ML17285B064

From kanterella
Jump to navigation Jump to search
Advises That 900124 Rev 13 to Operational QA Program Description Consistent w/10CFR50,App B & Acceptable
ML17285B064
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/26/1990
From: Zimmerman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 9003090354
Download: ML17285B064 (2)


Text

gc Cp~ RATED Dl BUTION DE M04 STRXT1 04 SYSTEM REGULAT ZNFORMATZON DZSTRZBUTZONIZSTEM (RZDS)

ACC SSION NBR:9003090354 DOC.DATE: 90/02/26 NOTARIZED: NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION ZIMMERMAN,R.P.

Region 5, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION SORENSEN,G.C.

Washington Public Power Supply System

SUBJECT:

Advises that Rev 13 to "Operational QA Program Description WPSS-QA-004," acceptable.

DISTRIBUTION CODE:

IE43D COPIES RECEIVED:LTR I

ENCL 0 SIZE:

/

TITLE: 50.54.a.3

& 50.55.f.3 Change to SAR QA Program NOTES:

RECIPIENT ID CODE/NAME PD5 LA INTERNAL: ACRS NRR/DLPQ/LPEB10 OC/LFMB RGN5 FILE 01 COPIES LTTR ENCL 6

1 1

1 RECIPIENT ID CODE/NAME SAMWORTHFR IRM/DCB (AMDTS)

NUDOCS-ABSTRACT COPIES LTTR ENCL EXTERNAL: LPDR NRC PDR 8

I D

NOTE 'I0 ALL z%ICGiz RECIPZEPIS PLEASE HELP US Il3 RHXXZ %ASTEl CXNZACZ THE DOCXlMEÃV CXNGK)L DESK RXN Pl-37 (EXI'. 20079) Kl 1KaIK&hXS YOUR RÃ8 PKN DISTlGBUTICN LISTS FOR DOCUMENIS Y0U DCRPT NEZDl 0

TOTAL NUMBER OF, COPIES REQUIRED:

LTTR 16 ENCL 8

h D

D S

February 26, 1990 Washington Public Power Supply System P. 0.

Box 968 3000 George Washington Way

Richland, Washington 99352 Attention:

Mr. G.

C. Sorensen

Manager, Regulatory Programs

SUBJECT:

OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION (WPSS-QA-.004),

REVISION 13 On January 24, 1990, you submitted Revision 13 of the Operational QA Program Description (WPPSS-QA-004).

We have reviewed the changes addressed in Revision 13 and find that it continues to meet the requirements of 10 CFR 50, Appendix B; therefore, the changes are acceptable.

If there are changes to other operative QA commitments existing in docketed correspondence outside of the SAR QA program description, you are obligated to notify this office.

Implementing such changes should be based on 10 CFR 50.54(a)(3).

e If you have any question regarding this matter, please contact W. J.

Wagner of my staff at (415) 943-3731.

Sincerely, CC:

R.

B. Samworth, NRR J.

G. Spraul, NRR C. Bosted, RV DRSSP Section Chiefs DRSSP Branch Chiefs Central Files, RV RSBjg)ocumenfCCoritro@OeSJ5gRIDS)W<

/ S/

R.

P.

Zimmerman, Director Division of Reactor Safety and Projects 0 D

<HX OIOL AI0 OO 0lA 0'0 Ifl~

HD OQ 0<

O, C3OK OA 0'0.0-RV/jk RE VEST COPY UEST COPY REQUEST Y

REQUEST S /

NO YES /

NO YES /

NO YES /

NO REQUEST C

Y YES /

NO T

R YE

/

NO KIRSC CHAFFEE Z IMMERMAN~>

2/~90 2/Q2/90 2/23/90 HUEY 2/p.</90 WAGNER 2/zs /90

~E Ps l/0 RECORD NOTE:

Revision 13 was prepared to reflect:

(a) organizational changes; b

clarification of responsibilities for management of the QA Program; c

responsibilities related to procurement of spare and replacement items; d) added Nuclear Operation Standards cross reference to 10 CFR 50, Appendix B; (e) clarified how evaluation of vendors are performed; and (f) clarified the qualification requirements for Licensing and Assurance

Director, and added qualification requirements for Plant QC Manager.