Monthly Operating Rept for Feb 1990 for WPPSS-2.W/900309 Ltr
ML17285B105
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/28/1990
From: Hutchison L, Power C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9003200213
Download: ML17285B105 (8)


Text

.ACCELERATED DI UTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System POWER,C.M. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly op ating rept for Feb 1990 for WPPS Nuclear Plant 2 9 tr.

DISTRIBUTIO 0 : IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Spec I

NOTES RECIPIENT COPIES RECIPIENT, COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 SAMWORTH,R 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB '1, 1 IRM TECH ADV 2 2 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB11 1 1 NR DREP/PRPB11 1 1 NUDOCS-ABSTRACT 1 1 G IL 01 1 1 RGN5 1 1 EXTERNAL I EGGG S MPSON i F 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29

0 t v

~ ~

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 March 9; 1990 U. S. Nuclear, Regulatory Commission Document Control Desk Washington; D. C. 20555

Dear,

Sir,:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT FEBRUARY 1990 Transmitted herewith is the Monthly Operating Report as required by our, Technical Specifications 6.9.1.6.

Very Truly Y urs; C. . Powers (M/D 927M)

WNP-2 Plant Manager, CMP/lc Enclosure cc: Mr,. J. B. Martin- NRG Region V Mr,. C. J. Bosted- NRG Resident Inspector, (901A)

Ms. Dottie Sherman - ANI; Farmington GT Mr,. J. T. Wheelock - INPO Mr. W. H. Lovelace NRC; Washington D.G.

ps 90032002i3 90022S PDR ADOCK 05000397 R PDC

T .

1" 7

C a

~ ~

DOCKET DO. ~E -O~

8tIT NAt4L WNP-2 DATE 3'/I/gO LNIT Sl lUTDOl'INS' REDUCTIONS COhiPLETED DY LB HUTCHISON REPCAT PERIOD FEB 19 gO TELEPl lONE (509)377-2486 mcnth, year TiK ~m 7E -TGGin~ BZiiSDH Tiilc0 Y t I WWT C IOt PRF E R C lN NC NONE SUhNlNY WNP 2 OPERATED ROUTINELY DURING FEBRUARY WITH NO OUTAGES OR SIGNIFICANT POWER REDUCTIONS l lETll00 SYSTEM h COt4POM.:NT F-Forced A-Equip Failure F-Admin 1-manual Exhibit F h H S- ched 0-Maint or Test ~ G-Oper Error 2-Manual Scratn Instructions for C-Refueling H-Other 3-Iluto Scram Preparation 0-negulatory Des triction 4-Continued Entry Sheet oi'ata E-Operator Training 6-I>educed Load Licensee Event Report h License Examination 9-Ottnr (LER) File (NUREG-0161)

OPERATXNG DATA REPORT WNP-2 01-Mar-90

1. DOCKET 50-397
2. REPORTXNG PERIOD: Feb-90 OUTAGE + ON-LINE HOURS 672
3. UTILITY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATXNG (GROSS MWe): 1200.9
6. DESXGN ELECTRICAL RATING (NET MWe): 1100
7. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:

NONE

10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

1 1 ~ REASONS FOR RESTRXCTIONS i IF ANY NONE MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 672 1416 45680.2
13. HOURS REACTOR CRITXCAL 672.0 1416.0 34491.3
14. RX RESERVE SHTDWN HRS 0.0 0.0 340.4
15. HRS GENERATOR ON LINE 672.0 1416.0 33263.9
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 2139099 4501146 92845586
18. GROSS ELECTRICAL ENERGY (MWH) 714160 1502260 30906210
19. NET ELECTRICAL ENERGY (MWH) 689969 1452452 29738595
20. UNIT SERVICE FACTOR 100 '~o 100 '~o 72 '~o
21. UNIT AVAILABILITYFACTOR 100.0~o 100.04 73.7%
22. UNIT CAPACITY FACTOR (MDC NET) 93.8% 93.7% 59.5:
23. UNXT CAPACITY FACTOR (DER NET) 93. 3>o 93.2% 59.24
24. UNIT FORCED OUTAGE RATE 0.04 0. O~o 8. 3~o
25. FORCED OUTAGE HOURS 0.0 0.0 2996.2 26 ~ SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE i DATE i DURATION)

REFUELING OUTAGE STARTING 4/13/90 FOR 45 DAYS

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

~ V VERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT WNP" 2 DATE 3/1/90 COMPLETED BY LB HUTCHISON TELEPHONE (509)377"2486 l lONTH FEBRUARY 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (t~wE-Net) (ttwE-Net) 10 17.

2. 862 18. 1080
3. 851 19. 1078
4. 1023 20. 1063
5. 1064 21. 1070
6. 970 22. 892
7. 1016 23. 932
8. 1071 24. 1072 1023 25. 1065 9.

973 26. 1065 10.

1016 27m 1061 1076 28. 1058 12.

13. 1077 29

'0.

14. 1073
15. 1075 3l.
16. 1063 INSTRUCTIONS On this form, list the average daily unit power level in VWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporti ng month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100 line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.