Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000397/LER-1990-004, :on 900208,HPCS Diesel Generator Declared Inoperable for Performance of Corrective Maint to Investigate Previous Trip of Output Circuit Breaker Which Occurred on 900204.New Droop Switch Installed + (10:48:32, 8 January 2025)
- ML17285B109 + (10:48:33, 8 January 2025)
- GO2-90-038, Application for Amend to License NPF-21,revising Tech Spec 3.4.2, Safety Relief Valves & Tables 3.3.7.5-1 & 4.3.7.5-1, Accident Monitoring Instrumentation, to Allow Monitor on Safety Valves to Be Inoperable Until Shutdown + (10:48:34, 8 January 2025)
- ML17285B108 + (10:48:34, 8 January 2025)
- ML17285B105 + (10:48:36, 8 January 2025)
- ML17285B104 + (10:48:37, 8 January 2025)
- ML17285B103 + (10:48:38, 8 January 2025)
- ML17285B101 + (10:48:39, 8 January 2025)
- ML17285B097 + (10:48:40, 8 January 2025)
- GO2-90-035, Forwards Supplementary Info Re 900214 Application for Amend to License NPF-21,revising Tech Spec 3.3.7.5 to Address Failed Safety/Relief Valve Position Indicators + (10:48:41, 8 January 2025)
- ML17285B095 + (10:48:41, 8 January 2025)
- GO2-90-033, Forwards Compilation of Responses to Regulatory Impact Survey Questionnaire,Per Generic Ltr 90-01 + (10:48:45, 8 January 2025)
- NL-17-1097, Proposed Alternatives FNP-ISI-AL T-05-02 and VEGP-ISI-AL T-04-02 in Accordance with 10 CFR 50.55a(z)(2) Hardship Without a Compensating Increase in Quality and Safety + (10:48:45, 8 January 2025)
- RS-17-139, Second Updated Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations + (10:48:49, 8 January 2025)
- 05000397/LER-1989-038, :on 890121,two 3/8-inch Drain Line Valves Associated W/Standby Liquid Control Flow Transmitter Not Labeled & Not Contained in Checklist.Caused by Inadequate Procedures.Walkdown Will Be Conducted + (10:48:52, 8 January 2025)
- 05000397/LER-1989-033, :on 890811,RWCU Isolation Occurred When Fuse in Power Supply to Leak Detection Monitor Blew,Giving False High Alarm Signal to Isolation Logic.Cause Unknown.Fuse Replaced & RWCU Sys Restored to Operation + (10:48:55, 8 January 2025)
- ML17285B080 + (10:48:57, 8 January 2025)
- IR 05000397/1989040 + (10:49:00, 8 January 2025)
- ML17285B077 + (10:49:01, 8 January 2025)
- GO2-90-034, Responds to NRC Re Violations Noted in Insp Rept 50-397/89-30.Corrective Action:Plant Personnel Currently in Process of Making Improvements to Plant Operations Procedure Writers Guide + (10:49:02, 8 January 2025)
- ML17285B075 + (10:49:02, 8 January 2025)
- GO2-90-036, Application for Amend to License NPF-21,revising Battery Load Profiles in Surveillance Requirement 4.8.2.1.d.2 to Reflect Results of Recent Reviews of Battery Capabilities + (10:49:06, 8 January 2025)
- ML17285B073 + (10:49:06, 8 January 2025)
- GO2-90-037, Application for Amend to License NPF-21,revising Tech Spec 3.8.1.1, AC Sources, to Eliminate Unnecessary Starts,Per Generic Ltr 84-15 & to Allow Plant Resources to Focus on Restoring Equipment to Operable Status + (10:49:10, 8 January 2025)
- ML17285B070 + (10:49:10, 8 January 2025)
- GO2-90-026, Annual Personnel Monitoring Rept for WPPS-2 for CY89. W/ + (10:49:12, 8 January 2025)
