Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17279A188 + (11:37:09, 8 January 2025)
- IR 05000397/1987007 + (11:37:12, 8 January 2025)
- ML17279A184 + (11:37:13, 8 January 2025)
- TAC:61850 + (11:37:14, 8 January 2025)
- ML17279A181 + (11:37:15, 8 January 2025)
- IR 05000397/1987005 + (11:37:19, 8 January 2025)
- TAC:61641 + (11:37:20, 8 January 2025)
- ML17279A178 + (11:37:20, 8 January 2025)
- ML17279A176 + (11:37:21, 8 January 2025)
- TAC:62045 + (11:37:22, 8 January 2025)
- ML17279A174 + (11:37:22, 8 January 2025)
- ML17279A172 + (11:37:23, 8 January 2025)
- ML17279A168 + (11:37:24, 8 January 2025)
- ML17279A167 + (11:37:25, 8 January 2025)
- ML17279A164 + (11:37:26, 8 January 2025)
- GO2-87-105, Application for Amend to License NPF-21,changing Tech Specs to Allow Use of Advanced Nuclear Fuels Corp,Inc Reload Fuel in Cycle 3.Fee Paid + (11:37:27, 8 January 2025)
- ML17279A162 + (11:37:27, 8 January 2025)
- ML17279A158 + (11:37:29, 8 January 2025)
- TAC:61116 + (11:37:30, 8 January 2025)
- ML17279A153 + (11:37:31, 8 January 2025)
- ML17279A146 + (11:37:32, 8 January 2025)
- ML17279A151 + (11:37:32, 8 January 2025)
- GO2-87-009, Application for Amend to License NPF-21,modifying Time Period When Reg Guide 1.97,Rev 2 Required to Be Implemented for Suppression Pool Level Monitoring from Prior to Startup Following Second Refueling Outage.Fee Paid + (11:37:33, 8 January 2025)
- ML17279A144 + (11:37:34, 8 January 2025)
- GO2-87-092, Requests That Tech Spec Limiting Condition for Operation 3.7.1.3 Be Changed to Read, UHS Consisting of Two Separate Spray Ponds W/Redundant Pumping & Spray Facilities Shall Be Operable W/: for Clarification + (11:37:35, 8 January 2025)
- GO2-87-080, Application to Amend License NPF-21,deleting License Condition 2.C.(16),Attachment 2,Item 3(b) Requiring Implementation of Reg Guide 1.97,Rev 2 for Flux Monitoring Prior to Startup Following Second Refueling.Fee Paid + (11:37:36, 8 January 2025)
- ML17279A134 + (11:37:38, 8 January 2025)
- GO2-87-079, Application to Amend License NPF-21,revising Tech Spec Table 3.3.7.1-1, Radiation Monitoring Instrumentation Re New Fuel Vault Criticality Monitor Alarm Setpoint Value.Fee Paid + (11:37:39, 8 January 2025)
- GO2-87-091, Clarifies 870303 Request for Amend to Tech Spec 3/4.1.5, Figures 3.1.5-1 & 3.1.5-2 Re Standby Liquid Control (SLC) Sys.Acceptance Testing to Demonstrate Capability of SLC Sys Will Be Performed W/Both SLC Pumps Operating Simultaneously + (11:37:40, 8 January 2025)
- L-PI-17-041, Enclosure 6 to L-PI-17-041, Westinghouse Affidavits + (11:37:42, 8 January 2025)
- ML17279A125 + (11:37:43, 8 January 2025)
- GO2-87-007, Advises That Util Will Commit to Performing 10CFR50,App J Type B & C Leak Rate Testing in Accordance w/860131,870109 & 0211 Requests for Exemption/Tech Spec Change + (11:37:45, 8 January 2025)
- ML17279A124 + (11:37:45, 8 January 2025)
- ML17279A121 + (11:37:47, 8 January 2025)
- ML17279A120 + (11:37:48, 8 January 2025)
- ML17279A113 + (11:37:49, 8 January 2025)
- MNS-17-040, (Mns), Units 1 and 2 - Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force + (11:37:50, 8 January 2025)
- GO2-87-073, Responds to 870212 Request for Clarification Re 870106 Application for Amend to License NPF-21,revising Tech Specs Concerning Standby Liquid Control Sys.Info Re Acceptance Testing for Min Flow Rate Provided + (11:37:55, 8 January 2025)
- ML17279A109 + (11:37:57, 8 January 2025)
- ONS-2017-072, Fifth Ten Year Inservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency + (11:37:58, 8 January 2025)
- ML17279A106 + (11:38:00, 8 January 2025)
- ML17279A104 + (11:38:00, 8 January 2025)
- 2CAN101701, Inservice Inspection Summary Report for the Twenty-Fifth Refueling Outage (2R25) + (11:38:01, 8 January 2025)
- ML17279A103 + (11:38:01, 8 January 2025)
- ML17279A078 + (11:38:02, 8 January 2025)
- ML17279A056 + (11:38:03, 8 January 2025)
- ML17279A045 + (11:38:06, 8 January 2025)
- ML17279A043 + (11:38:06, 8 January 2025)
- L-2017-183, Fifth 10-Year Inservice Testing (IST) Program Interval Relief Requests PR-01 Through PR-06, and PR-09, + (11:38:07, 8 January 2025)
- ML17278B237 + (11:38:08, 8 January 2025)
- ML17278B236 + (11:38:08, 8 January 2025)