Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000397/LER-1990-006, :on 900308,10CFR50 App R Cable Fire Protection Review Identified 12 New Cables in Fire Areas Vulnerable to Design Basis Fire.Caused by Equipment Design Deficiency. Items Placed on Hourly Fire Watch + (10:47:57, 8 January 2025)
- GO2-90-068, Requests Exemption from Filing Requirements of 10CFR55.45(b)(2)(iii) & (IV) to Allow Delayed Submittal of NRC Form-474, Simulation Facility Certification & to Administer Simulation Test as Upgraded,Respectively + (10:47:58, 8 January 2025)
- GO2-90-071, Application for Amend to License NPF-21,revising Tech Spec Figure 3.4.6.1 Re Pressure/Temp Limits Curve + (10:48:00, 8 January 2025)
- ML17285B181 + (10:48:00, 8 January 2025)
- ML17285B178 + (10:48:01, 8 January 2025)
- GO2-90-070, Application for Amend to License NPF-21,revising Tech Spec 3.8.2.1 to Reflect Plan to Add Addl Load to Battery During Spring 1990 Refueling Outage + (10:48:02, 8 January 2025)
- GO2-90-069, Advises That NRC Approved Use of Final Feedwater Temp Reduction in Amend 77 to License NPF-21 + (10:48:03, 8 January 2025)
- TAC:66885 + (10:48:03, 8 January 2025)
- ML17285B172 + (10:48:05, 8 January 2025)
- ML17285B171 + (10:48:06, 8 January 2025)
- ML17285B169 + (10:48:06, 8 January 2025)
- ML17285B165 + (10:48:07, 8 January 2025)
- ML17285B156 + (10:48:08, 8 January 2025)
- ML17285B153 + (10:48:09, 8 January 2025)
- GO2-90-062, Forwards Revised Schedule for Plant Equipment Setpoint Methodology Program Plan.Methodology Revised to Incorporate Latest ISA Std Draft.Setpoint Program Design Team for FY90 Onsite,Trained & Began Work on 900312 + (10:48:10, 8 January 2025)
- ML17285B141 + (10:48:11, 8 January 2025)
- TAC:75564 + (10:48:11, 8 January 2025)
- GO2-90-065, Application for Amend to License NPF-21,replacing Surveillance Requirements 4.8.1.1.2.b,c & D to Allow Implementation of More Comprehensive & Effective Fuel Oil Surveillance Program + (10:48:12, 8 January 2025)
- TAC:71741 + (10:48:13, 8 January 2025)
- GO2-90-063, Forwards Concluding Rept of Results Requested by Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety- Related Equipment. Air Quality Testing Performed to Date Reveals Steadily Improving Results + (10:48:14, 8 January 2025)
- TAC:74749 + (10:48:15, 8 January 2025)
- ML17285B136 + (10:48:16, 8 January 2025)
- ML17285B135 + (10:48:16, 8 January 2025)
- GO2-90-060, Responds to NRC Re Violations Noted in Insp Rept 50-397/89-40.Corrective Actions:Plant Procedure 10.25.63, Emergency Lighting Insp in Process of Being Expanded to Provide Instructions & Check Sheets to Ensure Uniform Insps + (10:48:17, 8 January 2025)
- GO2-90-058, Forwards Proposed Bases Change Re 891129 Request for Amend to Tech Spec Table 4.3.6.1, Srm/Irm Detector Not-Full-In Functional Test. Bases Change Describes Special Circumstances Re Test Exception + (10:48:18, 8 January 2025)
- GO2-90-057, Responds to Generic Ltr 89-19 Re Resolution of USI A-47 on Safety Implications of Control Sys in LWRs & Generic Ltr 89-21 Re Status of Implementation of Usis.Tech Specs Adequate to Verify Operability of Overfill Protection Sys + (10:48:20, 8 January 2025)
- ML17285B128 + (10:48:22, 8 January 2025)
- ML17285B127 + (10:48:23, 8 January 2025)
- ML17285B124 + (10:48:23, 8 January 2025)
- IR 05000409/2017401 + (10:48:24, 8 January 2025)
- ML17285B120 + (10:48:24, 8 January 2025)
- GO2-90-056, Suppls 900102 Response Re Implementation of fitness-for-duty Program at Facility.All Items Identified as Incomplete as of 900103 Completed at End of Jan 1990 + (10:48:25, 8 January 2025)
- ML17285B118 + (10:48:25, 8 January 2025)
- IR 05000397/1989030 + (10:48:27, 8 January 2025)
- GO2-90-050, Provides Level of Property & Liability Insurance Coverage for Facility,Per 10CFR50.54(w)(2) Annual Requirement + (10:48:29, 8 January 2025)
- ML17285B113 + (10:48:29, 8 January 2025)
- 05000397/LER-1990-005, :on 900209,nonsafety-related Circuit Breaker on Power Panel Tripped,Resulting in ESF Actuation.Caused by Equipment Mfg Error Involving Defect in Circuit Breaker Tripping Mechanism.Defective Breaker Replaced + (10:48:31, 8 January 2025)
- 05000397/LER-1990-004, :on 900208,HPCS Diesel Generator Declared Inoperable for Performance of Corrective Maint to Investigate Previous Trip of Output Circuit Breaker Which Occurred on 900204.New Droop Switch Installed + (10:48:32, 8 January 2025)
- ML17285B109 + (10:48:33, 8 January 2025)
- GO2-90-038, Application for Amend to License NPF-21,revising Tech Spec 3.4.2, Safety Relief Valves & Tables 3.3.7.5-1 & 4.3.7.5-1, Accident Monitoring Instrumentation, to Allow Monitor on Safety Valves to Be Inoperable Until Shutdown + (10:48:34, 8 January 2025)
- ML17285B108 + (10:48:34, 8 January 2025)
- ML17285B105 + (10:48:36, 8 January 2025)
- ML17285B104 + (10:48:37, 8 January 2025)
- ML17285B103 + (10:48:38, 8 January 2025)
- ML17285B101 + (10:48:39, 8 January 2025)
- ML17285B097 + (10:48:40, 8 January 2025)
- GO2-90-035, Forwards Supplementary Info Re 900214 Application for Amend to License NPF-21,revising Tech Spec 3.3.7.5 to Address Failed Safety/Relief Valve Position Indicators + (10:48:41, 8 January 2025)
- ML17285B095 + (10:48:41, 8 January 2025)
- GO2-90-033, Forwards Compilation of Responses to Regulatory Impact Survey Questionnaire,Per Generic Ltr 90-01 + (10:48:45, 8 January 2025)
- NL-17-1097, Proposed Alternatives FNP-ISI-AL T-05-02 and VEGP-ISI-AL T-04-02 in Accordance with 10 CFR 50.55a(z)(2) Hardship Without a Compensating Increase in Quality and Safety + (10:48:45, 8 January 2025)