- GO2-90-029, Informs of Delay of Equipment Setpoint Methodology Program Plan.New Schedule Will Be Provided within 30 Days of Ltr Date + (10:49:14, 8 January 2025)
- ML17285B064 + (10:49:14, 8 January 2025)
- ML17285B062 + (10:49:16, 8 January 2025)
- GO2-90-031, Forwards Washington Nuclear Plant-2 Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989 & Amend 7 to Odcm + (10:49:17, 8 January 2025)
- ML17285B060 + (10:49:17, 8 January 2025)
- ML17285B057 + (10:49:19, 8 January 2025)
- ML17285B056 + (10:49:20, 8 January 2025)
- ML17285B055 + (10:49:21, 8 January 2025)
- ML17285B054 + (10:49:22, 8 January 2025)
- GO2-90-032, Application for Amend to License NPF-21,allowing Use of Cycle 6 Reload Fuel in Plant.Changes to Listed Tech Specs Requested.Supporting Reload Analysis Repts Encl.Proprietary GE & ABB Atom Repts Withheld (Ref 10CFR2.790(b)(4)) + (10:49:23, 8 January 2025)
- IR 05000397/1990002 + (10:49:25, 8 January 2025)
- ML17285B050 + (10:49:25, 8 January 2025)
- 05000397/LER-1990-003, :on 900126,HPCS Sys Pump Suction Valve Switchover Occurred During Performance of Procedure for Draining Ref Leg.Caused by Plant Configuration.Sys Restored to pre-event Lineup Status + (10:49:27, 8 January 2025)
- ML17285B042 + (10:49:28, 8 January 2025)
- ML17285B040 + (10:49:29, 8 January 2025)
- ML17285B037 + (10:49:30, 8 January 2025)
- ML17285B035 + (10:49:31, 8 January 2025)
- GO2-90-024, Responds to Request for Generic Approval Re 871215 Application for Amend to License NPF-21,revising Tech Specs to Allow Use of Final Feedwater Temp Reduction for Cycle Extension + (10:49:32, 8 January 2025)
- 05000397/LER-1990-002, :on 900118,discovered That Main Steam Solenoid Pilot Valves Inoperable from June 1986 to June 1989.Caused by Personnel Error Due to Installation of Unqualified Power Connector.Connector Replaced + (10:49:36, 8 January 2025)
- GO2-90-028, Responds to Notice of Violation & Proposed Imposition of Civil Penalty Re Insp Repts 50-397/89-21,50-397/89-22 & 50-397/89-28.Violations Denied for Specified Reasons + (10:49:37, 8 January 2025)
- GO2-90-027, Provides Program Plan for Resolution of Concern Re Standby Gas Treatment Sys Relative to Establishing Secondary Containment Pressure Under All Conditions,Per NRC 900103 Request + (10:49:41, 8 January 2025)
- TAC:75048 + (10:49:41, 8 January 2025)
- GO2-90-025, Application for Amend to License NPF-21,changing Tech Spec 3.4.2 Re Safety Relief Valve & Tables 3.3.7.5-1 & 4.3.7.5.-1 Re Accident Monitoring Instrumentation to Permit Acoustic Monitor to Be Inoperable Until Next Shutdown + (10:49:43, 8 January 2025)
- ML17285B025 + (10:49:43, 8 January 2025)
- GO2-90-018, Responds to 891103 Request for Addl Info Re Four Action Items from Fire Protection Insp.Util Met W/Nrc Resident Inspector to Inform Region of Efforts Taken to Confirm That All Remedial Actions in Place + (10:49:44, 8 January 2025)
- GO2-90-023, Responds to NRC Re Violations Noted in Insp Rept 50-397/89-38.Corrective Action:Addl Plant QA Surveillance Being Performed on Select Sample of Fasteners to Ensure That Correct Torque Values Utilized + (10:49:46, 8 January 2025)