ML17285B136
| ML17285B136 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 03/28/1990 |
| From: | Samworth R Office of Nuclear Reactor Regulation |
| To: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| References | |
| GL-89-07, GL-89-7, TAC-74749, NUDOCS 9004050456 | |
| Download: ML17285B136 (4) | |
Text
March 28, 1990 Docket 4A. 50-397 Mr. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way Richland, Washington 99352
Dear Mr. Sorensen:
DISTRIBUTION f'oc~eTiie 7
NRC tm Loca1 PDRs PD5 Reading JZwo1 ins ki PShea RSamworth CTrammell OGC ACRS (10)
SUBJECT:
LICENSEE CONFIRMATION OF ITS RESPONSE TO NRC GENERIC LETTER 89-07 (TAC NO. 74749)
By letter dated October 24, 1989 (G02-89-189),
Washington Public Power Supply System responded to NRC Generic Letter 89-07 regarding power reactor safeguards contingency planning.
In your response, you confirmed that activities required to address the issues discussed in the generic letter have been performed.
Therefore we consider this action complete.
By copy of this letter, Region 5 is advised of your position on this matter.
Sincerely, original signed by Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc:
See next page
- See previous concurrence DRSP/PD5*
PShea 3/23/90 DRSP/APM:PD5*
RSamworth:sg 3/26/90
(
)
P/D:PD5 Ct amme1 1 3/pi(90 LWNP2 74749]
V00eovoem S00S2e PDR ADOCK Ob00035'7 PDC
h,
Docket No. 50-397 Nr. G.
C. Sorensen, Manager Regulatory Programs Washington Public Power Supply System P.O.
Box 968 3000 George Washington Way Richland, Washington 99352 DISTRIBUTION NRC 8 Local PDRs PD5 Reading JZwo 1 ins ki PShea RSamworth CTrammell OGC ACRS (10)
Dear Mr. Sorensen:
SUBJECT:
LICENSEE CONFIRMATION OF ITS
RESPONSE
TO NRC NERIC LETTER 89-07 (TAC NO. 74749)
By letter dated October 24, 1989 (G02-89-189),
Waslpngton Public Power Supply System responded to NRC Generic Letter 89-07.
In~pour response, you confirmed that activities required to address the issues discussed in the generic letter have been performed.
Therefore we consider th',s action complete.
By copy of this memorandum, Region 5 is advi ed of your position on this matter.
Sincer 'ly, Robert B. Samworth, Senior Project Manager Project Directorate V
Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation cc:
See next page DRSP/P DRSP/APH:PD5
'Shea RSamworth:sg 3/+ 0
~
3/g$/90 (A)DRSP/D:PD5 CMTrammell 3/
/90 WNP2 74749]