 4

>983 DISTRI BUT ION:

See attached page HEHORANDUH FOR:

A. Schwencer, Chief Licensing Branch Ho. 2 Division of Licensing"

.FROM:

SUBJECT:

DATE 5 TINE:

LOCATION:

PURPOSE:

R. Auluck, Prospect Manager Licensing Branch No. 2, DL FORTHCOItlING NNAGEMENT HEETING WITH WASHINGTON PUBLIC POWER SUPPLY SYSTEM (WPPSS)

Wednesday, February 9, 1983 1

00 PN Room P-118 Phillips Building

Bethesda, ND Presentation by WPPSS management on the proposed operational equality Assurance procedures.

PARTICIPANTS:

NRC J. Gilray F. Allenspach R. Auluck WPPSS R. Glasscock R. Nelson Original signed by '.

cc:

See next page R. Auluck, Project t<anager Licensing Branch No.

2 Division of Licensing 8302100i37 830204 PDR ADOCK 05000397 A

PDR OFFICfI SURNAMflj DATf$

DL:LB¹2 P R

..;.kM...

2 g /83 D

/BC ncel 2/

/83 NRG FORM 818 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1Q81~i960

WNP-2 Mr. R. L. Ferguson

>lan agi ng Director Washington Public Power. Supply System P.

0. Box 968 3000 George Washington Way
Richland, Washington 99352 CC:

Nicholas Reynolds, Esquire Debevoise

& Liberman 1200 Seventeenth

Street, N.

W.

Washington, D. C.

20036 Mr. G.E.

Doupe, Esquire Washington Public Power Supply System P.O.

Box 968 3000 George Mashington May

Richland, Washington 99352 Nicholas Lewi s, Chairman Energy Facility Site Evaluation Council Mail Stop.PY-11 Olympi a, Washington 98504 Roger Nelson, Licensing Manager Mashington Public Power Supply System P.O.

Box 968 Richl and, Washington 99352 Hr. M.G. Conn, Sr.

N/M Group Supervisor Burns and Roe, Incorporated 601 Williams Boulevard

Richland, Washington 99352 Nr. Richard Feil U.S; NRC Resident Inspector WP PSS-2 NPS P.O.

Box 69 Richl.and, Washington 99352 Dr. G.D.

Bouchey Deputy 'Director, Safety 5 Security

.Washington Public Power Supply System P.O.

Box 968, h9 650 Richland',

Washington 99352

I tiEETIistG NOTICE DISTRIBUTION:

-"Fh' tag-Date:

-'Document Control (50-3g7) g NRC PDR L.PDR NSIC PRC LB-..'2 Reading E. Hylton

. Project Manager

~ -

H. Denton/E.

Case D,:. Eisenhut/R.

Purple

.T,.

M. Novak"

~

B: Youngblood

.,:-A. Schwencer

'. Knighton

.,E.

Adensam

-:G. Lainas F,. Hiragl ia..

J.

P. Knight

~

.W. Johnston

-:D. lhuller T.,Speis

.-".~"."'.'.

Houston L=. Pubenstein F. Schroeder

~ H.. 'Ernst J;

Kramer

.. NRR Divisi'on Directors*

OELD Attorney H. Paton E: L. Jordan, DEJA:IE J:

H. Taylor, DRP:IE Phil.lips Building Receptioni.st**

ACRS (16)

Region V

Res i'e nt i ns pe ctor NRC PARTICIPANTS:

J; Gilray F. Allenspach R.,. Aul uc k cc:

Service List

~ 1 I

  • Only if participant in meeti'ng
  • "'Only if meeting held in Bethesda

a mssg

~

>>n~~.