Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-96-217, Submits Response to NRC Bulletin 96-003, Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Bwrs + (09:24:34, 8 January 2025)
- ML17292A587 + (09:24:34, 8 January 2025)
- GO2-96-216, Provides Addl Info to Assist NRC in Evaluating Issues in Insp Rept 50-397/96-16 & NOV + (09:24:36, 8 January 2025)
- ML17292A584 + (09:24:38, 8 January 2025)
- ML17292A582 + (09:24:39, 8 January 2025)
- ML17292A581 + (09:24:40, 8 January 2025)
- ML17292A578 + (09:24:41, 8 January 2025)
- ML17292A577 + (09:24:42, 8 January 2025)
- GO2-96-213, Informs That Written Summary Rept Will Be Submitted to NRC Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, within 120 Days + (09:24:43, 8 January 2025)
- ML17292A576 + (09:24:43, 8 January 2025)
- ML17292A574 + (09:24:45, 8 January 2025)
- GO2-96-208, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-16.Corrective Actions:Log Entry Corrected + (09:24:46, 8 January 2025)
- ML17292A568 + (09:24:50, 8 January 2025)
- ML17292A567 + (09:24:51, 8 January 2025)
- ML17292A563 + (09:24:51, 8 January 2025)
- ML17292A560 + (09:24:52, 8 January 2025)
- IR 05000397/1995001 + (09:24:54, 8 January 2025)
- ML17292A558 + (09:24:55, 8 January 2025)
- IR 05000397/1996001 + (09:24:56, 8 January 2025)
- ML17292A555 + (09:24:57, 8 January 2025)
- ML17292A551 + (09:24:58, 8 January 2025)
- GO2-96-199, Application for Amend to License NPF-21 to Modify TS for Secondary Containment & Standby Gas Treatment Sys to Reflect Revised Secondary Containment Drawdown & post-accident Analyses Results.Affidavit,Encl + (09:24:59, 8 January 2025)
- GO2-96-202, Responds to Addl Request by Staff That Plants W/Spring 1997 Refueling Outages Make Plant Specific Submittals Justifying Not Meeting Bulletin 96-003 Implementation Schedule.Summary of Significant Barriers to Spring 1997 & Justification,Enc + (09:25:00, 8 January 2025)
- GO2-96-200, Provides Response to Request for Addl Info on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves + (09:25:01, 8 January 2025)
- GO2-96-201, Responds to NRC Re Violations Noted in Insp Rept 50-397/96-11.Corrective Actions:Design Engineering Manager Approval of All TER Changes Required.On 960724 Scaffolding Stockpiles in RCIC & RHR a & B Rooms Removed + (09:25:03, 8 January 2025)
- GO2-96-197, Forwards Response to NRC Re Violations Noted in Insp Rept 50-397/96-16.Corrective Action:Cro Log Has Been Corrected + (09:25:04, 8 January 2025)
- GO2-96-198, Informs That Change to Met Tower Data Point Ids Reflects Configuration for Weather (Met) Signal Point Ids Associated W/Stability Class,Wind Speed & Wind Direction + (09:25:05, 8 January 2025)
- ML17292A541 + (09:25:06, 8 January 2025)
- GO2-96-194, Application for Amend to License NPF-21,requesting Addition of Section 2B(6) Re Allowance of Storage of Byproduct, Source & Special Nuclear Materials + (09:25:07, 8 January 2025)
- GO2-96-193, Monthly Operating Rept for Sept 1996 for WNP-2 + (09:25:08, 8 January 2025)
- GO2-96-190, Responds to Exercise Weakness in Insp Rept 50-397/96-13. Corrective Actions:Each Operating Crew Has Received Addl Training on Use of High Range Stack Monitor & Participated in Simulator Training + (09:25:09, 8 January 2025)
- ML17292A535 + (09:25:11, 8 January 2025)
- IR 05000397/1996017 + (09:25:12, 8 January 2025)
- ML17292A531 + (09:25:13, 8 January 2025)
- ML17292A530 + (09:25:15, 8 January 2025)
- ML17292A529 + (09:25:15, 8 January 2025)
- ML17292A525 + (09:25:16, 8 January 2025)
- ML17292A523 + (09:25:17, 8 January 2025)
- ML17292A522 + (09:25:18, 8 January 2025)
- ML17292A521 + (09:25:19, 8 January 2025)
- IR 05000397/1996015 + (09:25:20, 8 January 2025)
- ML17292A517 + (09:25:22, 8 January 2025)
- ML17292A518 + (09:25:22, 8 January 2025)
- ML17292A515 + (09:25:23, 8 January 2025)
- ML17292A514 + (09:25:24, 8 January 2025)
- ML17292A512 + (09:25:25, 8 January 2025)
- GO2-96-187, Forwards ISI Summary Rept for WNP-2s Eleventh Refueling Outage Including NIS-1 Owners Rept for ISI & NIS-2 Owners Repts for Repairs & Replacements + (09:25:26, 8 January 2025)
- ML17292A511 + (09:25:26, 8 January 2025)
- GO2-96-185, Forwards Drawing Which Was Not Submitted in to Be Withheld from Public Disclosure + (09:25:28, 8 January 2025)
- GO2-96-182, Monthly Operating Rept for Aug 1996 for WNP-2 + (09:25:29, 8 January 2025)
- ML17292A472 + (09:25:32, 8 January 2025)